← Back
BuildNYC
Three families
1158 GLENMORE AVENUE
BROOKLYN · BIN 3094794
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
R5Zoning
3,600 sfGross Floor Area
3Units
Rent Stabilized129 Active Violations ▸FDNY Report ↗
Three families · 1,400 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 17 docs
Floor 31 filing · 17 docs
Floor 21 filing · 17 docs
Floor 1Unit 11 filing · 17 docs
Cellar1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cypress Corners503/22/2026
NYC Department of Housing Preservation and Development503/21/2026
Pitkin-Berriman HDFC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Loring Consulting Engineers203/04/2025
Old Structures Engineering112/03/2024
Eskw/A111/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Betro Design Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Erin Construction DevelopmntGeneral Contractor203/21/2026
Hashem ContractingGeneral Contractor107/12/2000
UnicPlumbing107/15/2005
Building Lifecycle
09/03/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MASONRY AT DOOR SADLLE IN THE BATHROOM LOCATED AT APT 1, 1st…
HPD violation · open
09/03/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD AT SINK BASE CABINET FLOOR IN THE KITCHEN LOCATED AT APT 1,…
HPD violation · open
09/03/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1,…
HPD violation · open
09/03/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · open
09/03/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1,…
HPD violation · open
234 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDAmok07/15/2005
BIS—ISSUEDErin Construction & Development03/29/2005
BIS—ISSUEDErin Construction & Development04/02/2004
BISOTISSUEDHashem Contracting07/12/2000
1 project · most recent 03/04/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/04/2025——Gas, Water/Sanitary
1 project · most recent 03/04/2025
Masonry
FiledStatusContractorScope
03/04/2025——Masonry
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/17/2024HVAC-R and service water heating system controls—energy_progress
12/17/2024Mechanical Systems—special
12/17/2024Heating Systems—special
12/17/2024Maintenance information—energy_progress
12/17/2024HVAC-R and service water piping design and insulation—energy_progress
12/17/2024HVAC-R and service water heating equipment—energy_progress
12/17/2024Energy Code Compliance Inspections—progress
12/17/2024Final—progress
12/17/2024Shutoff dampers—energy_progress
11/13/2024Final—progress
11/13/2024Masonry—special
11/13/2024Tenant Protection Plan Compliance—special
10/31/2024Fire-Resistant Penetrations and Joints—special
10/31/2024Insulation placement and R values—energy_progress
10/31/2024Fenestration air leakage—energy_progress
10/31/2024Fenestration and door U-factor and product ratings—energy_progress
10/31/2024Lighting controls—energy_progress
10/31/2024Final—progress
10/31/2024Energy Code Compliance Inspections—progress
10/31/2024Tenant Protection Plan Compliance—special
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account