← Back
Over six families without stores
1158 LENOX ROAD
BROOKLYN · BIN 3101955
💬 Discuss this project
1931Year Built
2Stories
C1Building Class
R6Zoning
3,198 sfGross Floor Area
7Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 1158 LENOX LLC · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CANDOR CAPITAL ONE2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2024$760K—ST. JOHNS AFRICAN METHODIST EPISCOPAL CHURCH, INC. → 1158 LENOX LLC$238/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOWVOLT TECH ENTERPRISESGeneral Contractor507/08/2026
WIZ FIRE SPRINKLERS LLCFire Protection107/08/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616809/17/2025
Building Lifecycle
All (100)Filed (8)Permit Issued (5)Signed Off (4)Violation (7)Inspection (8)Objection (38)Special Inspection (30)
09/29/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S5
09/26/2025
Permit issued — Mechanical Systems
B01123892-S5-MS
09/17/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S5
09/17/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/17/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
09/17/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/17/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
09/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
09/09/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/09/2025
Special inspection requirement — Final
FAHAD FATEH
07/21/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Cost
07/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-P2
07/07/2025
Special inspection requirement — Final
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/07/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
07/07/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/07/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/07/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/07/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/05/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S4
05/28/2025
Permit issued — Structural
B01123892-S4-ST
05/12/2025
Objection resolved — Addressed
05/06/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-P1
05/05/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S3
05/05/2025
Signed off — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S2
04/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Objection raised — Cost
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
02/20/2025
Permit issued — Sprinklers
B01123892-S3-EW-SP
02/18/2025
Permit issued — Plumbing
B01123892-S2-PL
02/11/2025
Objection raised — Scope
02/07/2025
Filed — Alteration CO
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH.
B01123892-S4
02/07/2025
Special inspection requirement — Masonry
FAHAD FATEH
02/05/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
02/05/2025
Special inspection requirement — Structural Steel - Details
FAHAD FATEH
02/05/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
02/05/2025
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
01/28/2025
Special inspection requirement — Final
FAHAD FATEH
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLOWVOLT TECH ENTERPRISES09/26/2025
DOB NOWStructuralSigned-offLOWVOLT TECH ENTERPRISES05/28/2025
DOB NOWSprinklersSigned-offWIZ FIRE SPRINKLERS LLC02/20/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP02/18/2025
DOB NOWGeneral ConstructionPermit IssuedLOWVOLT TECH ENTERPRISES01/07/2025
1 project · most recent 09/17/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/17/2025Signed-offLOWVOLT TECH ENTERPRISESAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Samsung AJ024BXJ3CH 22,000 BTU · Vrf Outdoor ×4
AR12DXDABWKX 12,000 BTU · Condensing Unit ×3
Daikin 2MXL18MVJU9 17,500 BTU · Heat Pump Outdoor ×4
RXF12AXVJU 12,000 BTU · Condensing Unit ×3
Heating
Samsung AJ024BXJ3CH 25,000 BTU · Vrf Outdoor ×4
AR12DXDABWKX 12,000 BTU · Condensing Unit ×3
Daikin 2MXL18WMVJU9 18,500 BTU · Condensing Unit ×4
RXF12AXVJU 13,500 BTU · Condensing Unit ×3
Ventilation
Nutone AEN110 50 CFM · Exhaust Fan ×2
QTXE110150DC 100 CFM · Kitchen Exhaust ×2
1 project · most recent 09/17/2025
Sprinkler System
FiledStatusContractorScope
09/17/2025Signed-offWIZ FIRE SPRINKLERS LLCSprinkler System
1 project · most recent 02/17/2025
General Wiring
FiledStatusContractorScope
02/17/2025CompleteWIRED RIGHT ELECTRICAL INGeneral Wiring
1 project · most recent 09/17/2025
Concrete Masonry Wood
FiledStatusContractorScope
09/17/2025Signed-offLOWVOLT TECH ENTERPRISESConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
09/17/2025Permanent certificateFAHAD FATEHenergy_progress
09/17/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/17/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
09/17/2025Post-installed AnchorsFAHAD FATEHspecial
09/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/17/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/17/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/17/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/17/2025Maintenance informationFAHAD FATEHenergy_progress
09/17/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
09/09/2025Mechanical SystemsFAHAD FATEHspecial
09/09/2025FinalFAHAD FATEHprogress
07/07/2025FinalFAHAD FATEHprogress
07/07/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/07/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/07/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/07/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
07/07/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
07/07/2025Maintenance informationFAHAD FATEHenergy_progress
07/07/2025Permanent certificateFAHAD FATEHenergy_progress
07/07/2025Mechanical SystemsFAHAD FATEHspecial
07/07/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/07/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/07/2025Post-installed AnchorsFAHAD FATEHspecial
02/07/2025MasonryFAHAD FATEHspecial
Latest 25 of 39.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01123892-S4Request digital key ↗
08/23/2026B01123892-S2Request digital key ↗
08/23/2026B01123892-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B01123892-S4Open ↗
08/23/2026B01123892-S3Open ↗
08/23/2026B01123892-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01123892-S5Open ↗
09/02/2026B01123892-S2Open ↗
08/29/2026B01123892-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01123892-S5Open ↗
09/23/2026B01123892-S5Open ↗
09/02/2026B01123892-S2Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/23/2026B01123892-I1Open ↗
08/23/2026B01123892-P1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/23/2026B01123892-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/23/2026B01123892-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/23/2026B01123892-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026B01123892-S4Open ↗
08/23/2026B01123892-S3Open ↗
08/23/2026B01123892-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01123892-I1Open ↗
08/23/2026B01123892-P1Open ↗
08/23/2026B01123892-S5Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/23/2026B01123892-P1Open ↗
08/23/2026B01123892-I1Open ↗
▸DOB NOWFinal Survey1
08/23/2026B01123892-I1Open ↗