DOB12/28/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/04/20163314.1 SCAFFOLD UTILIZED IN CONJUNCTION W.THE CONSTRUCTION OF A BLDG OR STRUCTURE SHALL BE ERECTED AND MAINTAINED BY RAILING MATERIAL.NOTED:@TIME OF INSPECTION,OBSERVED @EXP#1 SUPPORTED SCAFFOLD IS MISSING PLANNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 3,333 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.