← Back
Other college and university
Medgar Evers College
902 NOSTRAND AVENUE · BIN 3337869
💬 Discuss this project
1908Year Built
5Stories
W6Building Class
R6Zoning
102,428 sfGross Floor Area
1Units
LL97 Covered27 Open Violations 22 unresolved · 5 paperwork only ▸FDNY Report ↗
Other college and university · Owner of record: DORMITORY AUTHORITY OF THE STATE OF NEW YORK · 127,790 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof16p · 4 filings · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4Under Construction21p · 4 filings · 20 docs
Floor 3Under Construction13p · 3 filings · 20 docs
Floor 2Under Construction35p · 5 filings · 20 docs
Floor 1Under Construction22p · 4 filings · 20 docs
Mezzanine8p · 3 filings · 20 docs
CellarUnder Construction32p · 2 filings · 20 docs
Basement17p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY9009/30/2026
CUNY1109/13/2026
DORMITORY AUTHORITY OF THE STATE OF NEW YORK103/22/2026
RJ GREEN CONSTRUCT CORP203/22/2026
DORMITORY AUTHORITY203/22/2026
CUNY 042503/22/2026
DOE 040203/22/2026
OWNER OF 1150 CARROLL ST103/22/2026
DORMITORY AUTHORITY STATE OF NY403/21/2026
DORMITORY AUTHORITY, ST OF NY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES403/21/2026
WILLIAM VITACCO ASSOCIATES1403/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
JMV ARCHITECT2203/21/2026
JMV ASSOCIATES LLC403/21/2026
Rigid Structural Design, LLC403/21/2026
NOEL BUILDING CONSULTING INC403/21/2026
TAREK M ZEID P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS SYSTEM ASSOCIATES INC.General Contractor909/30/2026
SIERRA MECHANICAL CONTRACTINGGeneral Contractor607/08/2026
KS CONSTRUCTION OF NY INCGeneral Contractor603/21/2026
LOUIS L.BUTTERMARK & SONSPlumbing209/16/2026
UNIVERSAL CONSTRUCTION REGeneral Contractor108/05/2026
I.M.P. PLBG. & HTG. CORPPlumbing107/02/2026
PRO CON GROUP INCGeneral Contractor104/09/2026
ZENA ELECTRIC INCElectrical103/22/2026
CARLITOS CONTRACTING CORPGeneral Contractor104/09/2026
J.H. ELEC. OF NEW YORK INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891308/19/2026
SOCOTEC ENGINEERING49832307/07/2026
Building Lifecycle
All (172)Filed (48)Permit Issued (21)Violation (60)Objection (13)Special Inspection (30)
09/29/2026
Permit issued — Mechanical Systems
B08018297-S2-MS
09/15/2026
Permit issued — Plumbing
B08018297-S1-PL
09/01/2026
Permit issued — Structural
B08018297-S3-ST
08/19/2026
Filed — Alteration
PROPOSED STRUCTURAL SCOPE OF WORK OF MEDGAR EVERS COLLEGE PHASE 2- (AHU) AIR HANDLING REPLACEMENT OF EXISTING WINDOWS, WINDOWS FRAMES, REPAIR INTERIOR ELEMENTS.
B08018297-P6
08/04/2026
Permit issued — Construction Fence
B01384220-I1-FN
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
07/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
07/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
07/10/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
07/10/2026
Special inspection requirement — Final
MARISA HARTE
07/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARISA HARTE
07/10/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
07/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
07/10/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
07/10/2026
Special inspection requirement — Heating Systems
MARISA HARTE
07/10/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
07/10/2026
Special inspection requirement — Maintenance information
MARISA HARTE
07/07/2026
Filed — Alteration
B08028540-P1
07/07/2026
Filed — Alteration
B08028502-P1
07/07/2026
Filed — Alteration
B08028491-P1
07/06/2026
Permit issued — Structural
B08022290-S3-ST
07/02/2026
Permit issued — General Construction
B08022290-I1-GC
06/30/2026
Permit issued — Plumbing
B08022290-S1-PL
06/30/2026
Special inspection requirement — Final
Roberta Curtis
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
06/24/2026
Special inspection requirement — Final
Panagiotis Koklanos
06/24/2026
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
06/24/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
06/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
06/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
06/16/2026
Filed — Alteration
Installation of temporary construction fence
B01384220-I1
06/11/2026
Permit issued — Mechanical Systems
B08022290-S2-MS
06/10/2026
Filed — Alteration
PROPOSED PLUMBING WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- REPAIR OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. PROVIDE NEW SANITARY, WASTE, VENT, HOT AND COLD WATER PLUMBING FIXTURES.
B08022290-P1
06/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
06/05/2026
Special inspection requirement — Maintenance information
MARISA HARTE
06/05/2026
Special inspection requirement — Shutoff dampers
MARISA HARTE
06/05/2026
Special inspection requirement — Energy Code Compliance Inspections
MARISA HARTE
06/05/2026
Special inspection requirement — Final
NIKHIL KULKARNI
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
06/05/2026
Special inspection requirement — Mechanical Systems
MARISA HARTE
06/04/2026
Filed — Alteration
PROPOSED PLUMBING WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- REPAIR OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. PROVIDE NEW SANITARY, WASTE, VENT, HOT AND COLD WATER PLUMBING FIXTURES.
B08022290-P3
06/03/2026
Filed — Alteration
PROPOSED PLUMBING WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- REPAIR OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. PROVIDE NEW SANITARY, WASTE, VENT, HOT AND COLD WATER PLUMBING FIXTURES.
B08022290-P4
06/02/2026
Filed — Alteration
PROPOSED PLUMBING WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTION UPGRADE- REPAIR OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING. PROVIDE NEW SANITARY, WASTE, VENT, HOT AND COLD WATER PLUMBING FIXTURES.
B08022290-P2
04/23/2026
Permit issued — General Construction
B08018297-I1-GC
04/23/2026
Special inspection requirement — Structural Steel - Details
MARISA HARTE
04/23/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
03/31/2026
Permit issued — General Construction
B01291336-I1-GC-CX
03/03/2026
Filed — Alteration
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01312121-P1
03/02/2026
Filed — Alteration
General Construction work for Medgar Evers College
B08028410-P1
03/02/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION OF THE ALLEYWAY FOR CONSTRUCTION OF NEW LIFT ENCLOSURE AND STAIRCASE FOOTINGS
B07999072-P2
02/27/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION OF THE ALLEYWAY FOR CONSTRUCTION OF NEW LIFT ENCLOSURE AND STAIRCASE FOOTINGS
B07999072-P3
02/27/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION OF THE ALLEYWAY FOR CONSTRUCTION OF NEW LIFT ENCLOSURE AND STAIRCASE FOOTINGS
B07999072-P4
02/26/2026
Filed — Alteration CO
SUPPORT OF EXCAVATION OF THE ALLEYWAY FOR CONSTRUCTION OF NEW LIFT ENCLOSURE AND STAIRCASE FOOTINGS
B07999072-P5
01/26/2026
Permit issued — Sidewalk Shed
B01312121-I1-SH
01/23/2026
Filed — Alteration
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01312121-I1
01/23/2026
Objection raised — Admin
01/20/2026
Filed — Alteration
B01305567-I1
01/20/2026
Filed — Alteration
INSTALLATION OF STRUCTURAL WORK FOR EMERGENCY GENERATOR. SEE PLANS FOR DETAIL. NO CHANGE OF USE, EGRESS OR OCCUAPNCY UNDER THIS APPLICATION
B01305560-I1
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.09/29/2026
DOB NOWPlumbingPermit IssuedLOUIS L.BUTTERMARK & SONS09/15/2026
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.09/01/2026
DOB NOWConstruction FencePermit IssuedUNIVERSAL CONSTRUCTION RE08/04/2026
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.07/06/2026
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.07/02/2026
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP06/30/2026
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.06/11/2026
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.04/23/2026
DOB NOWGeneral ConstructionSigned-offPRO CON GROUP INC03/31/2026
DOB NOWSidewalk ShedPermit IssuedCARLITOS CONTRACTING CORP01/26/2026
DOB NOWPlumbingPermit IssuedLOUIS L.BUTTERMARK & SONS10/01/2025
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.10/01/2025
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.09/30/2025
DOB NOWGeneral ConstructionPermit IssuedACS SYSTEM ASSOCIATES INC.08/25/2025
DOB NOWStructuralPermit IssuedSIERRA MECHANICAL CONTRAC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedSIERRA MECHANICAL CONTRAC07/31/2023
DOB NOWGeneral ConstructionPermit IssuedSIERRA MECHANICAL CONTRAC08/11/2022
DOB NOWStructuralPermit IssuedSIERRA MECHANICAL CONTRAC08/10/2022
DOB NOWConstruction FencePermit IssuedKS CONSTRUCTION OF NY INC04/20/2022
DOB NOWSidewalk ShedPermit IssuedKS CONSTRUCTION OF NY INC03/28/2022
BISOTISSUEDKS CONSTRUCTION OF NY INC04/20/2022
BISOTISSUEDR J GREEN CONSTRUCTI CORP03/12/2020
BISOTISSUEDR J GREEN CONSTRUCTI CORP01/30/2020
BISOTISSUEDSIERRA MECHANICAL CONTRACTING01/08/2020
BISBLISSUEDBOYD MECHANICAL LLC04/09/2019
BISPLISSUEDBOYD MECHANICAL LLC04/09/2019
BISOTISSUEDSIERRA MECHANICAL CONTRACTING04/03/2019
BISMHISSUEDGEOMATRIX SERVICES INC02/15/2019
BISPLISSUEDVARSITY PLBG AND HTG INC04/05/2017
BISOTISSUEDJ & N CONSTRUCTION GROUP02/03/2017
BISEQISSUEDPJP INSTALLERS INC12/28/2016
BISEQISSUEDPJP INSTALLERS INC12/28/2016
BIS—ISSUEDCAD SIGNS NYC CORP12/13/2016
BISEQISSUEDJ & N CONSTRUCTION GROUP12/09/2016
BISEQISSUEDJ & N CONSTRUCTION GROUP12/09/2016
BISEQISSUEDJ & N CONSTRUCTION GROUP12/09/2016
BISPLISSUEDVARSITY PLBG AND HTG INC02/12/2016
BISPLISSUEDVARSITY PLBG AND HTG INC01/21/2015
BISMHISSUEDUSA ROOFING COMPANY CORP05/02/2014
+ 31 more permits on file
3 projects · most recent 08/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedACS SYSTEM ASSOCIATES INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin CAH033GDGM 14,500 CFM · Fan Coil Indoor ×2
REYQ408XATJA 408 BTU · Vrf Outdoor ×2
RXYQ408XATJA 408 BTU · Vrf Outdoor ×2
Ventilation
Greenheck GB-330-15 7,250 CFM · Exhaust Fan ×4
06/10/2026Permit IssuedACS SYSTEM ASSOCIATES INCVentilation Systems
Ventilation
Greenheck USF-06 200 CFM · Exhaust Fan ×5
USF-07 500 CFM · Exhaust Fan ×5
Price SDS RETURN 200 CFM · Exhaust Fan ×10
07/22/2022Permit IssuedSIERRA MECHANICAL CONTRACHeating and Air Conditioning Systems—
2 projects · most recent 08/19/2026
Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedLOUIS L.BUTTERMARK & SONSWater/Sanitary
06/10/2026Permit IssuedI.M.P. PLUMBING & HEATING CORP.Water/Sanitary
11 projects · most recent 04/21/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/21/2026Permit IssuedELDOR ELECTRIC LLCGeneral Wiring
04/20/2026Permit IssuedELDOR ELECTRIC LLC3 meters, 2 new_meters
04/20/2026Permit IssuedELDOR ELECTRIC LLC1 meters, 1 new_meters
02/25/2026Permit IssuedSPICE ELECTRIC COMPANY—
08/14/2025Permit IssuedJ.H. ELEC. OF NEW YORK INHVAC Wiring
02/16/2023CompleteHIGH VOLT ELEC CORP. OFGeneral Wiring
06/13/2022CompleteGOTTLIEB ELECTRIC, LLCGeneral Wiring
03/16/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
01/26/2021Permit IssuedG-SQUARED ELECTRIC, LLCGeneral Wiring
11/15/2019Permit IssuedREDD ELECTRICAL SVCS INCGeneral Wiring
02/26/2018Permit IssuedZENA ELECTRIC INC—
5 projects · most recent 08/19/2026
Steel Concrete
FiledStatusContractorScope
08/19/2026Permit IssuedACS SYSTEM ASSOCIATES INCSteel, Concrete
06/10/2026Permit IssuedACS SYSTEM ASSOCIATES INCSteel, Concrete
03/02/2026——4 scope_items
01/20/2026——Concrete
07/22/2022Permit IssuedSIERRA MECHANICAL CONTRACSteel
3 projects · most recent 06/16/2026
Fence Sidewalk Shed
FiledStatusContractorScope
06/16/2026Permit IssuedUNIVERSAL CONSTRUCTION REFence
03/03/2026Permit IssuedCARLITOS CONTRACTING CORPSidewalk Shed
04/20/2022Permit IssuedKS CONSTRUCTION OF NY INCFence
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/10/2026Mechanical SystemsMARISA HARTEspecial
07/10/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
07/10/2026Post-installed AnchorsMARISA HARTEspecial
07/10/2026Sprinkler SystemsMARISA HARTEspecial
07/10/2026Duct leakage testing, insulation and designMARISA HARTEenergy_progress
07/10/2026HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
07/10/2026Maintenance informationMARISA HARTEenergy_progress
07/10/2026Shutoff dampersMARISA HARTEenergy_progress
07/10/2026HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
07/10/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
07/10/2026Energy Code Compliance InspectionsMARISA HARTEprogress
07/10/2026FinalMARISA HARTEprogress
07/10/2026Heating SystemsMARISA HARTEspecial
06/30/2026Fire-Resistance Rated ConstructionMARISA HARTEprogress
06/30/2026FinalRoberta Curtisprogress
06/24/2026Structural Steel - DetailsMARISA HARTEspecial
06/24/2026Structural Steel - High Strength BoltingMARISA HARTEspecial
06/24/2026FinalPanagiotis Koklanosprogress
06/24/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
06/24/2026Post-installed AnchorsMARISA HARTEspecial
06/24/2026Structural Steel - WeldingMARISA HARTEspecial
06/05/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
06/05/2026HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
06/05/2026Maintenance informationMARISA HARTEenergy_progress
06/05/2026FinalNIKHIL KULKARNIprogress
Latest 25 of 150.
▾Documents — 694 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch48
08/30/2026B00703741-I1Request digital key ↗
08/29/2026B00703772-I1Request digital key ↗
08/29/2026B00754467-P2Request digital key ↗
Showing 3 of 48 on file for this type
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION50
05/12/2025321315304Open ↗
11/14/2024340912864Open ↗
10/29/2024321315304Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION36
04/20/2022340745652Open ↗
11/09/2020321730061Open ↗
03/16/2020321739142Open ↗
Showing 3 of 36 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
10/29/2024321315304Open ↗
03/06/2020321730061Open ↗
01/30/2020321730061Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B07999072-P2Open ↗
08/13/2026B07999072-P1Open ↗
08/13/2026B07999072-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications202
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION59
11/21/2019321739142Open ↗
03/15/2019321739142Open ↗
02/20/2019321315304Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/30/2026B00703741-I1Open ↗
08/29/2026B00754467-P1Open ↗
08/29/2026B00754467-S1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
09/30/2026B08022290-P3Open ↗
09/30/2026B08022290-P3Open ↗
09/30/2026B08022290-P3Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/30/2026B08022290-P3Open ↗
09/01/2026B08028491-I1Open ↗
08/31/2026B08028540-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
04/09/2018321494851Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/09/2018321494851Open ↗
12/12/2016321457286Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
Showing 2 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/30/2018340613152Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
03/18/2020321730061Open ↗
03/30/2018321730061Open ↗
Showing 2 of 3 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/30/2018321730061Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
12/05/2018320983192Open ↗
09/24/2018320858764Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BISHEATING SYSTEMS1
01/31/2022321730061Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
04/23/2018321730061Open ↗
04/09/2018321494851Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
01/31/2022321730061Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/29/2026B00754467-S1Open ↗
08/29/2026B00754467-I1Open ↗
08/29/2026B00754467-P2Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/16/2020340745652Open ↗
04/09/2018321494851Open ↗
Showing 2 of 7 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU2037BK191
02/07/2022321739142Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/13/2019340696946Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
11/21/2019321739142Open ↗
02/20/2019321315304Open ↗
07/30/2018321315304Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
06/29/2023340745652Open ↗
04/20/2022340745652Open ↗
07/16/2020340745652Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
06/29/2023340745652Open ↗
12/19/2018320858764Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
▸BISNYCECC ANALYSIS2
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BIS* HVAC INSULATION AND SEALING2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/31/2022321730061Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY15
05/14/2025321315304Open ↗
05/12/2025321315304Open ↗
06/29/2023340745652Open ↗
Showing 3 of 15 on file for this type
▸BISMECHANICAL SYSTEMS3
11/01/2024321315304Open ↗
03/11/2022321730061Open ↗
01/31/2022321730061Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
03/11/2022321730061Open ↗
01/31/2022321730061Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/21/2019321739142Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/15/2019321739142Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/01/2020321739142Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
02/07/2022321739142Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/08/2022321739142Open ↗
▸Approvals, Objections & Sign-offs80
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter48
08/30/2026B00703741-I1Open ↗
08/20/2026B08018297-P6Open ↗
08/20/2026B01291336-I1Open ↗
Showing 3 of 48 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
05/15/2025321315304Open ↗
06/30/2023340745652Open ↗
03/08/2022321739142Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/01/2017340364135Open ↗
01/31/2017340364135Open ↗
Showing 2 of 5 on file for this type
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT32
06/29/2023340745652Open ↗
05/05/2021321739142Open ↗
07/16/2020340745652Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/01/2024321315304Open ↗
12/23/2021321739142Open ↗
04/26/2021321210319Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
02/03/2017340364135Open ↗
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET24
07/30/2018321315304Open ↗
04/09/2018321494851Open ↗
04/09/2018321739142Open ↗
Showing 3 of 24 on file for this type
▸BISADDITIONAL INFORMATION17
02/08/2022321739142Open ↗
12/28/2021321739142Open ↗
12/22/2021321739142Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
07/16/2020340745652Open ↗
09/13/2019340696946Open ↗
07/30/2018340613152Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAI1 Form6
08/20/2026B08018297-P6Open ↗
08/13/2026B08018297-S1Open ↗
08/13/2026B08018297-P5Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
02/01/2019320983192Open ↗
12/19/2018320858764Open ↗
10/18/2018320858764Open ↗
Showing 3 of 4 on file for this type
▸Other Documents25
▸DOB NOWPlot Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSite Survey: Initial5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISMAINTENANCE INFORMATION2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸BISSHUTOFF DAMPERS2
11/01/2024321315304Open ↗
01/31/2022321730061Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
08/16/2026B08022290-S3Open ↗
08/13/2026B08018297-S3Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/20/2026B01291336-I1Open ↗