ECB08/07/2015FAILURE TO FILE C OF C FOR NOV #35113225Y ISSUED ON 1-9-15.$-285 due
ECB06/11/2015FAILURE TO COMPLY W/ THE COMM'S ORDER CONTAINED IN NOTICE OF VIO#35113225J ISSUED ON 1/9/15.FOR WORK W/O A PERMIT @ CELLAR,1ST FL & ATTIC.REM COMPLY W/ THE COMM'S ORDER$-1,995 due
DOB06/03/2015FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB06/03/2015FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD08/05/2014SECTION 27-2142 ADM CODE - THE PREMISES OR APTS. HAVE BEEN VACATED BY THE DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR CELLAR APARTMENT AT EAST
HPD07/02/2014SECTION 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE STOVE AT CELLAR
HPD07/02/2014SECTION 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS BATHROOM AND KITCKEN AT CELLAR
HPD07/10/2005SECTION 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE .. IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, APARTMENT AT EAST
HPD07/10/2005SECTION 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS .. IN THE ENTIRE APARTMENT LOCATED AT APT BSMT, APARTMENT AT EAST
HPD07/10/2005SECTION 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY
HPD03/29/2005SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GAS RANGE KITCHEN BASEMENT APT.
HPD03/29/2005SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES KITCHEN BASEMENT APT.
ECB04/17/2015FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #35113225J ISSUED ON 1/9/15. CELLAR,1ST FL & ATTIC WORK W/O PERMIT. NO PERMIT HAS BEEN ISSUED TO REMEDY THE CONDITION CITED.Nothing owed — awaiting certificate of correction
ECB03/02/2015WORK W/O A PERMIT. NOTED: AT CELLAR LEVEL INSTALLED 3PC BATHROOM(SHOWER,SINK,TOILET)FULL HEIGHT PARTITION WALLS CREATING 3 ROOMS,W/NEW DOORS,LOCK DOOR DEVICES,FRAMES,ELECTRICAL OUTLETS,SWITCHES,LIGHTING,WINDOWSNothing owed — awaiting certificate of correction
ECB01/09/2015FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT BOILER RMCEILING OPEN CONNECTION BOXES W/EXPOSED ELECTRICAL WIRES,BX CABLE UNATTACHED,ENTANGLED OVER COPPER WATER LINES,THROUGHOUT BOILER RM. ALSO,Nothing owed — awaiting certificate of correction