← Back
Large suburban residence
116-03 85 AVENUE
QUEENS · Richmond Hill · BIN 4192856
💬 Discuss this project
2022Year Built
2.5Stories
A3Building Class
R2Zoning
4,121 sfGross Floor Area
1Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Large suburban residence · 7,500 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeCivilGeneral
Floor 213p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CSB CONTRACTING CO OF NY203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/27/2021$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WORLD DESIGN ARCHITECTURE,PLLC110/22/2024
NASIR J, KHANZADA LLC1407/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC2803/21/2026
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CSB CONTRACTING CO OF NYGeneral Contractor1807/08/2026
SOLAR PRO INCGeneral Contractor303/21/2026
QBK PLUMBING & HTNG INCPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323110/22/2024
NASIR J. KHANZADA LLC15271307/18/2024
TRIANGLE INSPECTION & TES7495708/08/2023
Building Lifecycle
All (115)Filed (15)Permit Issued (12)Signed Off (4)Violation (14)Inspection (8)Objection (32)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
11/22/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01130220-I1
11/13/2024
Permit issued — Solar
Q01130220-I1-SL
10/22/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01130220-I1
10/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
10/21/2024
Special inspection requirement — Final
JEFFREY BELL
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/21/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
09/13/2024
Signed off — Alteration
INSTALLATION 3 UNITS OF HVAC SYSTEM TO EXISTING ONE FAMILY DWELLING.
Q01079450-I1
09/06/2024
Permit issued — Mechanical Systems
Q01079450-I1-MS
08/21/2024
Objection resolved — Addressed
07/26/2024
Objection raised — Other
07/18/2024
Filed — Alteration
INSTALLATION 3 UNITS OF HVAC SYSTEM TO EXISTING ONE FAMILY DWELLING.
Q01079450-I1
06/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2024
Signed off — Alteration
Q00543120-I1
06/05/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH APPLICATION # Q00543046-I1,Q00547115-I1
Q00543108-I1
05/28/2024
Objection raised — Scope
05/28/2024
Objection resolved — Addressed
05/28/2024
Objection raised — Scope
05/28/2024
Objection resolved — Addressed
05/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/17/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED FOR HORIZONTAL ENLARGEMENT OF EXISTING 1 FAMILY DWELLING.
Q00543046-P7
05/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/03/2024
Permit issued — Plumbing
Q00543108-I1-PL
04/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/10/2024
Permit issued — Structural
Q00543046-I1-GC-CX
11/29/2023
Violation issued (HPD, open)
I
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
08/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
08/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/08/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH APPLICATION # Q00543046-I1,Q00547115-I1
Q00543108-P6
07/21/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH APPLICATION # Q00543046-I1,Q00547115-I1
Q00543108-P5
04/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2023
Objection resolved — Addressed
03/24/2023
Objection raised — Zoning
03/21/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUCTION WITH APPLICATION # Q00543046-I1,Q00547115-I1
Q00543108-P4
03/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
03/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
03/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
03/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
03/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
03/16/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Nasir Khanzada
03/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
03/10/2023
Objection resolved — Addressed
03/10/2023
Objection resolved — Addressed
03/08/2023
Objection resolved — Addressed
03/08/2023
Objection resolved — Addressed
03/07/2023
Objection raised — Admin
03/07/2023
Objection raised — Other
03/07/2023
Objection raised — Inspections
03/07/2023
Objection raised — Admin
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC11/13/2024
DOB NOWMechanical SystemsSigned-offCSB CONTRACTING CO OF NY09/06/2024
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN05/03/2024
DOB NOWStructuralPermit IssuedCSB CONTRACTING CO OF NY01/10/2024
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN02/24/2023
DOB NOWEarth WorkPermit IssuedCSB CONTRACTING CO OF NY01/11/2023
DOB NOWConstruction FenceSigned-offCSB CONTRACTING CO OF NY01/11/2023
DOB NOWPlumbingSigned-offSILVER STAR PLBG & HTG IN02/23/2022
DOB NOWConstruction FenceSigned-offCSB CONTRACTING CO OF NY01/28/2022
DOB NOWFoundationPermit IssuedCSB CONTRACTING CO OF NY01/28/2022
DOB NOWGeneral ConstructionPermit IssuedCSB CONTRACTING CO OF NY10/13/2021
DOB NOWConstruction FenceSigned-offCSB CONTRACTING CO OF NY07/28/2021
2 projects · most recent 10/16/2024
General Wiring
FiledStatusContractorScope
10/16/2024CompleteFLOW STATE ELECTRIC, LLC—
08/24/2021CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 05/17/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
05/17/2024Permit IssuedCSB CONTRACTING CO OF NYSteel, Concrete, Masonry, Wood
1 project · most recent 05/17/2024
Earthwork
FiledStatusContractorScope
05/17/2024Permit IssuedCSB CONTRACTING CO OF NYEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
10/21/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
10/21/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
10/21/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
10/21/2024FinalJEFFREY BELLprogress
10/21/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
08/16/2023HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
08/16/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
08/16/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
08/16/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
08/16/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/16/2023HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
08/16/2023HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
03/16/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
03/16/2023HVAC-R and service water piping design and insulationNasir Khanzadaenergy_progress
03/16/2023HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
03/16/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
03/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNasir Khanzadaspecial
03/16/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/16/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/16/2023HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
02/27/2023Energy Code Compliance InspectionsNasir Khanzadaprogress
02/27/2023HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
02/27/2023HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
02/27/2023Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
Latest 25 of 69.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00543120-I1Request digital key ↗
08/22/2026Q00543046-P1Request digital key ↗
08/22/2026Q00543046-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00543046-P7Open ↗
08/13/2026Q00543046-P6Open ↗
08/13/2026Q00543046-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00543046-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature24
09/01/2026Q00543108-P4Open ↗
09/01/2026Q00543108-P4Open ↗
09/01/2026Q00543108-P4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q00543108-P4Open ↗
09/01/2026Q00543108-P4Open ↗
09/01/2026Q00543108-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00543120-I1Open ↗
08/22/2026Q00543046-P6Open ↗
08/22/2026Q00543046-P7Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00543046-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00543046-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q00543046-P1Open ↗
08/22/2026Q00543046-P2Open ↗
08/22/2026Q00543046-P7Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00543046-I1Open ↗
08/13/2026Q00543108-I1Open ↗
▸Inspections & Test Reports15
▸DOB NOWSOIL REPORT12
08/13/2026Q00543108-P4Open ↗
08/13/2026Q00543108-P3Open ↗
08/13/2026Q00543046-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00543046-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00543046-I1Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026Q00543108-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01130220-I1Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00543046-P1Open ↗
08/13/2026Q00543046-I1Open ↗
08/13/2026Q00543046-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026Q00543046-P6Open ↗
08/13/2026Q00543046-P7Open ↗
08/13/2026Q00543046-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00543046-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00543046-I1Open ↗