115 EAST 97 STREET
MANHATTAN · East Harlem (South) · BIN 1089351
💬 Discuss this project
2014Year Built
10Stories
W3Building Class
R7-2Zoning
110,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
School or academy · Owner of record: MARYMOUNT SCHOOL OF NEW YORK · 15,138 sf lot · 7.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof8p · 6 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 106p · 4 filings · 20 docs
Floor 92p · 2 filings · 20 docs
Floor 82p · 2 filings · 20 docs
Floor 73p · 2 filings · 20 docs
Floor 67p · 4 filings · 20 docs
Floor 52p · 2 filings · 18 docs
Floor 42p · 2 filings · 20 docs
Floor 35p · 6 filings · 20 docs
Floor 27p · 7 filings · 20 docs
Floor 15p · 5 filings · 20 docs
Cellar6p · 5 filings · 20 docs
Sub-Cellar16p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MARYMOUNT SCHOOL5807/08/2026
MARYMOUNT SCHOOL OF NEW YORK3003/22/2026
MARYMOUNT SCHOOL OF NY1603/22/2026
JJ MATTHEWS INC503/22/2026
CRANES EXPRESS INC103/22/2026
TRITON CONSTRUCTION CO.,403/22/2026
CASINO DEVELOPMENT GROUP103/22/2026
KELCO CONSTRUCTION203/22/2026
1625 WEST LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4303/21/2026
A1 EXPEDITING SERVICE3403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
ADJ ENGINEERING PLLC403/21/2026
EUROCELT EXPEDITING, INC203/21/2026
DARLIS SEVERINO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E BRIDGE & SCAFFOLD LLC.General Contractor4607/08/2026
STAT FIRE SPRINKLER NYC CFire Protection1107/08/2026
TRITON CONSTRUCTION CO.,General Contractor403/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
A & M WARSHAW PLBG & HTGPlumbing307/08/2026
HOME CRAFTS, INCGeneral Contractor203/21/2026
RX ELECTRIC INCElectrical203/22/2026
JJ MATTHEWS INCGeneral Contractor203/21/2026
MONGONE ANTHONYGeneral Contractor103/21/2026
MICHAEL LIGUORIElectrical103/21/2026
TRADELINE PLUMBINGGeneral Contractor103/21/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
CS BRIDGE CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROJECT TACTICAL SOLUTION5859707/19/2023
ROBERT F. GERMAIN JR. PE5100105/03/2023
Building Lifecycle
All (248)Filed (52)Permit Issued (49)Signed Off (19)Violation (24)Inspection (6)Objection (75)Special Inspection (23)
09/18/2025
Violation issued (FDNY_ORDER, closed)
03/12/2024
Signed off — Alteration
FILING HEREWITH INSTALLATION OF NEW SPRINKLER & STANDPIPE SYSTEM IN CONJUNCTION WITH NB APPLICATION AS PER PLANS.
M00356663-I1
02/22/2024
Signed off — Alteration
Alteration application filed herewith for interior temporary 2 hr. rated walls in conjunction with occupant protection plan for first TCO phase. No change of use, occupancy or egress.
M00864923-I1
02/21/2024
Signed off — Alteration
FILING HEREWITH CURB CUT AS PER PLANS N CONJUNCTION WITH NEW BUILDING.
M00513266-I1
02/16/2024
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS DURING NB CONST. FILED SEP. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON SW AND RDWY. DOT PERMITS BY OTHERS
M00214607-I1
02/14/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/19/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00673751-I1
01/05/2024
Special inspection requirement — Public Assembly Emergency Lighting
Max Lee
12/13/2023
Filed — No Work
M08026096-P1
12/11/2023
Special inspection requirement — Public Assembly Emergency Lighting
Max Lee
11/20/2023
Violation issued (FDNY_ORDER, closed)
11/20/2023
Violation issued (FDNY_ORDER, closed)
09/29/2023
Permit issued — Supported Scaffold
M00673751-I1-SF
09/27/2023
Permit issued — Construction Fence
M00214607-I1-FN
09/26/2023
Violation issued (ECB, closed)
Unknown
09/13/2023
Signed off — Alteration
INSTALL (1) NEW GAS FIRED DIRECT VENT FIREPLACE ON GROUND FLOOR. ALL STRUCTUAL DETAILS SUPPORTS, GAS, ETC. FILED UNDER NB 12189864. NO CHANGE IN MANS OF EGRESS USE GROUP OR OCCUPANCY.
M00863331-I1
09/06/2023
Violation issued (FDNY_ORDER, closed)
09/06/2023
Violation issued (FDNY_ORDER, closed)
09/06/2023
Violation issued (FDNY_ORDER, closed)
08/30/2023
Objection resolved — Addressed
08/30/2023
Special inspection requirement — Public Assembly Emergency Lighting
Max Lee
08/29/2023
Filed — No Work
M08026095-P1
08/29/2023
Filed — No Work
M08026100-P1
08/29/2023
Filed — No Work
M08026102-P1
08/29/2023
Objection raised — Other
08/24/2023
Special inspection requirement — Public Assembly Emergency Lighting
Max Lee
08/24/2023
Special inspection requirement — Public Assembly Emergency Lighting
Max Lee
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Admin
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Admin
08/21/2023
Objection raised — Admin
08/18/2023
Filed — No Work
M00920533-I1
08/18/2023
Filed — No Work
M00921320-I1
08/18/2023
Filed — No Work
M00920570-I1
08/18/2023
Filed — No Work
M00920518-I1
08/17/2023
Signed off — Alteration
New Temporary Standpipe System
M00191667-I1
08/09/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00750208-I1
08/02/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AT ADJACENT PROPERTIES DURING NEW BLDG CONSTRUCTION, FILED SEP. TEMPORARY ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00478153-I1
08/02/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD STAIR TOWER AS PER DRAWINGS. SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00683175-I1
08/02/2023
Signed off — Alteration
STAIRCASE F: INSTALLATION OF TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M08026627-I1
08/02/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NEW BUILDING CONSTRUCTION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M00471277-I1
08/02/2023
Objection resolved — Addressed
08/02/2023
Objection resolved — Addressed
08/02/2023
Objection resolved — Addressed
08/01/2023
Signed off — Alteration
FILING HEREWITH REVISED UNDERGROUND PLUMBING PLANS TO SHOW ADDITIONAL FLOOR DRAIN IN THE ELEVATOR LOBBY ( SUBCELLAR 2). PLEARE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
M00354229-I1
07/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
07/26/2023
Special inspection requirement — Standpipe Systems
Max Lee
07/26/2023
Special inspection requirement — Sprinkler Systems
Max Lee
07/19/2023
Filed — Alteration
FILING HEREWITH REVISED UNDERGROUND PLUMBING PLANS TO SHOW ADDITIONAL FLOOR DRAIN IN THE ELEVATOR LOBBY ( SUBCELLAR 2). PLEARE REFER TO COMMENTS SECTION FOR UPDATED PLANS.
M00354229-P2
07/19/2023
Filed — Alteration
FILING HEREWITH INSTALLATION OF NEW SPRINKLER & STANDPIPE SYSTEM IN CONJUNCTION WITH NB APPLICATION AS PER PLANS.
M00356663-P2
07/18/2023
Special inspection requirement — Sprinkler Systems
Max Lee
07/18/2023
Special inspection requirement — Standpipe Systems
Max Lee
07/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
07/14/2023
Signed off — Alteration
REFILING OF APPROVED APPLICATION # M08040006 WITH CORRECT EQUIPMENT SCHEDULE. INSTALLATION OF FUEL STORAGE FOR GENERATOR IN CONJUNCTION WITH NB 121189864. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00868730-I1
06/29/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/28/2023
Permit issued — Curb Cut
M00513266-I1-CC
06/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/01/2023
Permit issued — Boiler Equipment
M00868730-I1-BE
06/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 248 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/29/2023
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/27/2023
DOB NOWCurb CutSigned-offTRITON CONSTRUCTION CO.,06/28/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ06/01/2023
DOB NOWGeneral ConstructionSigned-offTRITON CONSTRUCTION CO.,05/16/2023
DOB NOWGeneral ConstructionSigned-offHOME CRAFTS05/05/2023
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C04/12/2023
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C04/05/2023
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/13/2022
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/12/2022
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC10/25/2022
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC10/04/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC10/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC10/03/2022
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/30/2022
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG09/30/2022
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/17/2022
DOB NOWSupported ScaffoldSigned-offJJ MATTHEWS07/28/2022
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C04/13/2022
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C04/06/2022
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C04/06/2022
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC02/18/2022
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP02/17/2022
DOB NOWSupported ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC02/04/2022
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2021
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC12/02/2021
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/21/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/15/2021
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG09/14/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC07/13/2021
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C06/08/2021
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C06/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC04/27/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC04/27/2021
DOB NOWStandpipeSigned-offSTAT FIRE SPRINKLER NYC C04/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC03/02/2021
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC02/17/2021
+ 34 more permits on file
8 projects · most recent 06/20/2025
General Wiring
FiledStatusContractorScope
06/20/2025CompleteMONTGOMERY ELEC'L CONTR'GGeneral Wiring
04/28/2025CompleteRX ELECTRIC INC1 meters, 1 new_meters
04/26/2021CompleteNASH ELECTRIC SERVICES IN—
04/26/2021CompleteNASH ELECTRIC SERVICES IN—
04/26/2021CompleteNASH ELECTRIC SERVICES IN—
04/15/2021CompleteRX ELECTRIC INC—
04/15/2021CompleteRX ELECTRIC INCGeneral Wiring
04/01/2020CompleteINTER CONNECTION ELETRICGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/14/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
06/29/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/05/2024Public Assembly Emergency LightingMax Leeprogress
12/11/2023Public Assembly Emergency LightingMax Leeprogress
08/30/2023Public Assembly Emergency LightingMax Leeprogress
08/24/2023Public Assembly Emergency LightingMax Leeprogress
08/24/2023Public Assembly Emergency LightingMax Leeprogress
07/26/2023Fire-Resistant Penetrations and JointsMax Leespecial
07/26/2023Standpipe SystemsMax Leespecial
07/26/2023Sprinkler SystemsMax Leespecial
07/18/2023Sprinkler SystemsMax Leespecial
07/18/2023Standpipe SystemsMax Leespecial
07/18/2023Fire-Resistant Penetrations and JointsMax Leespecial
05/22/2023FinalLESLEY SCHMERZLERprogress
05/03/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
05/02/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMax Leespecial
04/21/2023Chimneys and ventsRobert Germain Jr.special
04/21/2023FinalRobert Germain Jr.progress
10/06/2022HVAC-R and service water heating system controlsMax Leeenergy_progress
10/06/2022HVAC-R and service water heating equipmentMax Leeenergy_progress
10/06/2022Maintenance informationMax Leeenergy_progress
10/04/2022Heating SystemsMax Leespecial
06/20/2022Standpipe SystemsMax Leespecial
06/20/2022Sprinkler SystemsMax Leespecial
06/20/2022Fire-Resistant Penetrations and JointsMax Leespecial
▾Documents — 569 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch27
09/04/2026M00478153-P1Request digital key ↗
09/04/2026M00478153-I1Request digital key ↗
09/03/2026M00510227-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly9
09/01/2026M08026102-P1Request digital key ↗
09/01/2026M08026097-I1Request digital key ↗
08/29/2026M08026095-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly5
09/05/2026M00234996-I1Request digital key ↗
08/29/2026M00920533-I1Request digital key ↗
08/15/2026M00921320-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/04/2026M00356663-I1Request digital key ↗
09/04/2026M00356663-P2Request digital key ↗
08/15/2026M00191667-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/29/2026M00354229-P2Request digital key ↗
08/15/2026M00354229-I1Request digital key ↗
08/15/2026M00354229-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00471277-I1Request digital key ↗
09/03/2026M00471277-P2Request digital key ↗
08/15/2026M00471277-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00356663-I1Request digital key ↗
09/04/2026M00356663-P2Request digital key ↗
08/14/2026M00356663-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00214607-I1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION46
02/28/2024121189864Open ↗
02/23/2024121189864Open ↗
12/26/2023123555018Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION28
10/09/2021121189864Open ↗
07/15/2021141003651Open ↗
07/08/2021141003651Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
01/18/2023121189864Open ↗
Showing 1 of 2 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/26/2024123555018Open ↗
Showing 1 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/12/2024123555018Open ↗
03/17/2023123555018Open ↗
▸Zoning, Tax Lot & Property Records12
▸BISZONING DIAGRAM2
01/07/2021121189864Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
04/11/2023121189864Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNEW ZONING EXHIBIT III CRFN SHOULD BE ADDED TO PW1 AND SCH A.1
07/03/2023121189864Open ↗
▸BISVERIFY TAX LOT1
04/13/2023121189864Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/09/2023121189864Open ↗
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature52
09/05/2026M00214607-I1Open ↗
09/04/2026M00356663-P2Open ↗
09/04/2026M00356663-I1Open ↗
Showing 3 of 52 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026M08015107-I1Open ↗
09/23/2026M00863331-I1Open ↗
09/20/2026M08026102-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M08015107-I1Open ↗
09/23/2026M00863331-I1Open ↗
09/23/2026M00863331-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/06/2021141003651Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/06/2021141003651Open ↗
▸Trade Schedules & Equipment25
▸BISEquipment Use Permits14
08/08/2023121189864Open ↗
08/08/2023121189864Open ↗
08/08/2023121189864Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING6
07/19/2023121189864Open ↗
05/05/2023121189864Open ↗
02/08/2023121189864Open ↗
Showing 3 of 6 on file for this type
▸BISEquipment Use Application Permit3
08/08/2023121189864Open ↗
08/08/2023121189864Open ↗
08/08/2023121189864Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/24/2023121189864Open ↗
▸BISSewer Connection Dep Sd1 Amp Sd21
01/07/2021121189864Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/29/2024121189864Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAs Built Energy Analysis En21
03/29/2024121189864Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/15/2023121189864Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08015107-I1Open ↗
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY17
03/29/2024121189864Open ↗
07/07/2023141003651Open ↗
05/22/2023121189864Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
01/31/2022121189864Open ↗
01/31/2022121189864Open ↗
11/12/2021121189864Open ↗
Showing 3 of 10 on file for this type
▸BISTechnical Report Responsibility Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
04/13/2023121189864Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/15/2026M00191667-I1Open ↗
▸Approvals, Objections & Sign-offs101
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter51
09/05/2026M00214607-I1Open ↗
09/04/2026M00356663-P2Open ↗
09/04/2026M00356663-I1Open ↗
Showing 3 of 51 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE19
02/28/2024121189864Open ↗
02/23/2024121189864Open ↗
06/30/2023121189864Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
04/03/2021121189864Open ↗
04/03/2021121189864Open ↗
01/07/2021121189864Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
07/07/2023141003651Open ↗
01/26/2023123779740Open ↗
Showing 2 of 8 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL3
06/19/2023121189864Open ↗
Showing 1 of 3 on file for this type
▸BISFINAL2
07/07/2023141003651Open ↗
01/24/2023123779740Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT8
07/06/2021141003651Open ↗
Showing 1 of 8 on file for this type
▸BISProject Specific Gl Insurance5
12/26/2023121189864Open ↗
11/28/2023121189864Open ↗
02/13/2023121189864Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/07/2023141003651Open ↗
01/25/2023123779740Open ↗
▸Filing & Intake Forms42
▸BISADDITIONAL INFORMATION26
03/22/2024121189864Open ↗
03/19/2024121189864Open ↗
02/29/2024121189864Open ↗
Showing 3 of 26 on file for this type
▸BISEFILING COVER SHEET9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBOROUGH INTAKE FORM3
12/26/2023121189864Open ↗
11/28/2023121189864Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00510214-P1Open ↗
▸Other Documents29
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
01/07/2021121189864Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)2
06/01/2023121189864Open ↗
06/01/2023121189864Open ↗
▸DOB NOWAlternate Plan 12
08/29/2026M08026095-I1Open ↗
08/29/2026M08026095-P1Open ↗
▸DOB NOWAlternate Plan 42
08/29/2026M08026095-P1Open ↗
08/29/2026M08026095-I1Open ↗
▸DOB NOWAlternate Plan 32
08/29/2026M08026095-I1Open ↗
08/29/2026M08026095-P1Open ↗
▸DOB NOWAlternate Plan 52
08/29/2026M08026095-P1Open ↗
08/29/2026M08026095-I1Open ↗
▸DOB NOWAlternate Plan 22
08/29/2026M08026095-I1Open ↗
08/29/2026M08026095-P1Open ↗
▸DOB NOWAlternate Plan 62
08/29/2026M08026095-P1Open ↗
08/29/2026M08026095-I1Open ↗
▸BISVESTIBULES1
06/15/2023121189864Open ↗
▸BISMAINTENANCE INFORMATION1
07/07/2023121189864Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
04/26/2024123555018Open ↗
▸BISSITE CONNECTION: DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHydraulic Calculations1
08/13/2026M00191667-I1Open ↗