← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
115 MERCER STREET
MANHATTAN · BIN 1007618
💬 Discuss this project
1872Year Built
7Stories
RMBuilding Class
M1-5/R7XZoning
26,691 sfGross Floor Area
10Units
LL97 Covered17 Open Violations 16 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 5,000 sf lot · 5.34 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Roof1p · 1 filing · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar7p · 3 filings · 20 docs
Basement1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
115 MERCER STREET CONDOMI203/22/2026
I ASSOCIATES DEVELOPM103/22/2026
I ASSOCIATES DEVELOPME103/22/2026
HKS CONSTRUCTION703/21/2026
115 MERCER STREET1003/21/2026
115 MERCER1303/21/2026
DCD CAPITAL4503/21/2026
TAUBE MANAGEMENT603/21/2026
113 MERCER STREET103/21/2026
SIGNEXPO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BURNHAM NATIONWIDE INC403/21/2026
LOUIS STRIAR203/21/2026
SPEEDY EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAJO INCGeneral Contractor307/08/2026
JAVIER VALERA ACEROElectrical103/21/2026
TORRES IVANElectrical103/21/2026
BUILDOPS INCGeneral Contractor107/08/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004301/20/2025
OUTSOURCE SPECIAL INSPECT2827108/08/2022
Building Lifecycle
All (127)Filed (6)Permit Issued (5)Signed Off (4)Facade (FISP) (15)Violation (56)Inspection (2)Objection (24)Special Inspection (15)
04/29/2026
Violation issued (HPD, open)
A
01/14/2026
Signed off — Alteration
Mechanical Work in conjunction with renovation of cellar and 1st floor of an existing building. Replace 5 HP Air-Handler Unit Replaced In-Kind, connected to an Existing Chiller. No Modification of AC Piping or Ductwork.
M01114825-I1
01/12/2026
Signed off — Alteration
Mechanical Work in conjunction with renovation of cellar and 1st floor of an existing building. Replace 5 HP Air-Handler Unit Replaced In-Kind, connected to an Existing Chiller. No Modification of AC Piping or Ductwork.
M01114825-S1
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, open)
A
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
01/22/2025
Special inspection requirement — Final
ERIC BERLENT
01/20/2025
Filed — Alteration
Mechanical Work in conjunction with renovation of cellar and 1st floor of an existing building. Replace 5 HP Air-Handler Unit Replaced In-Kind, connected to an Existing Chiller. No Modification of AC Piping or Ductwork.
M01114825-P1
01/15/2025
Cycle 9 facade report signed — SWARMP
01/14/2025
Permit issued — Mechanical Systems
M01114825-S1-MS
01/14/2025
Permit issued — General Construction
M01114825-I1-GC
12/26/2024
Cycle 9 facade report submitted
12/18/2024
Cycle 9 facade inspection completed
11/22/2024
Violation issued (HPD, open)
I
10/28/2024
Filed — Alteration
Mechanical Work in conjunction with renovation of cellar and 1st floor of an existing building. Replace 5 HP Air-Handler Unit Replaced In-Kind, connected to an Existing Chiller. No Modification of AC Piping or Ductwork.
M01114825-S1
10/28/2024
Permit issued — General Construction
M01114825-I1-GC
10/16/2024
Filed — Alteration
Mechanical Work in conjunction with renovation of cellar and 1st floor of an existing building. Replace 5 HP Air-Handler Unit Replaced In-Kind, connected to an Existing Chiller. No Modification of AC Piping or Ductwork.
M01114825-I1
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
09/23/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
09/23/2024
Special inspection requirement — Final
ERIC BERLENT
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, open)
I
03/15/2023
Violation issued (HPD, open)
A
01/10/2023
Signed off — Alteration
INTERIOR RENOVATIONS TO EXISTING RETAIL SPACE ON THE FIRST FLOOR AND CELLAR. INCLUDES MINOR DEMOLITION, GENERAL CONSTRUCTION AND NO CHANGE IN EGRESS, USE OR OCCUPANCY PER DRAWINGS FILED HEREIN.
M00771628-I1
12/15/2022
Signed off — Alteration
PLUMBING MODIFICATIONS RELATED TO BUILD OUT OF RETAIL SPACE IN CELLAR FLOOR ONLY
M00781237-I1
12/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2022
Violation issued (HPD, open)
I
10/18/2022
Permit issued — General Construction
M00771628-I1-GC
09/28/2022
Permit issued — Plumbing
M00781237-I1-PL
09/23/2022
Cycle 9 facade report signed — SWARMP
09/14/2022
Objection raised — Scope
09/14/2022
Objection resolved — Addressed
09/14/2022
Objection raised — Scope
09/14/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Fire_Protection
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Fire_Protection
09/07/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Scope
09/06/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Fire_Protection
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Scope
08/23/2022
Objection resolved — Addressed
08/23/2022
Objection raised — Energy
08/23/2022
Objection resolved — Addressed
08/08/2022
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING RETAIL SPACE ON THE FIRST FLOOR AND CELLAR. INCLUDES MINOR DEMOLITION, GENERAL CONSTRUCTION AND NO CHANGE IN EGRESS, USE OR OCCUPANCY PER DRAWINGS FILED HEREIN.
M00771628-I1
08/08/2022
Filed — Alteration
PLUMBING MODIFICATIONS RELATED TO BUILD OUT OF RETAIL SPACE IN CELLAR FLOOR ONLY
M00781237-I1
07/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSAJO INC01/14/2025
DOB NOWGeneral ConstructionSigned-offSAJO INC01/14/2025
DOB NOWGeneral ConstructionSigned-offSAJO INC10/28/2024
DOB NOWGeneral ConstructionSigned-offBUILDOPS INC10/18/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP09/28/2022
BISSPISSUEDALLSTATE SPRINKLER LLC03/04/2019
BISOTISSUEDREAL DEPENDABL CONTR CORP06/08/2017
BISOTISSUEDREAL DEPENDABL CONTR CORP03/06/2017
BISEQISSUEDHKS CONSTRUCTION CORP02/17/2017
BISEQISSUEDHKS CONSTRUCTION CORP02/15/2017
BISPLISSUEDF.S. SITE CORP02/06/2015
BISSPISSUEDALLSTATE SPRINKLER LLC01/15/2015
BISMHISSUEDTMG CONSTRUCTION CORP12/23/2014
BISOTISSUEDTMG CONSTRUCTION CORP12/23/2014
BISOTISSUEDTMG CONSTRUCTION CORP12/23/2014
BISOTISSUEDTMG CONSTRUCTION CORP12/23/2014
BISSPISSUEDALLSTATE SPRINKLER LLC11/26/2014
BISOTISSUEDTMG CONSTRUCTION CORP11/24/2014
BISMHISSUEDTMG CONSTRUCTION CORP11/24/2014
BISOTISSUEDTMG CONSTRUCTION CORP10/31/2014
BISOTISSUEDTMG CONSTRUCTION CORP10/31/2014
BISPLISSUEDPAR PLUMBING CO., INC10/31/2014
BISMHISSUEDSHAWMUT WOODWORKING & SUPPLY10/30/2014
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY10/30/2014
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY10/30/2014
BISOTISSUEDSHAWMUT WOODWORKING & SUPPLY09/03/2014
BISSPISSUEDPINNACLE PLBG & HTG CORP07/17/2007
BISPLISSUEDPINNACLE PLBG & HTG CORP07/17/2007
BISMHISSUEDFULTON LANDING INC06/14/2007
BISSPISSUEDALJER PLBG & HTG. CORP02/05/2007
BISEQISSUEDD HALLER INC.07/07/2006
BIS—ISSUEDD HALLER INC.07/07/2006
BISPLISSUEDALJER PLBG & HTG CORP04/12/2006
BISEQISSUEDD HALLER INC.01/17/2006
BIS—ISSUEDD HALLER INC.01/17/2006
BISPLISSUEDALJER PLBG & HTG CORP12/06/2005
BISPLISSUEDALJER PLBG & HTG CORP11/29/2005
BISPLISSUEDZ.W. PLBG & HTG CORP10/31/2005
BISEQISSUEDD HALLER INC.07/20/2005
BIS—ISSUEDD HALLER INC.07/20/2005
+ 15 more permits on file
2 projects · most recent 09/15/2025
General Wiring
FiledStatusContractorScope
09/15/2025CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
10/16/2024CompleteALL CITY ELECTL CONTS INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/22/2025Fire-Resistance Rated ConstructionERIC BERLENTprogress
01/22/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/22/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
01/22/2025FinalERIC BERLENTprogress
10/11/2024Tenant Protection Plan ComplianceERIC BERLENTspecial
09/23/2024Mechanical SystemsERIC BERLENTspecial
09/23/2024FinalERIC BERLENTprogress
07/18/2022Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
07/18/2022FinalJONAR MADRIAGAprogress
07/18/2022Fire-Resistance Rated ConstructionJONAR MADRIAGAprogress
07/18/2022Interior lighting powerJONAR MADRIAGAenergy_progress
07/18/2022MeteringJONAR MADRIAGAenergy_progress
07/18/2022Permanent certificateJONAR MADRIAGAenergy_progress
07/18/2022Maintenance informationJONAR MADRIAGAenergy_progress
01/29/2019FinalJose Penaprogress
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/26/2026M01114825-I1Request digital key ↗
08/26/2026M01114825-P1Request digital key ↗
08/26/2026M01114825-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00124508-I1Request digital key ↗
▸Applications & Permits42
▸BISWORK PERMIT APPLICATION21
03/05/2019122098666Open ↗
06/30/2017122717051Open ↗
03/09/2017122717051Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
11/15/2016122717051Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026M00771628-I1Open ↗
08/13/2026M01114825-I1Open ↗
08/13/2026M01114825-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications59
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
11/08/2017122098675Open ↗
11/08/2017122098675Open ↗
10/30/2017122098666Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/30/2026M01114825-I1Open ↗
09/01/2026M00124508-I1Open ↗
08/31/2026M01114825-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
11/15/2016122717051Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00781237-I1Open ↗
08/26/2026M01114825-I1Open ↗
08/26/2026M01114825-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/30/2026M01114825-I1Open ↗
09/30/2026M01114825-I1Open ↗
08/31/2026M01114825-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/15/2016122717051Open ↗
11/28/2014122205210Open ↗
11/03/2014122180727Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/09/2015122205210Open ↗
03/25/2015122205210Open ↗
03/16/2015122205210Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
02/23/2015122098675Open ↗
02/05/2015122098675Open ↗
12/10/2014122098675Open ↗
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
02/14/2017140606075Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/15/2016122717051Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
11/15/2016122717051Open ↗
11/28/2014122205210Open ↗
11/03/2014122180727Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026M01114825-I1Open ↗
08/26/2026M01114825-P1Open ↗
08/26/2026M01114825-S1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/15/2016122717051Open ↗
11/28/2014122205210Open ↗
09/08/2014122098675Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/08/2017122098675Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00771628-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLANDMARKS APPROVAL7
11/08/2017122098675Open ↗
04/28/2017122180727Open ↗
02/15/2017140606949Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/28/2019122098666Open ↗
11/08/2017122098675Open ↗
04/28/2017122180727Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/17/2014122098675Open ↗
10/13/2014122098666Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT13
03/28/2019122098666Open ↗
11/08/2017122098675Open ↗
04/28/2017122180727Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET11
11/15/2016122717051Open ↗
11/28/2014122205210Open ↗
11/28/2014122205210Open ↗
Showing 3 of 11 on file for this type
▸BISADDITIONAL INFORMATION5
10/19/2017122098675Open ↗
02/14/2017140606075Open ↗
08/04/2015122205210Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/15/2017140606949Open ↗
02/14/2017140606075Open ↗
▸BISBOROUGH INTAKE FORM2
03/28/2019122098666Open ↗
11/08/2017122098675Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01114825-P1Open ↗
08/13/2026M01114825-I1Open ↗