← Back
One family attached or semi-detached
115 WINDSOR PLACE
BROOKLYN · BIN 3026925
💬 Discuss this project
1905Year Built
2Stories
A5Building Class
R5BZoning
2,048 sfGross Floor Area
1Units
One family attached or semi-detached · 2,000 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 1 filing · 17 docs
Floor 213p · 1 filing · 17 docs
Floor 118p · 3 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GS JAMES LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2021$2.0M—— → —$974/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAB ENGINEERING PC504/15/2022
CELIN MUNOZ CONSULTING ENGINEER, PC202/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EAB ENGINEERING PC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHATZI CONSTRUCTION INCGeneral Contractor1107/08/2026
APOLLO PLBG & HTG INCPlumbing707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EAB ENGINEERING, PC2048303/11/2022
CELIN MUNOZ CONSULTING EN1064202/16/2022
Building Lifecycle
All (55)Filed (7)Permit Issued (7)Inspection (5)Objection (6)Special Inspection (30)
07/20/2022
Permit issued — General Construction
B00505413-I1-GC
05/23/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
Iraj Issapour
05/05/2022
Special inspection requirement — Maintenance information
Iraj Issapour
05/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
05/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
Iraj Issapour
05/03/2022
Objection resolved — Addressed
05/03/2022
Objection resolved — Addressed
05/03/2022
Objection resolved — Addressed
04/20/2022
Objection raised — Scope
04/20/2022
Objection raised — Scope
04/20/2022
Objection raised — Mechanical
04/15/2022
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES AND GAS METERS IN EXISTING TWO FAMILY DWELLING. INSTALL NEW PLUMBING FIXTURES AND ELECTRIC COOKING RANGE AND WATER HEATER IN CONJUNCTION WITH APPLICATION #B00505413
B00501689-P1
04/07/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/31/2022
Permit issued — Plumbing
B00501689-I1-PL
03/30/2022
Permit issued — General Construction
B00505413-I1-MS
03/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Iraj Issapour
03/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Iraj Issapour
03/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Iraj Issapour
03/15/2022
Special inspection requirement — Fenestration areas
Iraj Issapour
03/15/2022
Special inspection requirement — Maintenance information
Iraj Issapour
03/15/2022
Special inspection requirement — Exterior lighting power
Iraj Issapour
03/15/2022
Special inspection requirement — Metering
Iraj Issapour
03/15/2022
Special inspection requirement — Insulation placement and R values
Iraj Issapour
03/15/2022
Special inspection requirement — Fenestration air leakage
Iraj Issapour
03/15/2022
Special inspection requirement — Lighting controls
Iraj Issapour
03/15/2022
Special inspection requirement — Mechanical Systems
Iraj Issapour
03/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Iraj Issapour
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
03/15/2022
Special inspection requirement — Final
Iraj Issapour
03/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
03/11/2022
Filed — Alteration CO
INTERIOR RENOVATION, REMOVE / INSTALL PARTITIONS AND CREATE OPENING AT THE REAR WALL AT 1ST FL. INSTALL NON-COMBUASTIBLE OPEN DECK AT REAR ON 1ST FL TO ACCESSS REAR YARD. CONVERT FROM TWO FAMILY TO ONE FAMILY DWELLING AND OBTAIN NEW CERTIFICATE OF OCCUPAN
B00505413-P2
03/11/2022
Special inspection requirement — Insulation placement and R values
Iraj Issapour
03/11/2022
Special inspection requirement — Exterior lighting power
Iraj Issapour
03/11/2022
Special inspection requirement — Metering
Iraj Issapour
03/11/2022
Special inspection requirement — Fenestration areas
Iraj Issapour
03/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
03/11/2022
Special inspection requirement — Fenestration air leakage
Iraj Issapour
03/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Iraj Issapour
03/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Iraj Issapour
03/11/2022
Special inspection requirement — Maintenance information
Iraj Issapour
03/11/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Iraj Issapour
03/11/2022
Special inspection requirement — Lighting controls
Iraj Issapour
02/16/2022
Filed — Alteration
B00522623-P1
01/24/2022
Permit issued — Plumbing
B00501689-I1-PL
09/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2021
Permit issued — Plumbing
B00501689-I1-PL
08/17/2021
Permit issued — Structural
B00522623-I1-ST
07/22/2021
Permit issued — General Construction
B00505413-I1-GC
07/10/2021
Filed — Alteration CO
INTERIOR RENOVATION, REMOVE / INSTALL PARTITIONS AND CREATE OPENING AT THE REAR WALL AT 1ST FL. INSTALL NON-COMBUASTIBLE OPEN DECK AT REAR ON 1ST FL TO ACCESSS REAR YARD. CONVERT FROM TWO FAMILY TO ONE FAMILY DWELLING AND OBTAIN NEW CERTIFICATE OF OCCUPAN
B00505413-P1
06/01/2021
Filed — Alteration
B00522623-I1
05/17/2021
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES AND GAS METERS IN EXISTING TWO FAMILY DWELLING. INSTALL NEW PLUMBING FIXTURES AND ELECTRIC COOKING RANGE AND WATER HEATER IN CONJUNCTION WITH APPLICATION #B00505413
B00501689-I1
05/17/2021
Filed — Alteration CO
INTERIOR RENOVATION, REMOVE / INSTALL PARTITIONS AND CREATE OPENING AT THE REAR WALL AT 1ST FL. INSTALL NON-COMBUASTIBLE OPEN DECK AT REAR ON 1ST FL TO ACCESSS REAR YARD. CONVERT FROM TWO FAMILY TO ONE FAMILY DWELLING AND OBTAIN NEW CERTIFICATE OF OCCUPAN
B00505413-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCHATZI CONSTRUCTION INC07/20/2022
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC03/31/2022
DOB NOWGeneral ConstructionPermit IssuedCHATZI CONSTRUCTION INC03/30/2022
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC01/24/2022
DOB NOWPlumbingSigned-offAPOLLO PLBG & HTG INC08/31/2021
DOB NOWStructuralPermit IssuedCHATZI CONSTRUCTION INC08/17/2021
DOB NOWGeneral ConstructionPermit IssuedCHATZI CONSTRUCTION INC07/22/2021
1 project · most recent 03/11/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2022Permit IssuedCHATZI CONSTRUCTION INCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-8C60NA2; MXZ-8C48NAHZ 108,000 BTU · Rooftop Unit ×4
Heating
Mitsubishi Electric MXZ-8C60NA2; MXZ-8C48NAHZ 120,000 BTU · Rooftop Unit ×4
1 project · most recent 04/15/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/15/2022Signed-offAPOLLO PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 06/15/2022
General Wiring
FiledStatusContractorScope
06/15/2022CompleteDEMAND ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2022Fail-Final CND-Occupancy InspectionFailView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
05/05/2022Maintenance informationIraj Issapourenergy_progress
05/05/2022HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
05/05/2022HVAC-R and service water heating system controlsIraj Issapourenergy_progress
05/05/2022HVAC-R and service water heating equipmentIraj Issapourenergy_progress
03/15/2022Fenestration air leakageIraj Issapourenergy_progress
03/15/2022HVAC-R and service water heating equipmentIraj Issapourenergy_progress
03/15/2022Insulation placement and R valuesIraj Issapourenergy_progress
03/15/2022MeteringIraj Issapourenergy_progress
03/15/2022HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
03/15/2022Maintenance informationIraj Issapourenergy_progress
03/15/2022Exterior lighting powerIraj Issapourenergy_progress
03/15/2022Fire-Resistant Penetrations and JointsIraj Issapourspecial
03/15/2022Structural Stability – Alterations of existing buildingsIraj Issapourspecial
03/15/2022Mechanical SystemsIraj Issapourspecial
03/15/2022Fenestration areasIraj Issapourenergy_progress
03/15/2022FinalIraj Issapourprogress
03/15/2022HVAC-R and service water heating system controlsIraj Issapourenergy_progress
03/15/2022Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
03/15/2022Lighting controlsIraj Issapourenergy_progress
03/11/2022Lighting controlsIraj Issapourenergy_progress
03/11/2022Mechanical SystemsIraj Issapourspecial
03/11/2022Structural Stability – Alterations of existing buildingsIraj Issapourspecial
03/11/2022FinalIraj Issapourprogress
03/11/2022Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
03/11/2022Fenestration air leakageIraj Issapourenergy_progress
Latest 25 of 65.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00501689-I1Request digital key ↗
08/31/2026B00522623-I1Request digital key ↗
08/31/2026B00522623-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
08/30/2021340815283Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/30/2021340815283Open ↗
▸Seals & Professional Certifications35
▸DOB NOWSpecial Inspector Seal & Signature17
08/29/2026B00505413-P1Open ↗
08/28/2026B00505413-P2Open ↗
08/26/2026B00522623-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026B00505413-P1Open ↗
08/29/2026B00505413-P1Open ↗
08/28/2026B00505413-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00501689-I1Open ↗
09/01/2026B00501689-P1Open ↗
08/31/2026B00522623-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/30/2021340815283Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/30/2021340815283Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/30/2021340815283Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00505413-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00501689-I1Open ↗
08/31/2026B00522623-I1Open ↗
08/13/2026B00505413-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/30/2021340815283Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/30/2021340815283Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/30/2021340815283Open ↗