Two family frame
1150 EAST 88 STREET
BROOKLYN · Canarsie · BIN 3254731
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4AZoning
1,811 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 2,600 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalPlumbingFire ProtectionGeneral
Roof1 filing · 4 docs
Floor 215p · 2 filings · 20 docs
Floor 1
Site & exterior19p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/13/2024
BOLT ARCHITECTURE, PLLC503/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LY AND ME DESIGNS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KISHAN PLUMBING & HEATINGGeneral Contractor507/08/2026
C.R.P PLUMBING & HTG INCPlumbing507/08/2026
JEFFREY MARINELLOElectrical303/21/2026
ISLAND ELECTRIC CORP 004835General Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/13/2024
BOLTARCHITECTURE,PLLC6712303/28/2023
Building Lifecycle
All (31)Filed (6)Permit Issued (5)Signed Off (2)Violation (5)Inspection (3)Special Inspection (10)
12/09/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 29 Panels, 11.89 kW
B01049783-I1
05/15/2024
Permit issued — Solar
B01049783-I1-SL
05/13/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 29 Panels, 11.89 kW
B01049783-I1
03/31/2023
Signed off — Alteration
INTERIOR ALTERATIONS TO EXIST. TWO FAMILY DWELLING. INTERIOR ALTERATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES AT THE SECOND FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00657825-I1
03/28/2023
Filed — Alteration
INTERIOR ALTERATIONS TO EXIST. TWO FAMILY DWELLING. INTERIOR ALTERATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES AT THE SECOND FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00657825-P1
03/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
03/23/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
02/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2023
Permit issued — Construction Fence
B00463841-S1-FN
01/31/2023
Permit issued — Plumbing
B00657825-I1-PL
01/26/2023
Filed — Alteration
INTERIOR ALTERATIONS TO EXIST. TWO FAMILY DWELLING. INTERIOR ALTERATIONS TO INCLUDE THE RELOCATION OF EXISTING PLUMBING FIXTURES AND PROPOSED NEW FIXTURES AT THE SECOND FLOOR. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
B00657825-I1
01/09/2023
Filed — Alteration
APPLICATION FILED HEREWITH TO PROVIDE A CONSTRUCTION FENCE AT THE SIDE YARD. REMEDY VIOLATION # 39505613J.
B00463841-P1
12/14/2022
Permit issued — General Construction
B00463841-I1-GC
10/07/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO PROVIDE A CONSTRUCTION FENCE AT THE SIDE YARD. REMEDY VIOLATION # 39505613J.
B00463841-S1
08/26/2022
Violation issued (ECB, closed)
Construction
08/26/2022
Violation issued (ECB, closed)
Site Safety
08/26/2022
Violation issued (ECB, closed)
Unknown
08/26/2022
Violation issued (ECB, closed)
Construction
08/26/2022
Violation issued (ECB, closed)
Construction
08/09/2022
Permit issued — General Construction
B00463841-I1-GC
01/23/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
ROMERO CHAMBERS JR
01/06/2022
Special inspection requirement — Interior lighting power
ROMERO CHAMBERS JR
10/14/2021
Filed — Alteration
APPLICATION FILED HEREWITH TO PROVIDE A CONSTRUCTION FENCE AT THE SIDE YARD. REMEDY VIOLATION # 39505613J.
B00463841-I1
08/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROMERO CHAMBERS JR
08/10/2021
Special inspection requirement — Energy Code Compliance Inspections
ROMERO CHAMBERS JR
08/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROMERO CHAMBERS JR
08/10/2021
Special inspection requirement — Insulation placement and R values
ROMERO CHAMBERS JR
08/10/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
ROMERO CHAMBERS JR
02/01/2021
Special inspection requirement — Final
ROMERO CHAMBERS JR
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/15/2024
DOB NOWConstruction FencePermit IssuedKISHAN PLUMBING & HEATING02/10/2023
DOB NOWPlumbingSigned-offC.R.P PLUMBING & HTG INC01/31/2023
DOB NOWGeneral ConstructionPermit IssuedKISHAN PLUMBING & HEATING12/14/2022
DOB NOWGeneral ConstructionPermit IssuedKISHAN PLUMBING & HEATING08/09/2022
2 projects · most recent 05/10/2024
General Wiring
FiledStatusContractorScope
05/10/2024CompleteISLAND ELECTRIC CORP—
12/20/2022Permit IssuedTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 01/09/2023
FiledStatusContractorScope
01/09/2023Permit IssuedKISHAN PLUMBING & HEATING1 scope_items
1 project · most recent 01/09/2023
Fence
FiledStatusContractorScope
01/09/2023Permit IssuedKISHAN PLUMBING & HEATINGFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/28/2023Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
03/23/2023Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
01/23/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)ROMERO CHAMBERS JRspecial
01/06/2022Interior lighting powerROMERO CHAMBERS JRenergy_progress
08/10/2021Fire-Resistant Penetrations and JointsROMERO CHAMBERS JRspecial
08/10/2021Energy Code Compliance InspectionsROMERO CHAMBERS JRprogress
08/10/2021Structural Stability – Alterations of existing buildingsROMERO CHAMBERS JRspecial
08/10/2021Insulation placement and R valuesROMERO CHAMBERS JRenergy_progress
08/10/2021Fenestration and door U-factor and product ratingsROMERO CHAMBERS JRenergy_progress
02/01/2021FinalROMERO CHAMBERS JRprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/28/2026B00463841-P1Request digital key ↗
08/28/2026B00463841-S1Request digital key ↗
08/27/2026B00657825-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/28/2026B00463841-I1Request digital key ↗
08/28/2026B00463841-P2Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00463841-I1Open ↗
08/13/2026B00463841-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00463841-P2Open ↗
08/13/2026B00463841-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature10
08/23/2026B00463841-I1Open ↗
08/23/2026B00463841-I1Open ↗
08/23/2026B00463841-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026B00657825-I1Open ↗
08/26/2026B00657825-P1Open ↗
08/23/2026B00463841-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00463841-P2Open ↗
08/28/2026B00463841-I1Open ↗
08/28/2026B00463841-P1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00463841-P2Open ↗
08/13/2026B00463841-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B00463841-I1Open ↗
08/28/2026B00463841-P2Open ↗
08/27/2026B00657825-I1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01049783-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00463841-I1Open ↗
08/13/2026B00463841-P2Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00463841-P2Open ↗
08/13/2026B00463841-I1Open ↗