← Back
Walk-up apt, over six families with stores
115 WEST WASHINGTON PLCE
MANHATTAN · BIN 1084951
💬 Discuss this project
1912Year Built
6Stories
C7Building Class
R6Zoning
28,562 sfGross Floor Area
52Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 115-119 WASHINGTON PLACE LLC · 7,275 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
Architecture
Roof11p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
115-119 WASHINGTON PLACE LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC306/12/2023
EDG104/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES103/21/2026
E-Z PERMIT NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor807/08/2026
M GROUP MANAGEMENT CORPGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578104/26/2023
GZ & NC CODE CONSULTING P7492104/26/2023
Building Lifecycle
All (26)Filed (5)Permit Issued (7)Signed Off (3)Violation (3)Objection (2)Special Inspection (6)
04/16/2025
Signed off — Alteration
FACADE RESTORATION, INSPECTIONS
M01040205-I1
11/13/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00868569-I1
11/13/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00868605-I1
06/11/2024
Permit issued — General Construction
M00859341-I1-GC
04/30/2024
Permit issued — Sidewalk Shed
M00868605-I1-SH
04/30/2024
Permit issued — Suspended Scaffold
M01040205-I1-SC
04/29/2024
Permit issued — Supported Scaffold
M00868569-I1-SF
04/23/2024
Filed — Alteration
FACADE RESTORATION, INSPECTIONS
M01040205-I1
06/15/2023
Permit issued — General Construction
M00859341-I1-GC
06/12/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00868569-P1
05/04/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00868569-I1
05/04/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00868605-I1
05/04/2023
Permit issued — Supported Scaffold
M00868569-I1-SF
05/04/2023
Permit issued — Sidewalk Shed
M00868605-I1-SH
05/01/2023
Objection raised — Other
05/01/2023
Objection resolved — Addressed
04/26/2023
Filed — Alteration
PROPOSED FACADE REPAIRS AND ROOF REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00859341-I1
04/13/2023
Special inspection requirement — Masonry
Anthony Stasio
04/13/2023
Special inspection requirement — Post-installed Anchors
Anthony Stasio
04/13/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
04/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Nazzareno Callipo
04/13/2023
Special inspection requirement — Final
Anthony Stasio
04/13/2023
Special inspection requirement — Insulation placement and R values
Anthony Stasio
12/20/2017
Violation issued (HPD, closed)
I
12/20/2017
Violation issued (HPD, closed)
C
11/24/2017
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM GROUP MANAGEMENT CORP06/11/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC04/30/2024
DOB NOWSuspended ScaffoldSigned-offM GROUP MANAGEMENT CORP04/30/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC04/29/2024
DOB NOWGeneral ConstructionPermit IssuedM GROUP MANAGEMENT CORP06/15/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/04/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/04/2023
2 projects · most recent 05/05/2023
General Wiring
FiledStatusContractorScope
05/05/2023CompleteBOROWIDE ELECT'L CONTR'S—
02/13/2018Permit IssuedA WILCO ELECTRIC LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/13/2023MasonryAnthony Stasiospecial
04/13/2023Post-installed AnchorsAnthony Stasiospecial
04/13/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/13/2023Tenant Protection Plan ComplianceNazzareno Callipospecial
04/13/2023FinalAnthony Stasioprogress
04/13/2023Insulation placement and R valuesAnthony Stasioenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026M00868605-I1Request digital key ↗
08/30/2026M00868569-I1Request digital key ↗
08/30/2026M00868569-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026M00859341-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature4
08/24/2026M00859341-I1Open ↗
08/24/2026M00859341-I1Open ↗
08/24/2026M00859341-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026M00868605-I1Open ↗
08/30/2026M00868569-I1Open ↗
08/30/2026M00868569-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00859341-I1Open ↗
08/24/2026M00859341-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00859341-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026M01040205-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01040205-I1Open ↗