| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/14/2026 | Signed-off | PALONE BROTHERS AIR | Air Conditioning Systems | Cooling Task TYC021TW-19K 3619-A 19,500 BTU · Condensing Unit ×1 TYC021TW-25K 3619-A 25,400 BTU · Split System ×1 TYC021TW-30K 3619-A 29,900 BTU · Split System ×1 |
| 07/02/2026 | Permit Issued | K & K RENOVATION INC | Air Conditioning Systems | — |
| 12/19/2025 | Permit Issued | FLAIR NYC INC | Air Conditioning Systems, Heating Systems | |
| 07/18/2025 | Signed-off | CALLAGHAN CONSTRUCTION CO | Heating and Air Conditioning Systems, Ventilation Systems | |
| 06/30/2025 | Permit Issued | D.H.E. COMPANY, INC | Air Conditioning Systems, Others | |
| 05/14/2025 | Permit Issued | CALIBRE GROUP INC | Heating and Air Conditioning Systems | Heat / Cool |
| 03/05/2025 | Permit Issued | EDY RESTORATION CORP | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MITSUBISHI MXZ-SM48NAMHZ2-U1 54,000 BTU · Heat Pump Outdoor ×1 MITSUBISHI PEAD-A09AA9 9,000 BTU · Vrf Indoor ×1 MITSUBISHI PEAD-A12AA9 12,000 BTU · Vrf Indoor ×1 MITSUBISHI PEAD-A15AA9 15,000 BTU · Vrf Indoor ×1 MITSUBISHI PEAD-A18AA9 18,000 BTU · Fan Coil Indoor ×1 |
| 02/27/2023 | Signed-off | ACARA CONSTRUCTION INC | Air Conditioning Systems | Cooling Task TCG021TWEC-25K-3619-O 25,500 BTU · Condensing Unit ×3 TCG021TWEC-30K-3619-O 29,700 BTU · Condensing Unit ×2 |
| 02/22/2023 | — | — | Heating and Air Conditioning Systems | Heat / Cool Ice Air 8RSAN18, 8RSK09, 8RsK13 16,600 BTU · Ptac ×7 |
| 05/06/2022 | Signed-off | POLTEAM INC | Air Conditioning Systems | Cooling Mitsubishi Electric MXZ-3C30NA2 30,000 BTU · Condensing Unit ×1 |
| 02/10/2020 | Permit Issued | ALL MAKES HTG & A/C CORP | Air Conditioning Systems | Cooling Islandaire ×8 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | K.O.S. PLUMBING&HEATING,I | Gas, Water/Sanitary |
| 12/19/2025 | Permit Issued | TVS MECHANICAL CORP | Water/Sanitary |
| 07/18/2025 | Signed-off | GREAT OAKS MECHANICAL INC | Gas, Water/Sanitary |
| 06/30/2025 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 05/14/2025 | Permit Issued | NYC PLUMBING & HEATING IN | Gas, Water/Sanitary |
| 03/05/2025 | Permit Issued | SIGNORE & SONS PLBG CORP | Gas, Water/Sanitary |
| 06/23/2023 | Signed-off | GREAT OAKS MECHANICAL INC | Gas, Water/Sanitary |
| 02/27/2023 | Signed-off | HUDSON PLMBING & MCH, LLC | Gas, Water/Sanitary |
| 05/06/2022 | Signed-off | SUPER PLUMBERS CORP | Gas, Water/Sanitary |
| 03/16/2021 | Signed-off | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | W 8 ELECTRIC CORP | General Wiring |
| 07/02/2026 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 06/10/2026 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/26/2026 | Complete | AMBER ELECTL CONTNG INC | — |
| 05/11/2026 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 05/11/2026 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 04/21/2026 | Permit Issued | VERTEX ELECTRIC CORP. | General Wiring |
| 03/25/2026 | Permit Issued | LINA ELECTRIC, CORP | General Wiring |
| 03/16/2026 | Permit Issued | JUMPER ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | K.O.S. PLUMBING&HEATING,I | 1 scope_items |
| 12/19/2025 | Permit Issued | TVS MECHANICAL CORP | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Signed-off | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | K.O.S. PLUMBING&HEATING,I | Tenant Protection Plan 72 Hour |
| Owner | Filings | Most Recent |
|---|---|---|
| 115 CENTRAL PARK WEST | 603 | 07/08/2026 |
| BLACK MOUNTAIN CONSTRUCTION | 6 | 07/08/2026 |
| GUL G CONTRACTING | 4 | 07/08/2026 |
| D H E COMPANY | 3 | 07/04/2026 |
| D.H.E. COMPANY, INC. | 2 | 03/22/2026 |
| AM&G WATEREPROOFING LLC | 14 | 03/22/2026 |
| MURLINS INTERIORS LLC | 1 | 03/22/2026 |
| CENTRAL CONSTRUCTION MANA | 3 | 03/22/2026 |
| WALLACK MANAGEMENT | 25 | 03/22/2026 |
| MAJESTIC | 8 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CHARLES G. MICHEL ENGINEERING, PC. | 3 | 07/14/2026 |
| PIER FINE ASSOCIATES | 7 | 07/02/2026 |
| ALWAYS FAST SERVICES CORP | 2 | 07/02/2026 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 7 | 01/20/2026 |
| SUK DESIGN GROUP LLP | 2 | 01/20/2026 |
| ABS ENGINEERING, PLLC | 8 | 12/22/2025 |
| EMTG CONSULTANTS INC | 1 | 12/19/2025 |
| ARCHETYPE ARCHITECTURE | 2 | 12/18/2025 |
| MATTHEW BAIRD ARCHITECT PLLC | 5 | 08/05/2025 |
| ALL CITY ENGINEERING P.C. | 1 | 07/18/2025 |
| TEMPLE SIMPSON STUDIO | 2 | 07/01/2025 |
| D'ANTONIO CONSULTING ENGINEERS | 4 | 06/30/2025 |
| CRIBSTONE ENGINEERING PLLC | 1 | 06/23/2025 |
| ZASKORSKI & ASSOCIATES ARCHITECTS | 3 | 06/20/2025 |
| FUTURE MADE ARCHITECTURE, PLLC | 2 | 05/14/2025 |
| E4P CONSULTING ENGINEERING PLLC | 1 | 05/14/2025 |
| ADS ENGINEERS | 6 | 04/08/2025 |
| TANG KAWASAKI STUDIO | 4 | 03/31/2025 |
| ELIZABETH ROBERTS ARCHITECTURE & DE | 2 | 03/19/2025 |
| BADALY ENGINEERING PLLC | 1 | 03/05/2025 |
| DTLS.ARCHITECTURE | 2 | 02/25/2025 |
| ANDREW B.BALLARD,AIA ARCHITECT,PLLC | 2 | 01/13/2025 |
| THOMAS TSUE ARCHITECT | 4 | 12/24/2024 |
| CES ENGINEERING LLC | 5 | 07/02/2024 |
| BICALURO ASSOCIATES PC | 1 | 06/28/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| AGOUTI CONSTRUCTION CONSULTING | 28 | 03/21/2026 |
| AZAR ASSOCIATES | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 58 | 03/21/2026 |
| JM ZONING, LLC. | 22 | 03/21/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 9 | 03/21/2026 |
| DAO STUDIOS | 6 | 03/21/2026 |
| BOUTIQKEY | 10 | 03/21/2026 |
| NEXUS CONSULTING NYC, INC | 6 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CENTRAL CONSTRUCTION MANAGEMENT | General Contractor | 17 | 07/08/2026 |
| TC BROWNE & CO., LLC | General Contractor | 16 | 07/08/2026 |
| ACARA CONSTRUCTION INC | General Contractor | 13 | 07/08/2026 |
| JESTCOR CONTRACTING INC | General Contractor | 13 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 12 | 07/08/2026 |
| BALOG CONSTRUCTION LLC | General Contractor | 11 | 07/08/2026 |
| VELLA INTERIORS INC | General Contractor | 7 | 07/08/2026 |
| POLTEAM INC | General Contractor | 7 | 07/08/2026 |
| RUSK APARTMENT, LLC | General Contractor | 6 | 07/08/2026 |
| PEBBLE CRAFT INC | General Contractor | 6 | 03/21/2026 |
| K.J. REMODELING OF NY CO* | General Contractor | 6 | 03/21/2026 |
| STANLEY RUTH CO LLC | General Contractor | 6 | 03/21/2026 |
| EDY RESTORATION CORP | General Contractor | 5 | 09/30/2026 |
| A.L.L. CONSTRUCTION AND D | General Contractor | 5 | 07/08/2026 |
| UBERTO, LTD | General Contractor | 5 | 04/09/2026 |
| PALONE BROTHERS AIR | General Contractor | 4 | 03/21/2026 |
| STRUCTURE VENTURES LLC | General Contractor | 4 | 04/09/2026 |
| D.H.E. COMPANY, INC | General Contractor | 4 | 07/08/2026 |
| HIGHLINE CONSTRUCTION GR | General Contractor | 4 | 07/08/2026 |
| K & K RENOVATION INC | General Contractor | 3 | 04/09/2026 |
| Z S NY IMPROVEMENT CORP | General Contractor | 3 | 03/21/2026 |
| A.M.N. CORPORATION | Plumbing | 3 | 07/08/2026 |
| ANVA LLC | General Contractor | 3 | 04/09/2026 |
| STELLMANN ELECTRICAL CORP | Electrical | 3 | 03/22/2026 |
| CALLAGHAN CONSTRUCTION CORP | General Contractor | 3 | 06/17/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CHARLES G MICHEL ENGINEER | 2871 | 2 | 07/14/2026 |
| PIER, FINE ASSOCIATES | 1069 | 7 | 07/02/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 12 | 07/02/2026 |
| PROJECT TACTICAL SOLUTION | 5859 | 2 | 01/20/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 9 | 12/22/2025 |
| MARCH CHADWICK, ARCHITECT | 2253 | 2 | 12/19/2025 |
| SD TESTING & INSPECTION S | 7010 | 2 | 07/18/2025 |
| CRIBSTONE ENGINEERING PLL | 9463 | 1 | 06/23/2025 |
| ZASKORSKI & ASSOCIATES AR | 6121 | 3 | 06/20/2025 |
| HT ENGINEERING, PLLC | 6274 | 1 | 05/14/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | EDY RESTORATION CORP | 09/29/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 07/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CALIBRE GROUP INC | 04/24/2026 |
| DOB NOW | Plumbing | Permit Issued | NYC PLUMBING & HEATING IN | 04/24/2026 |
| DOB NOW | General Construction | Permit Issued | CALIBRE GROUP INC | 04/23/2026 |
| DOB NOW | Plumbing | Permit Issued | TVS MECHANICAL CORP | 03/25/2026 |
| DOB NOW | General Construction | Permit Issued | FLAIR NYC | 03/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FLAIR NYC | 03/16/2026 |
| DOB NOW | Plumbing | Permit Issued | A.M.N. CORPORATION | 03/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | K K RENOVATION | 02/26/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | EDY RESTORATION CORP | 01/26/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 01/14/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 11/17/2025 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 10/31/2025 |
| DOB NOW | General Construction | Permit Issued | D.H.E. COMPANY, INC | 10/27/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | D.H.E. COMPANY, INC | 10/24/2025 |
| DOB NOW | General Construction | Signed-off | JESTCOR CONTRACTING | 10/01/2025 |
| DOB NOW | General Construction | Signed-off | CALLAGHAN CONSTRUCTION CO | 08/20/2025 |
| DOB NOW | Plumbing | Signed-off | R.J.C. MECHANICAL CORP | 08/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | CALLAGHAN CONSTRUCTION CO | 08/19/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 07/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | EDY RESTORATION CORP | 07/22/2025 |
| DOB NOW | General Construction | Signed-off | STANLEY RUTH CO LLC | 07/11/2025 |
| DOB NOW | General Construction | Permit Issued | EDY RESTORATION CORP | 07/07/2025 |
| DOB NOW | Plumbing | Permit Issued | SIGNORE & SONS PLBG CORP | 06/26/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | XINOS CONSTRUCTION CORP | 06/25/2025 |
| DOB NOW | Plumbing | Permit Issued | SIGNORE & SONS PLBG CORP | 04/03/2025 |
| DOB NOW | General Construction | Permit Issued | EDY RESTORATION CORP | 03/31/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 03/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PALONE BROTHERS AIR | 03/19/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | D.H.E. COMPANY, INC | 03/18/2025 |
| DOB NOW | General Construction | Permit Issued | D.H.E. COMPANY, INC | 03/18/2025 |
| DOB NOW | General Construction | Signed-off | HIGHLINE CONSTRUCTION GR | 01/28/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE VENTURES LLC | 01/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | K.J. REMODELING OF NY CO* | 11/26/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PAM AIR CONDITIONING INC | 11/19/2024 |
| DOB NOW | Plumbing | Signed-off | P.S.I. MECHANICAL | 10/25/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE VENTURES LLC | 09/16/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PALONE BROTHERS AIR | 09/16/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/02/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/25/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/10/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 02/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/11/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/13/2026 | Post-installed Anchors | Young Suh | special |
| 08/13/2026 | Final | Jeffrey Fine | progress |
| 08/13/2026 | Structural Stability – Alterations of existing buildings | Jeffrey Fine | special |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Fine | special |
| 08/13/2026 | Mechanical Systems | Jeffrey Fine | special |
| 07/17/2026 | Mechanical Systems | Charles Michel | special |
| 07/17/2026 | Final | Charles Michel | progress |
| 07/09/2026 | Mechanical Systems | Charles Michel | special |
| 07/09/2026 | Final | Charles Michel | progress |
| 02/26/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Fine | special |
| 02/26/2026 | Final | Jeffrey Fine | progress |
| 02/26/2026 | Structural Stability – Alterations of existing buildings | Jeffrey Fine | special |
| 02/26/2026 | Mechanical Systems | Jeffrey Fine | special |
| 02/06/2026 | Final | WILLIAM SUK | progress |
| 01/02/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 01/02/2026 | Post-installed Anchors | William Ryan | special |
| 12/30/2025 | Final | WILLIAM SUK | progress |
| 12/19/2025 | HVAC-R and service water piping design and insulation | MARCH CHADWICK | energy_progress |
| 12/19/2025 | HVAC-R and service water heating equipment | MARCH CHADWICK | energy_progress |
| 12/19/2025 | HVAC-R and service water heating system controls | MARCH CHADWICK | energy_progress |
| 12/19/2025 | Heating Systems | MARCH CHADWICK | special |
| 12/19/2025 | Duct leakage testing, insulation and design | MARCH CHADWICK | energy_progress |
| 12/19/2025 | Maintenance information | MARCH CHADWICK | energy_progress |
| 12/19/2025 | Energy Code Compliance Inspections | MARCH CHADWICK | progress |
| 12/18/2025 | Lighting in dwelling units | Alan Berman | energy_progress |