← Back
Primarily 4 family with 1 store or office
Fac Joe Shelter Retrofit Ghpp
115 COLUMBIA STREET · BIN 3003440
💬 Discuss this project
1900Year Built
4Stories
S4Building Class
R6BZoning
6,400 sfGross Floor Area
5Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸
Primarily 4 family with 1 store or office · Owner of record: FAC CLUSTER HOUSING DEVELOPMENT FUND COR PORATION · 1,740 sf lot · 3.68 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 1 filing · 20 docs
Floor 4Under Construction18p · 1 filing · 20 docs
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction18p · 1 filing · 20 docs
CellarUnder Construction30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES407/08/2026
MSR CONSTRUCTION704/09/2026
FAC CLUSTER HOUSING DEVELOPMENT FUND COR PORATION103/22/2026
NEIGHBORHOOD RESTORE HDFC1003/22/2026
S S P CONSTRUCTION403/21/2026
FAC PRESERVATION HOUSING103/21/2026
FAC PRESERVATION HDFC103/21/2026
JOE FAC INFINITY LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L. NAOUM, P.E., P. C.405/15/2026
RIGID STRUCTURAL DESIGN, LLC210/02/2025
MJE PROFESSIONAL SERVICES103/11/2025
OLD STRUCTURES ENGINEERING, P.C.105/14/2024
ESKW/A104/03/2024
KUSHNER STUDIOS102/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
SNR EXPEDITING DESIGN203/21/2026
KUSHNER STUDIOS103/21/2026
Rigid Structural Design, LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor507/08/2026
MSR CONSTRUCTION CORPGeneral Contractor204/09/2026
AJC PLUMBING & HTG CORPPlumbing207/08/2026
TORRES IVANElectrical103/21/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803705/15/2026
Building Lifecycle
All (92)Filed (10)Permit Issued (10)Signed Off (3)Violation (28)Inspection (3)Objection (8)Special Inspection (30)
08/12/2026
Objection resolved — Resolved
06/26/2026
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01291175-I1
06/26/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01290358-I1
06/02/2026
Objection raised — Other
05/15/2026
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-P1
05/15/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/15/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
05/04/2026
Violation issued (HPD, closed)
A
03/03/2026
Permit issued — Structural
B01019929-S3-ST
03/03/2026
Permit issued — General Construction
B01019929-I1-GC
02/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/08/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/01/2025
Permit issued — Boiler Equipment
B01019929-S4-BE
12/01/2025
Permit issued — Plumbing
B01019929-S1-PL
10/02/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01290358-I1
10/02/2025
Permit issued — Supported Scaffold
B01290358-I1-SF
10/01/2025
Permit issued — Protection and Mechanical Methods
B01291175-I1-PMM
09/30/2025
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01291175-I1
07/28/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INCLUDING CREATING A TAKEOUT AREA WITH NEW COUNTERTOP & A NEW WALK-IN REFRIGERATOR AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
B00989485-I1
03/17/2025
Permit issued — Sidewalk Shed
B01192558-I1-SH
03/11/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01192558-I1
03/05/2025
Permit issued — Structural
B01019929-S3-ST
03/05/2025
Permit issued — General Construction
B01019929-I1-GC
05/22/2024
Objection resolved — Addressed
05/14/2024
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-S3
05/14/2024
Objection raised — Other
05/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
05/14/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/14/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
05/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/14/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
05/07/2024
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-S2
05/07/2024
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-S1
05/07/2024
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-S4
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/07/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/07/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/01/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/17/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Other
04/09/2024
Violation issued (HPD, closed)
A
04/03/2024
Filed — Alteration
BOILER REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01019929-I1
04/01/2024
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
04/01/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2026
DOB NOWBoiler EquipmentPermit IssuedAJC PLUMBING & HTG CORP12/01/2025
DOB NOWPlumbingPermit IssuedAJC PLUMBING & HTG CORP12/01/2025
DOB NOWSupported ScaffoldSigned-offMSR CONSTRUCTION CORP10/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR CONSTRUCTION CORP10/01/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/17/2025
DOB NOWStructuralPermit IssuedA.A.D. CONSTRUCTION CORP03/05/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/05/2025
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC02/28/2024
BISFPISSUEDMASTER FIRE SYSTEMS, INC01/21/2016
BISOTISSUEDK.E.S CONSTRUCTION CO INC10/21/2015
BISEQISSUEDSSP CONSTRUCTION CORP09/21/2015
BISEQISSUEDSSP CONSTRUCTION CORP09/15/2015
BISFPISSUEDACTIVE FIRE CONTROL, INC04/25/2014
BISMHISSUEDC & I PLUMBING CONSTRUCTION INC11/18/2013
BISOTISSUEDC & I PLUMBING CONSTRUCTION INC05/07/2013
BISFPISSUEDNY FIRE LLC10/26/2010
BISFPISSUEDN.Y BUSINESS FIRE SYS INC06/03/2009
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/31/2006
BISPLISSUEDAVON PLBG & HTG INC04/25/2006
BISOTRE-ISSUEDJABUS BUILD CORP04/25/2006
BIS—ISSUEDBRUNO FRUSTACI CONTRACTING INC04/18/2005
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD CO I01/05/2005
BISEQISSUEDBRUNO FRUSTACI CONTRACTING INC12/16/2004
BISPLISSUEDONOFRIO LODUCA PLBG CORP10/07/2004
BISPLISSUEDONOFRIO LODUCA PLBG CORP10/07/2004
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD CO I09/17/2004
BIS—ISSUEDBRUNO FRUSTACI CONTRACTING INC06/28/2004
1 project · most recent 05/15/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/15/2026Permit IssuedAJC PLUMBING & HTG CORPStorm, Water/Sanitary
1 project · most recent 03/13/2025
FiledStatusContractorScope
03/13/2025CompleteRICHARD NEU—
1 project · most recent 05/15/2026
Steel Masonry
FiledStatusContractorScope
05/15/2026Permit IssuedA.A.D. CONSTRUCTION CORPSteel, Masonry
2 projects · most recent 10/02/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/02/2025Signed-offMSR CONSTRUCTION CORPScaffold
03/11/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
05/15/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/15/2026Tenant Protection Plan Compliance—special
05/15/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/15/2026FinalSAMI HAJJAR P.Eprogress
05/15/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/15/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/15/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/15/2026Heating SystemsSAMI HAJJAR P.Especial
05/15/2026Mechanical SystemsSAMI HAJJAR P.Especial
05/14/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
05/14/2024MasonrySAMI HAJJAR P.Especial
05/14/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
05/14/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/14/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
05/07/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/07/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/07/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/07/2024Heating SystemsSAMI HAJJAR P.Especial
05/06/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/06/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/06/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/06/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/06/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/06/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/01/2024Heating SystemsSAMI HAJJAR P.Especial
Latest 25 of 39.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/26/2026B00989485-I1Request digital key ↗
08/22/2026B01192558-I1Request digital key ↗
08/20/2026B01291175-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION13
03/10/2021321250150Open ↗
01/25/2016321290045Open ↗
12/28/2015321290045Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
11/12/2015321250150Open ↗
10/23/2015321260283Open ↗
10/08/2015321250150Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/18/2015321250150Open ↗
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
04/14/2016321250150Open ↗
04/08/2016321290045Open ↗
01/25/2016321290045Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00989485-I1Open ↗
08/22/2026B01192558-I1Open ↗
08/20/2026B01291175-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026B01019929-P1Open ↗
08/26/2026B01019929-P1Open ↗
08/24/2026B01019929-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01019929-S4Open ↗
08/29/2026B01019929-S1Open ↗
08/26/2026B01019929-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/28/2015321290045Open ↗
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/28/2015321290045Open ↗
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/17/2015340303763Open ↗
09/05/2015340299732Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/17/2015340303763Open ↗
09/05/2015340299732Open ↗
▸Trade Schedules & Equipment5
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/21/2014320895938Open ↗
12/02/2013320895938Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/24/2015321250150Open ↗
10/05/2015321250150Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/08/2016321290045Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00989485-I1Open ↗
08/17/2026B01019929-P1Open ↗
08/13/2026B01019929-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
11/13/2013320882443Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/22/2010320228133Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/02/2009320025511Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/14/2016321250150Open ↗
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/14/2016321250150Open ↗
01/21/2014320895938Open ↗
08/08/2013320740409Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/17/2015340303763Open ↗
09/05/2015340299732Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/17/2026B01019929-P1Open ↗
08/13/2026B00989485-I1Open ↗
08/13/2026B01019929-S3Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
11/13/2013320882443Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/14/2016321250150Open ↗
04/08/2016321290045Open ↗
01/21/2014320895938Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/21/2014320895938Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
04/14/2016321250150Open ↗
04/08/2016321290045Open ↗
12/28/2015321290045Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET8
12/28/2015321290045Open ↗
10/23/2015321260283Open ↗
10/05/2015321250150Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION3
09/28/2020321250150Open ↗
09/18/2020321250150Open ↗
12/24/2015321250150Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/17/2015340303763Open ↗
09/05/2015340299732Open ↗
▸Other Documents1
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
08/24/2009320025511Open ↗