💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Gas or electric utility · Owner of record: Con Edison · 8,247 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConsolidated Edison1p · 1 filing · 1 doc
Floor 1Consolidated Edison28p · 1 filing · 15 docs
Site & exteriorConsolidated Edison8p · 2 filings · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter203/21/2026
Rigid Structural Design103/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Breeze NationalGeneral Contractor307/08/2026
Breeze NationalScaffold307/08/2026
Tri Borough ScaffoldingScaffold303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106104/18/2023
Building Lifecycle
All (19)Filed (4)Permit Issued (7)Signed Off (3)Violation (2)Special Inspection (3)
06/04/2024
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BUILDING DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00852673-I1
11/15/2023
Signed off — Full Demolition
Equipment Use
Q00857262-I1
09/26/2023
Signed off — Alteration
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00864619-I1
09/21/2023
Permit issued — Full Demolition
Q00857262-I1-FD
06/08/2023
Permit issued — Full Demolition
Q00857262-I1-FD
06/07/2023
Permit issued — Construction Fence
Q00852673-I1-FN
05/18/2023
Permit issued — Protection and Mechanical Methods
Q00857262-S1-PMM
05/05/2023
Filed — Full Demolition
Equipment Use
Q00857262-S1
05/05/2023
Permit issued — Full Demolition
Q00857262-I1-FD
05/04/2023
Filed — Alteration
Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00864619-I1
05/04/2023
Permit issued — Protection and Mechanical Methods
Q00864619-I1-PMM
04/18/2023
Filed — Full Demolition
Equipment Use
Q00857262-I1
04/10/2023
Special inspection requirement — Demolition
GEORGE GHEBRYAL
04/10/2023
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE GHEBRYAL
04/10/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
04/07/2023
Permit issued — Construction Fence
Q00852673-I1-FN
04/06/2023
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BUILDING DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00852673-I1
09/21/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offBreeze National09/21/2023
DOB NOWFull DemolitionSigned-offBreeze National06/08/2023
DOB NOWConstruction FenceSigned-offBreeze National06/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offBreeze National05/18/2023
DOB NOWFull DemolitionSigned-offBreeze National05/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offTri Borough Scaffolding05/04/2023
DOB NOWConstruction FenceSigned-offBreeze National04/07/2023
BISOTISSUEDAttri Enterprises12/08/2017
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/10/2023DemolitionGEORGE GHEBRYALspecial
04/10/2023Structural Stability – Alterations of existing BuildingsGEORGE GHEBRYALspecial
04/10/2023Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonIndustrial / WarehouseFloor 1
Project Q00864619 Alteration · LOC Issued · 05/04/2023
Project Q00857262 Full Demolition · LOC Issued · 04/18/2023
Project Q00852673 Alteration · LOC Issued · 04/06/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00852673-I1Request digital key ↗
08/24/2026Q00857262-I1Request digital key ↗
08/24/2026Q00857262-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
04/14/2022421803025Open ↗
01/30/2018421568985Open ↗
10/27/2017421568985Open ↗
▸BISWORK PERMIT APPLICATION1
12/12/2017421568985Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q00857262-S1Open ↗
08/24/2026Q00857262-I1Open ↗
08/13/2026Q00864619-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/08/2018421568985Open ↗
05/08/2018421568985Open ↗
10/27/2017421568985Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q00857262-I1Open ↗
08/28/2026Q00857262-I1Open ↗
08/28/2026Q00857262-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/27/2017421568985Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/27/2017421568985Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026Q00857262-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00857262-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q00857262-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00857262-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026Q00857262-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00857262-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
10/27/2017421568985Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/17/2018421568985Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/08/2018421568985Open ↗
10/27/2017421568985Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
04/14/2022421803025Open ↗
01/30/2018421568985Open ↗
▸BISEFILING COVER SHEET2
04/14/2022421803025Open ↗
10/27/2017421568985Open ↗
▸BISADDITIONAL INFORMATION1
02/02/2018421568985Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026Q00857262-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026Q00857262-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00857262-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00857262-I1Open ↗