← Back
Primarily 2 family with 1 store or office
1150 OGDEN AVENUE
BRONX · BIN 2003266
💬 Discuss this project
1929Year Built
3Stories
S2Building Class
R7-1Zoning
3,207 sfGross Floor Area
3Units
1 Open Violation ▸
Primarily 2 family with 1 store or office · 2,875 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 5 docs
Floor 16p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
REAL CREATIVE MOTION ENGINEERING SE602/18/2026
KDV DESIGNS ARCHITECTS LLC106/12/2025
FRANZ SEBORGA409/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOZZETTO E NY DPC603/21/2026
EMC VIOLATIONS REMOVAL103/21/2026
IMA ENGINEERING1003/21/2026
TBC & ASSOC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JORGE CONSTRUCTION CORPGeneral Contractor407/08/2026
FOUR POINTS P & H CORPPlumbing407/08/2026
MAMC CONSULTING REPS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519602/18/2026
ROJAS ENGINEERING PLLC6232106/12/2025
Building Lifecycle
All (71)Filed (11)Permit Issued (8)Signed Off (6)Violation (10)Inspection (11)Objection (8)Special Inspection (17)
08/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Permit issued — Mechanical Systems
X01151448-S2-MS
04/28/2026
Signed off — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-I1
04/14/2026
Signed off — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-S3
04/14/2026
Signed off — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-S1
04/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/18/2026
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-P2
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
01/22/2026
Signed off — Alteration
X00557280-I1
01/22/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Objection resolved — Addressed
12/11/2025
Objection raised — Admin
12/04/2025
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-P1
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2025
Permit issued — Plumbing
X01151448-S3-PL
08/20/2025
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-S3
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2025
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-S2
05/28/2025
Permit issued — Plumbing
X01151448-S1-PL
05/22/2025
Permit issued — Mechanical Systems
X01151448-I1-GC-CX
03/03/2025
Permit issued — General Construction
X01151448-I1-GC-CX
01/29/2025
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-I1
01/29/2025
Filed — Alteration
Relocate existing commercial food establishment store gas meter to outside. Install emergency gas valve for existing commercial kitchen hood. Install 2hrs fire rated corridor enclosure for gas pipes at ceiling. Replace gas pipes of fixtures as per plans
X01151448-S1
01/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
12/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/26/2023
Signed off — Alteration
Proposed New Bath Room and Replace Existing fixture on third and second floor
X00639835-I1
03/10/2023
Signed off — Alteration
X00804880-I1
02/24/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/10/2023
Permit issued — Boiler Equipment
X00804880-I1-BE
01/03/2023
Objection raised — Structural
01/03/2023
Objection resolved — Addressed
01/03/2023
Objection raised — Structural
01/03/2023
Objection resolved — Addressed
01/03/2023
Objection raised — Structural
01/03/2023
Objection resolved — Addressed
12/30/2022
Filed — Alteration
X00804880-I1
12/28/2022
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/27/2022
Special inspection requirement — Heating Systems
Younes Abouyaala
09/21/2022
Filed — Alteration
Proposed New Bath Room and Replace Existing fixture on third and second floor
X00639835-P2
06/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/11/2022
Filed — Alteration
Proposed New Bath Room and Replace Existing fixture on third and second floor
X00639835-P1
04/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2022
Permit issued — Plumbing
X00639835-I1-PL
01/14/2022
Filed — Alteration
Proposed New Bath Room and Replace Existing fixture on third and second floor
X00639835-I1
08/13/2021
Permit issued — General Construction
X00557280-I1-GC
07/15/2021
Filed — Alteration
X00557280-I1
07/13/2021
Special inspection requirement — Fenestration air leakage
FRANZ SEBORGA
07/13/2021
Special inspection requirement — Lowest Floor Elevation
FRANZ SEBORGA
07/13/2021
Special inspection requirement — Interior lighting power
FRANZ SEBORGA
07/13/2021
Special inspection requirement — Insulation placement and R values
FRANZ SEBORGA
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMAMC CONSULTING REPS LLC06/11/2026
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP10/17/2025
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP05/28/2025
DOB NOWMechanical SystemsSigned-offJORGE CONSTRUCTION CORP05/22/2025
DOB NOWGeneral ConstructionSigned-offJORGE CONSTRUCTION CORP03/03/2025
DOB NOWBoiler EquipmentSigned-offFOUR POINTS P & H CORP02/10/2023
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP03/29/2022
DOB NOWGeneral ConstructionSigned-offJORGE CONSTRUCTION CORP08/13/2021
BIS—ISSUEDPEA CORP10/06/2004
BIS—ISSUEDPEA CORP01/02/2004
BISOTISSUEDAARON CHEUNG,PEPC01/09/2003
BISPLISSUEDN/A01/06/1992
BISEQISSUEDW.C.L. CONSTRUCTION INC11/14/1991
BISOTISSUEDW.C.L CONSTRUCTION INC11/14/1991
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS01/17/1991
BISOTISSUEDW.C.L CONSTRUCTION INC01/11/1991
BISEQISSUEDW.C.L. CONSTRUCTION INC01/11/1991
1 project · most recent 02/18/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedMAMC CONSULTING REPS LLCVentilation Systems
Ventilation
Canarm 207 1,400 CFM · Exhaust Fan ×1
Dayton 56JN95 3,000 CFM · Kitchen Exhaust ×1
Captiveaire MODEL # NCA18HFA 3,500 CFM · Kitchen Exhaust ×1
1 project · most recent 02/18/2026
Gas
FiledStatusContractorScope
02/18/2026Signed-offFOUR POINTS P & H CORPGas
1 project · most recent 09/27/2021
General Wiring Lighting
FiledStatusContractorScope
09/27/2021CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/22/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/17/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/17/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
11/25/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
11/25/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/28/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/02/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
12/28/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/28/2022Tenant Protection Plan ComplianceYounes Abouyaalaspecial
12/27/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/27/2022Heating SystemsYounes Abouyaalaspecial
07/13/2021Fenestration air leakageFRANZ SEBORGAenergy_progress
07/13/2021Lowest Floor ElevationFRANZ SEBORGAprogress
07/13/2021Interior lighting powerFRANZ SEBORGAenergy_progress
07/13/2021Insulation placement and R valuesFRANZ SEBORGAenergy_progress
07/13/2021Fire-Resistance Rated ConstructionFRANZ SEBORGAprogress
07/13/2021Energy Code Compliance InspectionsFRANZ SEBORGAprogress
07/13/2021FinalFRANZ SEBORGAprogress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026X00557280-I1Request digital key ↗
08/24/2026X00639835-P1Request digital key ↗
08/24/2026X00639835-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026X00557280-I1Open ↗
08/24/2026X00639835-I1Open ↗
08/24/2026X00639835-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/26/2026X01151448-S1Open ↗
08/25/2026X00557280-I1Open ↗
08/25/2026X00557280-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026X01151448-S1Open ↗
09/23/2026X00804880-I1Open ↗
08/27/2026X01151448-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/14/2026X00804880-I1Open ↗
08/13/2026X01151448-I1Open ↗
08/13/2026X01151448-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00557280-I1Open ↗