← Back
Two stories - detached, small or mid-size
1154 62 STREET
BROOKLYN · Dyker Heights · BIN 3141521
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,152 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,800 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 9 docs
Floor 11p · 1 filing · 4 docs
Cellar5p · 2 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2023$1.1M—Private party → Private party$981/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI412/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394212/27/2023
Building Lifecycle
All (20)Filed (4)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (8)
01/03/2024
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE BATHROOM FIXTURES; NEW BOILER AND HOT WATER HEATER ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897256-I1
12/29/2023
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897250-I1
12/27/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897250-P1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Final
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/10/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE BATHROOM FIXTURES; NEW BOILER AND HOT WATER HEATER ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897256-P1
08/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/06/2023
Permit issued — General Construction
B00897250-I1-GC
07/06/2023
Permit issued — Plumbing
B00897256-I1-PL
07/03/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE BATHROOM FIXTURES; NEW BOILER AND HOT WATER HEATER ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897256-I1
07/03/2023
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00897250-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC07/06/2023
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC07/06/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/27/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/27/2023Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/27/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/27/2023Final—progress
12/27/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/27/2023FinalFARHAD BASSIRI-TEHRANIprogress
12/27/2023Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/27/2023Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00897250-P1Request digital key ↗
08/27/2026B00897250-I1Request digital key ↗
08/27/2026B00897256-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00897250-P1Open ↗
08/27/2026B00897250-I1Open ↗
08/27/2026B00897256-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B00897250-P1Open ↗
08/28/2026B00897250-I1Open ↗
08/28/2026B00897250-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00897250-P1Open ↗
08/28/2026B00897250-I1Open ↗