← Back
Elevator apt, semi-fireproof without stores
115 OCEAN AVENUE
BROOKLYN · BIN 3114592
💬 Discuss this project
1925Year Built
6Stories
D1Building Class
R7-1Zoning
107,027 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized58 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SHARON EQUITIES LLC · 21,502 sf lot · 4.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneralOther
Floor 612p · 2 filings · 20 docs
Floor 511p · 2 filings · 9 docs
Floor 47p · 1 filing · 6 docs
Floor 37p · 1 filing · 6 docs
Floor 210p · 2 filings · 16 docs
Floor 18p · 2 filings · 16 docs
Cellar13p · 2 filings · 9 docs
6 jobs · most recent 10/28/2024
General Wiring
FiledStatusContractorScope
10/28/2024Permit IssuedRICHARD NEU—
11/11/2022CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
04/15/2021CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
01/31/2018CompleteOM ELECTRIC, INCGeneral Wiring
01/12/2018CompleteOM ELECTRIC, INCGeneral Wiring
01/11/2018CompleteOM ELECTRIC, INCGeneral Wiring
1 job · most recent 01/08/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/08/2026Signed-offRICHIE ROMA HOME IMPROVEMTenant Protection Plan 72 Hour
Building Lifecycle
All (120)Filed (8)Permit Issued (6)Signed Off (4)Facade (FISP) (3)Violation (60)Inspection (4)Objection (24)Special Inspection (11)
06/24/2026
Signed off — Alteration
INTERIOR RENOVATION AT APARTMENTS A10 AND B10 ON THE 1ST AND 2ND FLOORS TO RESOLVE VIOLATION, AS PER PLANS FILED HEREWITH
B01336718-I1
06/15/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
A
06/08/2026
Violation issued (HPD, open)
B
03/05/2026
Permit issued — General Construction
B01336718-I1-GC
01/23/2026
Objection raised — Cost
01/23/2026
Objection resolved — Addressed
01/08/2026
Filed — Alteration
INTERIOR RENOVATION AT APARTMENTS A10 AND B10 ON THE 1ST AND 2ND FLOORS TO RESOLVE VIOLATION, AS PER PLANS FILED HEREWITH
B01336718-I1
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOFIA KAPELYAN
01/06/2026
Special inspection requirement — Insulation placement and R values
SOFIA KAPELYAN
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SOFIA KAPELYAN
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOFIA KAPELYAN
01/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SOFIA KAPELYAN
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SOFIA KAPELYAN
12/18/2025
Special inspection requirement — Final
SOFIA KAPELYAN
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
C
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, closed)
B
12/12/2025
Violation issued (HPD, open)
A
12/12/2025
Violation issued (HPD, closed)
B
11/26/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
B
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
A
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
C
11/21/2025
Violation issued (HPD, closed)
A
Latest 60 of 120 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JONAS EQUITIES1107/08/2026
JASCO607/08/2026
JONAS EQUITIES MANAGEMENT INC903/22/2026
SHARON EQUITIES5203/22/2026
LINCOLN PROSPROL ASSOCIAT103/22/2026
LINCOLN PROSPECT ASSOCIAT603/22/2026
LINCOLN PROSPECT ASSOCAIT103/22/2026
EMPIRE SCAFFOLD SYSTEMS203/22/2026
EMPIRE SCAFFOLDING SYSTEM103/22/2026
SHARON EQUATIES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2014$25.5M—— → —$238/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RISE ARCHITECTURE601/08/2026
ASR ENGINEERING PC110/25/2024
ROGER BROOME, ARCHITECT P.C.103/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA ASSOCIATES1003/21/2026
JACK JAFFA & ASSOCIATES103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor407/08/2026
RICHIE ROMA HOME IMPROVEMGeneral Contractor406/27/2026
B&B MECH PLBG & HTG LLCPlumbing307/08/2026
JEFF AKERMANElectrical103/21/2026
MILAZZO DESIGN AND EXPElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SIA INSPECTIONS LLC7306601/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRICHIE ROMA HOME IMPROVEM03/05/2026
DOB NOWSidewalk ShedSigned-offJASCO, INC10/28/2024
DOB NOWSidewalk ShedSigned-offJASCO, INC10/28/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC11/18/2022
DOB NOWGeneral ConstructionPermit IssuedRICHIE ROMA HOME IMPROVEM10/25/2022
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC03/18/2021
BIS—ISSUEDRICHIE ROMA HOME IMPROVEM04/28/2021
BIS—ISSUEDRICHIE ROMA HOME IMPROVEM02/16/2021
BISPLISSUEDB&B MECH PLBG & HTG LLC07/20/2018
BISMHISSUEDRICHIE ROMA HOME IMPROVEM07/09/2018
BIS—ISSUEDRICHIE ROMA HOME IMPROVEM05/24/2018
BISOTISSUEDRICHIE ROMA HOME IMPROVEM05/24/2018
BISOTISSUEDRICHIE ROMA HOME IMPROVEM05/24/2018
BISPLISSUEDB&B MECH PLBG & HTG LLC03/29/2018
BISPLISSUEDB&B MECH PLBG & HTG LLC01/08/2018
BISMHISSUEDSUCCESS CONTACT INC12/29/2017
BIS—ISSUEDRICHIE ROMA HOME IMPROVEM12/20/2017
BISOTISSUEDY&L NY INTERIORS INC12/15/2017
BISPLISSUEDB&B MECH PLBG & HTG LLC11/14/2017
BISOTISSUEDRICHIE ROMA HOME IMPROVEM06/15/2017
BISOTISSUEDRICHIE ROMA HOME IMPROVEM06/15/2017
BISPLISSUEDB&B MECH PLBG & HTG LLC06/15/2017
BISOTISSUEDMCFAR CONSTRUCTION LTD06/14/2017
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM05/23/2017
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM05/09/2017
BISMHISSUEDRICHIE ROMA HOME IMPROVEM03/06/2017
BISMHISSUEDRICHIE ROMA HOME IMPROVEM03/06/2017
BISPLISSUEDB&B MECH PLBG & HTG LLC03/01/2017
BISPLISSUEDB&B MECH PLBG & HTG LLC03/01/2017
BISOTISSUEDRICHIE ROMA HOME IMPROVEM02/28/2017
BISOTISSUEDRICHIE ROMA HOME IMPROVEM02/28/2017
BISPLISSUEDB&B MECH PLBG & HTG LLC12/22/2016
BISOTISSUEDRICHIE ROMA HOME IMPROVEM09/09/2016
BISOTISSUEDRICHIE ROMA HOME IMPROVEM06/28/2016
BISOTISSUEDMCFAR CONSTRUCTION LTD06/28/2016
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM04/28/2016
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM04/27/2016
BISPLISSUEDB&B MECH PLBG & HTG LLC04/15/2016
BISOTISSUEDRICHIE ROMA HOME IMPROVEM02/05/2016
BISOTISSUEDMCFAR CONSTRUCTION LTD11/20/2015
+ 8 more permits on file
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/23/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
01/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/06/2026Fire-Resistant Penetrations and JointsSOFIA KAPELYANspecial
01/06/2026Insulation placement and R valuesSOFIA KAPELYANenergy_progress
01/06/2026Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
01/06/2026Fire-Resistance Rated ConstructionSOFIA KAPELYANprogress
01/06/2026Tenant Protection Plan ComplianceSOFIA KAPELYANspecial
01/06/2026Energy Code Compliance InspectionsSOFIA KAPELYANprogress
12/18/2025FinalSOFIA KAPELYANprogress
05/04/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
05/04/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
03/23/2021Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
03/23/2021Energy Code Compliance InspectionsJEFF AKERMANprogress
▾Documents — 428 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/28/2026B00795348-I1Contact architect ↗
08/23/2026B01132505-I1Contact architect ↗
08/19/2026B01336718-I1Contact architect ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/01/2026B00443768-P2Contact architect ↗
09/01/2026B00443768-P1Contact architect ↗
08/15/2026B00443768-I1Contact architect ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/02/2026B00145878-I1Contact architect ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION43
05/10/2021321598133Open ↗
02/23/2021321598133Open ↗
02/23/2021321598133Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION35
02/16/2021321598133Open ↗
01/28/2019321614801Open ↗
07/20/2018340613973Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
05/28/2019321614801Open ↗
09/28/2018321614801Open ↗
07/23/2018321614801Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
08/17/2021321598133Open ↗
07/24/2018321614801Open ↗
06/01/2018321614801Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
02/16/2021321598133Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
04/30/2019340475417Open ↗
01/28/2019321614801Open ↗
01/28/2019321614801Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
06/27/2018340613973Open ↗
Showing 1 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
06/27/2018340613973Open ↗
Showing 1 of 11 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION11
06/27/2018340613973Open ↗
Showing 1 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026B00145878-I1Open ↗
09/01/2026B00443768-P1Open ↗
09/01/2026B00443768-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/10/2026B00443768-P2Open ↗
08/30/2026B01336718-I1Open ↗
08/30/2026B01336718-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/10/2026B00443768-P2Open ↗
08/30/2026B01336718-I1Open ↗
08/30/2026B01336718-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING14
12/28/2018340475417Open ↗
11/13/2018340613973Open ↗
11/09/2018340475417Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
10/23/2018321614801Open ↗
10/10/2018321614801Open ↗
02/27/2018340475417Open ↗
Showing 3 of 8 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/28/2021321598133Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTENANT PROTECTION PLAN AND NOTES8
06/27/2018340613973Open ↗
10/05/2020321598133Open ↗
Showing 2 of 8 on file for this type
▸BISSTREET TREE CHECKLIST3
11/23/2020321598133Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
09/01/2026B00443768-P2Open ↗
09/01/2026B00443768-P1Open ↗
08/15/2026B00443768-I1Open ↗
▸BISSTREET TREE SIGNOFF1
01/11/2022321598133Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00746518-I1Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
10/05/2020321598133Open ↗
06/27/2018340613973Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00443768-P1Open ↗
09/01/2026B00443768-P2Open ↗
08/28/2026B00795348-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
04/30/2019340475417Open ↗
01/09/2019340613973Open ↗
01/03/2019340475578Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
10/28/2021321598133Open ↗
01/09/2019340613973Open ↗
01/03/2019340475578Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
10/28/2021321598133Open ↗
02/16/2021321598133Open ↗
11/23/2020321598133Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS8
06/27/2018340613973Open ↗
Showing 1 of 8 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00746518-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY16
10/28/2021321598133Open ↗
10/28/2021321598133Open ↗
02/16/2021321598133Open ↗
Showing 3 of 16 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
03/17/2020321614801Open ↗
01/06/2020321614801Open ↗
10/23/2019340375819Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
12/15/2020321598133Open ↗
12/15/2020321598133Open ↗
11/23/2020321598133Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/10/2021321598133Open ↗
01/04/2021321598133Open ↗
Showing 2 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
10/28/2021321598133Open ↗
11/23/2020321598133Open ↗
04/30/2019340475417Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms66
▸BISBOROUGH INTAKE FORM32
03/17/2020321614801Open ↗
01/06/2020321614801Open ↗
10/23/2019340375819Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION20
06/14/2021321598133Open ↗
02/12/2021321598133Open ↗
09/04/2019321614801Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
06/27/2018340613973Open ↗
Showing 1 of 11 on file for this type
▸BISEFILING COVER SHEET3
09/17/2020321598133Open ↗
Showing 1 of 3 on file for this type
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026B00746518-I1Open ↗