← Back
One story - permanent living quarter
116-28 232 STREET
QUEENS · BIN 4244723
💬 Discuss this project
1940Year Built
1.75Stories
A2Building Class
R2AZoning
1,547 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,500 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC109/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116109/19/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (2)Special Inspection (5)
03/14/2025
Signed off — Alteration
Q01113717-I1
09/20/2024
Permit issued — Solar
Q01113717-I1-SL
09/19/2024
Filed — Alteration
Q01113717-I1
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
09/18/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
09/27/2004
Violation issued (ECB, closed)
Quality of Life
09/27/2004
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP09/20/2024
3 projects · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompleteJSP ELECTL CNTNG CORP—
06/15/2020CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
02/10/2020CompleteALL WAYS ELECTRIC CORP.W—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/18/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
09/18/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
09/18/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
09/18/2024FinalVYACHESLAV NECHAYEVprogress
09/18/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01113717-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q01113717-I1Open ↗
08/26/2026Q01113717-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01113717-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q01113717-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01113717-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01113717-I1Open ↗