← Back
Walk-up cooperative
115 EAST 10 STREET
MANHATTAN · East Village · BIN 1077989
💬 Discuss this project
1870Year Built
3Stories
C6Building Class
R8BZoning
27,111 sfGross Floor Area
56Units
Rent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: 111 EAST 10TH ST INC · 12,555 sf lot · 2.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CFA MANAGEMENT1304/09/2026
111 EAST 10TH STREET203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOREMAS406/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
INSPIRIT DEVELOPMENT & COGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666206/10/2025
Building Lifecycle
All (32)Filed (4)Permit Issued (3)Signed Off (2)Violation (2)Inspection (3)Objection (14)Special Inspection (4)
04/07/2026
Signed off — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-S1
03/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Signed off — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-I1
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2026
Permit issued — Plumbing
M01108433-S1-PL
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2025
Filed — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-P2
06/10/2025
Filed — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-P1
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
05/28/2025
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
05/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
05/28/2025
Special inspection requirement — Final
K KIM
03/12/2025
Permit issued — General Construction
M01108433-I1-GC-CX
03/10/2025
Permit issued — Plumbing
M01108433-S1-PL
02/21/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
01/07/2025
Objection resolved — Addressed
12/10/2024
Objection raised — Cost
12/10/2024
Objection raised — Scope
12/10/2024
Objection raised — Structural
12/10/2024
Objection raised — Scope
12/10/2024
Objection raised — Fire_Protection
12/10/2024
Objection raised — Zoning
12/10/2024
Objection raised — Structural
12/05/2024
Filed — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-S1
12/05/2024
Filed — Alteration
Interior renovations to apt. #15 in existing non-elevator building. Work to include non-structural demo, general construction, finishes, and new ductless split system HVAC installation as per plans filed herewith. No change in use, egress, or occupancy.
M01108433-I1
04/16/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC03/09/2026
DOB NOWGeneral ConstructionSigned-offINSPIRIT DEVELOPMENT & CO03/12/2025
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC03/10/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/28/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/28/2025Mechanical SystemsALEKSANDR LEVINspecial
05/28/2025Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
05/28/2025FinalK KIMprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026M01108433-S1Request digital key ↗
08/23/2026M01108433-I1Request digital key ↗
08/23/2026M01108433-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/23/2026M01108433-I1Open ↗
08/23/2026M01108433-S1Open ↗
08/13/2026M01108433-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026M01108433-I1Open ↗
08/23/2026M01108433-S1Open ↗
08/13/2026M01108433-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026M01108433-P1Open ↗
08/31/2026M01108433-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026M01108433-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01108433-I1Open ↗
08/13/2026M01108433-S1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/23/2026M01108433-I1Open ↗
08/13/2026M01108433-P1Open ↗