← Back
Two stories - detached, small or mid-size
115 BOYLAN STREET
STATEN ISLAND · Arden Heights-Rossville · BIN 5076931
💬 Discuss this project
1974Year Built
2Stories
A1Building Class
R3-1Zoning
1,612 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,201 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 8 docs
Floor 13p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES110/25/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050110/25/2021
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
02/22/2022
Signed off — Alteration
REPAIR FIRE DAMAGED CHIMNEY, MINOR INTERIOR RENOVATIONS & ROOF REPAIR DUE TO FIRE DAMAGE. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
S00541366-I1
10/29/2021
Permit issued — General Construction
S00541366-I1-GC
10/25/2021
Filed — Alteration
REPAIR FIRE DAMAGED CHIMNEY, MINOR INTERIOR RENOVATIONS & ROOF REPAIR DUE TO FIRE DAMAGE. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
S00541366-I1
10/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
10/22/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
10/22/2021
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/16/2021
Special inspection requirement — Chimneys and vents
PAUL MARINO
06/16/2021
Special inspection requirement — Final
Hany Demetry
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC10/29/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/22/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
10/22/2021Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
10/22/2021Energy Code Compliance InspectionsPAUL MARINOprogress
06/16/2021Chimneys and ventsPAUL MARINOspecial
06/16/2021FinalHany Demetryprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026S00541366-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026S00541366-I1Open ↗
09/02/2026S00541366-I1Open ↗
09/02/2026S00541366-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026S00541366-I1Open ↗
09/02/2026S00541366-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00541366-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00541366-I1Open ↗