← Back
BuildNYC
Two family converted from one family
116-05 INWOOD STREET
QUEENS · BIN 4260291
💬 Discuss this project
1945Year Built
2Stories
B3Building Class
R3AZoning
2,382 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic1p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Site & exterior2p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/12/2024$1.3M—135-01 226th St → Private party$534/sf building
06/28/2023$480K—Private party → 135-01 226th St$202/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bakhtiar Shamloo202/01/2024
Tabriz Design Group211/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Design Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Home DevelopmentGeneral Contractor303/21/2026
Precision Home DevelopmentScaffold303/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275302/01/2024
Triangle Inspection & Tes7495111/02/2023
Building Lifecycle
05/29/2026
Rca issued 01/21/25 by badge#3292 to same respondent partially corrected portions of fence cut to comply w/ 4FT max at front & 6 ft max at rear,…
ECB violation · closed
05/31/2024
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
Q00910961-I1-GC-CX
03/08/2024
Signed off — Alteration CO
PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY.
Q00910961-S1
03/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2024
Signed off — Alteration
Q00904149-I1
54 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing11/08/2023
DOB NOWEarth WorkPermit IssuedPrecision Home Development10/03/2023
DOB NOWConstruction FenceSigned-offPrecision Home Development07/19/2023
1 project · most recent 02/01/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/01/2024Permit IssuedPrecision Home DevelopmentAir Conditioning Systems, Ventilation Systems
1 project · most recent 02/01/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/01/2024Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
1 project · most recent 11/12/2023
General Wiring
FiledStatusContractorScope
11/12/2023CompleteC & A ElectricalGeneral Wiring
1 project · most recent 02/01/2024
FiledStatusContractorScope
02/01/2024Signed-offInfiniti Esc Plumbing—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
02/20/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/20/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/20/2024Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
02/20/2024Mechanical SystemsBAKHTIAR SHAMLOOspecial
02/20/2024Subgrade InspectionsBAKHTIAR SHAMLOOspecial
02/20/2024Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
02/20/2024MasonryBAKHTIAR SHAMLOOspecial
02/20/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/20/2024Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
02/20/2024Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
02/20/2024FinalHARI SONIprogress
02/20/2024Structural Wood FrameBAKHTIAR SHAMLOOprogress
02/20/2024Footing and FoundationBAKHTIAR SHAMLOOprogress
02/20/2024HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
02/20/2024Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
02/20/2024Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
02/20/2024HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
02/20/2024Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
02/20/2024Permanent certificateBAKHTIAR SHAMLOOenergy_progress
02/20/2024Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
02/20/2024MeteringBAKHTIAR SHAMLOOenergy_progress
02/20/2024Fenestration areasBAKHTIAR SHAMLOOenergy_progress
02/20/2024Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
02/20/2024Duct leakage testing, insulation and designBAKHTIAR SHAMLOOenergy_progress
02/20/2024HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 33.
37 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account