← Back
BuildNYC
Over six families without stores
115 EAST MOSHOLU PARKWAY NORTH
BRONX · BIN 2017719
💬 Discuss this project
1924Year Built
5Stories
C1Building Class
R7-1Zoning
92,000 sfGross Floor Area
95Units
LL97 CoveredRent Stabilized106 Active Violations 105 unresolved · 1 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: Emerald 115 Mosholu · 17,852 sf lot · 5.15 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarLiamssrioge gas and water piping replacement16p · 2 filings · 20 docs
BasementRemove illegal bathrooms in basement2p · 1 filing · 12 docs
Sub-BasementRemove illegal bathrooms in basement1p · 1 filing · 12 docs
Site & exteriorHeavy duty sidewalk shed5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
O. Ragoo Realty303/21/2026
1605 Realty203/21/2026
SG2 Properties203/21/2026
Emerald 115 Mosholu103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
West Aze203/21/2026
Sandeep Kaur203/21/2026
Lewsan Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.B. & SonPlumbing907/08/2026
C Z Mechanical PLG HeatingPlumbing503/21/2026
GB & SonGeneral Contractor203/21/2026
MSS ConstructionGeneral Contractor103/21/2026
O Ragoo ManagementGeneral Contractor103/21/2026
High Quality ElectricElectrical103/21/2026
Plumbing CompnayPlumbing103/21/2026
Apex Group NYScaffold104/09/2026
Philip Toscano ArchitectsGeneral Contractor103/21/2026
Davrial EnterprisesGeneral Contractor103/21/2026
Advance ScaffoldingGeneral Contractor109/15/2000
DMT Plumbing & HeatingPlumbing105/31/2012
Eager Beaver Renovation & DemolitionGeneral Contractor105/05/2001
Ramapo CommunicationGeneral Contractor112/02/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355110/25/2023
New York Engineering Associates851203/15/2023
Winton Group Architecture4343108/28/2022
Building Lifecycle
11/12/2026
Boiler inspection report filed
Initial · no defects · Payment Verification In Progress
09/30/2026
Signed off — Alteration
INSTALLATION OF OUTRIGGER FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED.
X01349785-I1
08/30/2026
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT…
HPD violation · closed
08/30/2026
§ 27-2010, 2011, 2012 ADM code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage at…
HPD violation · closed
06/07/2026
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT E12, 1st STORY, 1st APARTMENT FROM SOUTH…
HPD violation · open
229 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offApex Group NY02/27/2026
DOB NOWSuspended ScaffoldSigned-offApex Group NY02/19/2026
DOB NOWPlumbingPermit IssuedG.B. & Son01/16/2024
DOB NOWGeneral ConstructionSigned-offGB Son11/16/2023
DOB NOWPlumbingSigned-offG.B. & Son11/09/2023
DOB NOWBoiler EquipmentSigned-offG. Bauer10/26/2020
BISOTISSUEDRamapo Communication12/02/2016
BISPLISSUEDDMT Plumbing & Heating05/31/2012
BISFBISSUEDDMT Plumbing & Heating05/31/2012
BISFSISSUEDEdward Levinson11/23/2011
BISFSISSUEDJames Rhodes01/13/2011
BISEQISSUEDM.S.S. Construction03/30/2009
BISOTISSUEDDavrial Enterprises01/11/2005
BISPLISSUEDThe Plumbing Compnay02/13/2004
BIS—ISSUEDO Ragoo Management01/07/2004
BISPLISSUEDC & Z Mechanical P & H04/04/2002
BISPLISSUEDC & Z Mechanical P & H04/04/2002
BISPLISSUEDC & Z Mechanical P & H04/04/2002
BISPLISSUEDC & Z Mechanical P & H04/04/2002
BISPLISSUEDC & Z Mechanical P & H07/23/2001
BISPLISSUEDC & Z Mechanical P & H06/05/2001
BISOTISSUEDEager Beaver Renovation & Demolition05/05/2001
BISPLISSUEDC & Z Mechanical P & H02/20/2001
BISOTISSUEDPhilip Toscano02/20/2001
BISPLISSUEDC & Z Mechanical P & H09/15/2000
BISEQISSUEDAdvance Scaffolding09/15/2000
BISOTISSUEDM.S.S. Construction08/30/2000
3 projects · most recent 12/22/2025
General Wiring Boiler Controls
FiledStatusContractorScope
12/22/2025Permit IssuedHigh Quality Electric of NYC—
06/23/2023CompleteAlltech Electrical ContngGeneral Wiring
10/20/2020Permit IssuedCounty Electrical Contractor IBoiler Controls
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/03/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/17/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
10/17/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
10/17/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/14/2023FinalSteven Bendoraitisprogress
03/15/2023Heating SystemsLOUIS ARENAspecial
03/15/2023HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/15/2023HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/15/2023Maintenance informationLOUIS ARENAenergy_progress
03/13/2023Maintenance informationLOUIS ARENAenergy_progress
03/13/2023HVAC and service water heating system controls LOUIS ARENAenergy_progress
03/13/2023HVAC and service water heating equipment LOUIS ARENAenergy_progress
03/13/2023Heating SystemsLOUIS ARENAspecial
106 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account