← Back
BuildNYC
Predominantly retail with other uses
116-07 LIBERTY AVENUE
QUEENS · South Ozone Park · BIN 4440717
💬 Discuss this project
1950Year Built
2Stories
K4Building Class
R6BZoning
6,455 sfGross Floor Area
5Units
17 Active Violations ▸FDNY Report ↗
Predominantly retail with other uses · 3,820 sf lot · 1.69 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Renovation of flooring, walls, and platform2p · 1 filing · 7 docs
Floor 1Renovation of flooring, walls, and platform2p · 1 filing · 7 docs
MezzanineRenovation of flooring, walls, and platform2p · 1 filing · 7 docs
CellarRenovation of flooring, walls, and platform2p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Associates105/24/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hayden Brown ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&A Consulting Engineering3252105/24/2021
Building Lifecycle
All (20)Filed (1)Permit Issued (1)Violation (7)Inspection (1)Objection (8)Special Inspection (2)
03/11/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2021
Permit issued — General Construction
Q00523214-I1-GC
09/12/2021
Objection raised — Accessibility
09/12/2021
Objection resolved — Addressed
09/12/2021
Objection raised — Accessibility
09/12/2021
Objection resolved — Addressed
08/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
08/27/2021
Special inspection requirement — Fire-Resistance Rated Construction
SAEED AINECHI
06/08/2021
Objection raised — Other
06/08/2021
Objection resolved — Addressed
06/08/2021
Objection raised — Other
06/08/2021
Objection resolved — Addressed
05/24/2021
Filed — Alteration CO
PROPOSE RENOVATION OF EXISTING FLOORING, WALLS AND REMOVAL OF EXISTING PLATFORM AS SHOWN ON THE PLANS ONLY ON THE FIRST FLOOR AND MEZZANINE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00523214-I1
04/19/2017
Violation issued (ECB, closed)
Plumbing
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHayden Brown Cons12/27/2021
2 projects · most recent 07/25/2022
General Wiring
FiledStatusContractorScope
07/25/2022CompleteSNB Electrical ContngGeneral Wiring
01/16/2021CompleteWilldan Electrical of NYGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/11/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/27/2021Fire-Resistant Penetrations and JointsSAEED AINECHIspecial
08/27/2021Fire-Resistance Rated ConstructionSAEED AINECHIprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026Q00523214-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00523214-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00523214-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026Q00523214-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00523214-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00523214-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00523214-I1Open ↗