Roof14p · 7 filings · 20 docs
ArchitectureDMEquipmentMechanicalPlumbingStructural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP.
On file for this job
4 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY BRACING OF THE EXISTING COLUMN, SPANDREL, AND MASONRY WALL SYSTEM ALONG 125 BROAD STREET TO MAINTAIN THE STABILITY OF THE ELEMENTS AFTER DEMOLITION OF THE MOTOR ROOM AND PENTHOUSE ROOF SLAB AND FRAMING.
On file for this job
15 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Penthouse3p · 2 filings · 20 docs
ArchitectureMechanicalStructural
INSTALLATION OF TEMPORARY BRACING OF THE EXISTING COLUMN, SPANDREL, AND MASONRY WALL SYSTEM ALONG 125 BROAD STREET TO MAINTAIN THE STABILITY OF THE ELEMENTS AFTER DEMOLITION OF THE MOTOR ROOM AND PENTHOUSE ROOF SLAB AND FRAMING.
On file for this job
15 documents · 1 drawing sheet
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
Floor 251p · 3 filings · 20 docs
MechanicalStructural
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP.
On file for this job
4 documents · 1 drawing sheet
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 1 drawing sheet
CARS C&D: DUAL 7250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
On file for this job
9 documents · 1 drawing sheet
Floor 24
Floor 236p · 3 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 2 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Removal of all existing risers, fixtures, and distribution.
On file for this job
11 documents · 2 drawing sheets
Floor 2215p · 8 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2110p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 2011p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 199p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 189p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 179p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1611p · 5 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1512p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1415p · 6 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1310p · 4 filings · 20 docs
ArchitectureStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 4 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1210p · 5 filings · 20 docs
ArchitectureStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1111p · 5 filings · 20 docs
ArchitectureStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1011p · 5 filings · 20 docs
ArchitectureStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 917p · 7 filings · 20 docs
ArchitectureMechanicalStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Scope of work include the model units only; Sales office filed separately under M01108031-I1.
On file for this job
3 documents · 4 drawing sheets
This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002.
On file for this job
3 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 812p · 5 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 714p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 615p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 2 drawing sheets
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 511p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Removal of existing brick masonry, back-up wall, and existing windows along future hoist run. No change to egress, use, or occupancy.
On file for this job
7 documents · 2 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 46p · 3 filings · 20 docs
ArchitectureStructural
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 1 drawing sheet
Upgrade of lateral systems and existing columns.
On file for this job
10 documents · 2 drawing sheets
Floor 312p · 5 filings · 20 docs
ArchitectureStructural
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 3 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 3 drawing sheets
TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL SERVE AS THE BASE STRUCTURE FOR PIPE SCAFFOLDING & SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLD FILED SEP.
On file for this job
2 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 213p · 6 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows.
On file for this job
41 documents · 3 drawing sheets
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP.
On file for this job
4 documents · 1 drawing sheet
INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP.
On file for this job
8 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1Under Construction174p · 3 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Vertical enlargement and conversion to residential use of existing 22-story building.
On file for this job
214 documents · 8 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 6 drawing sheets
Removal of all existing risers, fixtures, and distribution.
On file for this job
11 documents · 2 drawing sheets
Mezzanine3p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 1 drawing sheet
Removal of all existing risers, fixtures, and distribution.
On file for this job
11 documents · 2 drawing sheets
CellarUnder Construction166p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Vertical enlargement and conversion to residential use of existing 22-story building.
On file for this job
214 documents · 5 drawing sheets
Partial demolition means and methods. Mechanical demolition equipment filed separately.
On file for this job
44 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 2 drawing sheets
Sub-CellarUnder Construction162p · 3 filings · 20 docs
ArchitectureGeneral
Issued Permit Scope
General Construction
Vertical enlargement and conversion to residential use of existing 22-story building.
On file for this job
214 documents · 1 drawing sheet
REPLACEMENT (1) NEW 20,000 GALLON OIL TANK IN THE SUBCELLAR WITH NEW 3HR CONCRETE BLOCK WALL ENCLOSURE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this job
5 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
2 documents · 2 drawing sheets