| Owner | Filings | Most Recent |
|---|---|---|
| 1165 PARK AVENUE | 106 | 03/22/2026 |
| JERRICK ASSOC | 5 | 03/22/2026 |
| C/O INSIGNA RESID. GROUP | 1 | 03/22/2026 |
| INSIGNIA RESIDENTIAL GROUP | 9 | 03/22/2026 |
| 1165 PARK AVE INC 1164 PARK AVE INC | 1 | 03/22/2026 |
| RESIDENTIAL | 1 | 03/22/2026 |
| TECTONIC BUILDERS | 1 | 03/21/2026 |
| DOUGLAS ELLIMAN PROPERTY MANAG | 1 | 03/21/2026 |
| 1165 PARK AVE INC-C O DOUGLAS | 8 | 03/21/2026 |
| DOUGLAS ELLIMAN PROPERTY MGMT | 5 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RJD ENGINEERING LLC | 2 | 08/19/2026 |
| G.P. SCHAFER ARCHITECT, DPC | 2 | 07/29/2026 |
| SY ENGINEERING PLLC | 1 | 07/15/2026 |
| MICHAEL MAHAL ARCHITECTURE, PLLC | 2 | 07/13/2026 |
| WEIL FRIEDMAN ARCHITECTS | 1 | 06/30/2026 |
| RAYMOND NERENBERG PE | 1 | 06/16/2026 |
| REVANS DESIGN PE PC | 4 | 04/20/2026 |
| LUKE LICALZI, P.E., P.C. | 1 | 04/04/2026 |
| ABS ENGINEERING, PLLC | 5 | 02/24/2026 |
| KATE PLATT | 6 | 02/23/2026 |
| NICHOLAS DERAMO ARCHITECT | 2 | 03/12/2025 |
| KAM CHIU CONSULTING ENGINEER, P.C. | 2 | 03/11/2025 |
| RUTH GYUSE | 3 | 03/04/2025 |
| SETH P. ROYE ARCHITECT PC | 1 | 01/23/2025 |
| CHARLES G. MICHEL ENGINEERING, PC. | 3 | 11/05/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 5 | 08/20/2024 |
| KAY LEONG AKERLOF ARCHITECTURE | 6 | 07/25/2024 |
| ALL CITY ENGINEERING PC | 6 | 05/14/2024 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 8 | 04/29/2024 |
| ALLEN + KILLCOYNE ARCHITECTS LLP | 2 | 10/30/2023 |
| JOHN B MURRAY ARCHITECT, LLC | 1 | 06/28/2023 |
| RAWLINS DESIGN INC. | 3 | 02/28/2023 |
| CARLY WEISMAN ARCHITECTURE & DESIGN | 3 | 10/20/2022 |
| EDG | 3 | 08/08/2022 |
| RANDALL P. COLLINS ARCHITECT, PC | 1 | 07/15/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| GAMILL ENGINEERING, PC | 16 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 3 | 03/21/2026 |
| EPAC BUILDING CONSULTING INC | 10 | 03/21/2026 |
| HOWARD L ZIMMERMAN ARCHITECTS | 20 | 03/21/2026 |
| CODE | 18 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| RESOLUTION EXPEDITING | 18 | 03/21/2026 |
| LMS-ACE SERVICES | 5 | 03/21/2026 |
| BG & ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EMPIRE NY INSTALLATIONS INC | General Contractor | 15 | 07/08/2026 |
| C&G A-PLUS INTERIOR REMOD | General Contractor | 6 | 03/21/2026 |
| LINDEN MARSHALL CONTRACTING INC | General Contractor | 6 | 07/08/2026 |
| ALL VISION GENERAL CONST* | General Contractor | 5 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 4 | 07/08/2026 |
| VELLA INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| DEMARI SERVICES INC | General Contractor | 3 | 08/25/2026 |
| ALKLEM PLUMBING INC | Plumbing | 3 | 07/08/2026 |
| NU CREATION MECH INC | General Contractor | 2 | 04/09/2026 |
| ZDG, LLC | General Contractor | 2 | 07/08/2026 |
| AQUA PLUMBING & HTNG CORP | Plumbing | 2 | 07/08/2026 |
| CORNERSTONE CONSTRUCTION | General Contractor | 2 | 07/08/2026 |
| A.L.L. CONSTRUCTION AND D | General Contractor | 2 | 04/09/2026 |
| STRUCTURE VENTURES LLC | General Contractor | 2 | 04/09/2026 |
| THOMAS MAINTENANCE INC | General Contractor | 2 | 07/08/2026 |
| ARISTA AIR CONDITIONING CORP | General Contractor | 2 | 03/21/2026 |
| WEISS, NORMAN | Electrical | 1 | 03/21/2026 |
| ALKLEM PLUMBING INC. | Fire Protection | 1 | 07/08/2026 |
| SCUTARI RENOVATIONS LLC | General Contractor | 1 | 07/08/2026 |
| THINK CONSTRUCTION LLC | General Contractor | 1 | 07/08/2026 |
| TRIESTE CONSTRUCTION CORP | General Contractor | 1 | 04/08/2026 |
| URBAN STANDARD GENERAL CO | General Contractor | 1 | 07/31/2026 |
| V C S MECHANICAL INC | General Contractor | 1 | 08/01/2026 |
| VEMA GROUP LLC | General Contractor | 1 | 07/08/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 1 | 07/23/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| H. A. BADER CONSULTANTS | 2332 | 3 | 07/29/2026 |
| SY ENGINEERING PLLC | 5149 | 2 | 07/15/2026 |
| O'ROURKE ENGINEERING, LLC | 5873 | 3 | 06/30/2026 |
| REVANS DESIGN PE PC | 4617 | 4 | 04/20/2026 |
| JSPECS,INC | 9429 | 8 | 02/24/2026 |
| INTEGRITY CONSULTING SERV | 666 | 2 | 03/13/2025 |
| SKYLINE ENGINEERING, PLLC | 267 | 5 | 03/11/2025 |
| SAG ENGINEERING & CONSULT | 608 | 1 | 01/23/2025 |
| SETH P ROYE ARCHITECT PC | 8554 | 1 | 01/23/2025 |
| KAY LEONG AKERLOF ARCHITE | 1594 | 2 | 07/25/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | DEMARI SERVICES INC | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | NEW YORK PARK PLBG&HTG CO | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | V C S MECHANICAL INC | 07/31/2026 |
| DOB NOW | General Construction | Permit Issued | URBAN STANDARD GENERAL CO | 07/30/2026 |
| DOB NOW | Plumbing | Permit Issued | ARCON PLBG SOLUTIONS | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | THINK CONSTRUCTION LLC | 06/01/2026 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 05/05/2026 |
| DOB NOW | Boiler Equipment | Signed-off | C C CONTROLLED COMBUSTION | 04/23/2026 |
| DOB NOW | Boiler Equipment | Signed-off | C C CONTROLLED COMBUSTION | 04/08/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 03/27/2026 |
| DOB NOW | General Construction | Permit Issued | A.L.L. CONSTRUCTION AND D | 03/24/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 03/24/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 03/18/2026 |
| DOB NOW | General Construction | Permit Issued | A.L.L. CONSTRUCTION AND D | 03/16/2026 |
| DOB NOW | Mechanical Systems | Signed-off | NU CREATION MECH INC | 02/18/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 09/15/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 08/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NU CREATION MECH INC | 07/18/2025 |
| DOB NOW | Plumbing | Signed-off | CC CONTROLLED PLBG CO.,IN | 07/16/2025 |
| DOB NOW | Boiler Equipment | Signed-off | C C CONTROLLED COMBUSTION | 07/11/2025 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | TRIESTE CONSTRUCTION CORP | 07/07/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 05/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE VENTURES LLC | 04/30/2025 |
| DOB NOW | Plumbing | Signed-off | VILLAGE P & H NY INC | 04/23/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE VENTURES LLC | 04/18/2025 |
| DOB NOW | General Construction | Permit Issued | DEMARI SERVICES INC | 04/16/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 08/28/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 08/20/2024 |
| DOB NOW | Plumbing | Signed-off | CATMAN PLUMBING INC | 07/22/2024 |
| DOB NOW | General Construction | Signed-off | C&G A-PLUS INTERIOR REMOD | 07/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | C&G A-PLUS INTERIOR REMOD | 07/09/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 01/08/2024 |
| DOB NOW | Plumbing | Signed-off | MASTER 2 PLBG & HTG INC | 11/27/2023 |
| DOB NOW | General Construction | Signed-off | VELLA INTERIORS INC | 11/22/2023 |
| DOB NOW | Mechanical Systems | Signed-off | VELLA INTERIORS INC | 11/21/2023 |
| DOB NOW | General Construction | Signed-off | VEMA GROUP LLC | 11/16/2023 |
| DOB NOW | General Construction | Signed-off | LINDEN MARSHALL CONTRACTI | 10/24/2023 |
| DOB NOW | General Construction | Signed-off | LINDEN MARSHALL CONTRACTI | 09/28/2023 |
| DOB NOW | Plumbing | Signed-off | ALKLEM PLUMBING INC | 07/21/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/29/2026 | Permit Issued | THINK CONSTRUCTION LLC | Air Conditioning Systems | Cooling Task TYC021TWEC-25K 24,000 BTU · Condensing Unit ×1 |
| 07/15/2026 | Permit Issued | V C S MECHANICAL INC | Air Conditioning Systems | Cooling |
| 02/24/2026 | Permit Issued | A.L.L. CONSTRUCTION AND D | Air Conditioning Systems, Ventilation Systems | Cooling Carrier FJ5ANXB30-L00 30,000 BTU · Ahu ×4 Task Applied Products TYC021TWEC-30K-3423 29,900 BTU · Condensing Unit ×4 |
| 05/15/2025 | Signed-off | NU CREATION MECH INC | Air Conditioning Systems | Cooling International Comfort Products FMC5Z-2400AL 26,010 BTU · Fan Coil Indoor ×3 TYC021TW-25K 25,400 BTU · Condensing Unit ×3 |
| 03/13/2025 | Permit Issued | STRUCTURE VENTURES LLC | Air Conditioning Systems | Cooling Task TYC021TW-30K-3423 29,900 BTU · Condensing Unit ×1 |
| 06/23/2020 | — | — | Air Conditioning Systems | Cooling Mitsubishi Electric PFFY-P12NRMU-E 120 CFM · Vrf Indoor ×1 PUMY-P60NKMU2-BS 600 CFM · Vrf Outdoor ×1 PVFY-P24NAMU-E1 240 CFM · Vrf Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | ARCON PLBG SOLUTIONS | Gas, Water/Sanitary |
| 07/15/2026 | Permit Issued | NEW YORK PARK PLBG&HTG CO | Gas, Water/Sanitary |
| 04/20/2026 | Signed-off | CC CONTROLLED PLBG CO.,IN | Gas |
| 02/24/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 01/23/2026 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 05/15/2025 | Signed-off | GOLDS PLUMBING CORP | Gas, Water/Sanitary |
| 03/13/2025 | Signed-off | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 09/22/2021 | Signed-off | AQUA PLUMBING & HTNG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Complete | BIG CITY ELECL SOLUTIONS | General Wiring |
| 08/03/2026 | Permit Issued | W 8 ELECTRIC CORP | General Wiring |
| 03/25/2026 | Permit Issued | EINSTEIN ELEC'L CORP | General Wiring |
| 03/25/2026 | Permit Issued | EINSTEIN ELEC'L CORP | General Wiring |
| 12/15/2025 | Permit Issued | FRACCAVENTO ELEC. CORP | General Wiring |
| 04/28/2025 | Complete | ARMA ELECTRIC INC | General Wiring |
| 02/21/2025 | Complete | AMOR ELECTRIC CORP | General Wiring |
| 09/17/2024 | Permit Issued | INTERSTATE ELECTRIC, LLC | General Wiring |
| 08/28/2024 | Permit Issued | INTERSTATE ELECTRIC, LLC | General Wiring |
| 08/14/2024 | Permit Issued | MEGA ELEC'L CONTR'G, INC | — |
| 03/28/2024 | Complete | JOSEPH SGROI & SONS, INC. | General Wiring |
| 02/06/2024 | Complete | A & M ELEC'L SERVICE INC. | General Wiring |
| 01/09/2024 | Complete | MEGA ELEC'L CONTR'G, INC | — |
| 11/30/2023 | Complete | MICHAEL BROS. ELECT. CORP | General Wiring |
| 10/25/2023 | Permit Issued | CONA ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Signed-off | C C CONTROLLED COMBUSTION | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2024 | Permit Issued | DEMARI SERVICES INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/20/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/17/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/20/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 04/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/20/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/20/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 09/20/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/03/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/17/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/31/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/29/2024 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 04/25/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/16/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/26/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 03/07/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/04/2026 | Fire-Resistant Penetrations and Joints | Howard Bader | special |
| 08/04/2026 | Final | Howard Bader | progress |
| 08/04/2026 | Tenant Protection Plan Compliance | — | special |
| 08/04/2026 | Post-installed Anchors | Howard Bader | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/13/2026 | Interior lighting power | Michael Mahal | energy_progress |
| 07/13/2026 | Energy Code Compliance Inspections | Michael Mahal | progress |
| 07/13/2026 | Fire-Resistance Rated Construction | Michael Mahal | progress |
| 06/12/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/12/2026 | Post-installed Anchors | — | special |
| 06/09/2026 | Final | RAYMOND NERENBERG | progress |
| 06/09/2026 | Mechanical Systems | — | special |
| 06/02/2026 | Post-installed Anchors | BRIAN O'ROURKE | special |
| 04/29/2026 | Fire-Resistant Penetrations and Joints | BRIAN O'ROURKE | special |
| 04/29/2026 | Final | Greta Weil | progress |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | SUNGBOM YI | special |
| 04/13/2026 | Post-installed Anchors | SUNGBOM YI | special |
| 04/07/2026 | Final | Michael Mahal | progress |
| 03/18/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 02/16/2026 | Post-installed Anchors | Jeffrey Stones | special |
| 02/16/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 01/21/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 01/21/2026 | Mechanical Systems | Jeffrey Stones | special |
| 01/21/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 01/21/2026 | Final | Kate Platt | progress |