Two family converted from one family
116-31 120 STREET
QUEENS · South Ozone Park · BIN 4253572
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3-2Zoning
1,512 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: 116-31 120 STREET CORP · 2,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2021$425K—— → —$281/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.404/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S.GOOLCHARAN CONSTRUCTIONGeneral Contractor303/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781404/18/2022
Building Lifecycle
All (56)Filed (4)Permit Issued (2)Signed Off (1)Violation (2)Inspection (11)Objection (6)Special Inspection (30)
11/15/2022
Signed off — Alteration CO
CONVERSION OF THE EXISTING TWO-STORY ONE-FAMILY BUILDING WITH CELLAR INTO A TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OFOCCUPANCY.
Q00566451-S1
07/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/22/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/29/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
04/18/2022
Filed — Alteration CO
CONVERSION OF THE EXISTING TWO-STORY ONE-FAMILY BUILDING WITH CELLAR INTO A TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OFOCCUPANCY.
Q00566451-P2
04/14/2022
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/14/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
01/10/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/10/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2021
Filed — Alteration CO
CONVERSION OF THE EXISTING TWO-STORY ONE-FAMILY BUILDING WITH CELLAR INTO A TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OFOCCUPANCY.
Q00566451-P1
12/06/2021
Permit issued — Plumbing
Q00566451-S1-PL
12/03/2021
Permit issued — General Construction
Q00566451-I1-GC-CX
12/02/2021
Filed — Alteration CO
CONVERSION OF THE EXISTING TWO-STORY ONE-FAMILY BUILDING WITH CELLAR INTO A TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OFOCCUPANCY.
Q00566451-S1
11/24/2021
Objection raised — Accessibility
11/24/2021
Objection resolved — Addressed
11/17/2021
Objection raised — Zoning
11/17/2021
Objection resolved — Addressed
11/17/2021
Objection raised — Scope
11/17/2021
Objection resolved — Addressed
11/03/2021
Filed — Alteration CO
CONVERSION OF THE EXISTING TWO-STORY ONE-FAMILY BUILDING WITH CELLAR INTO A TWO-FAMILY BUILDING AS SHOWN ON THE PLANS. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OFOCCUPANCY.
Q00566451-I1
12/30/2005
Violation issued (ECB, closed)
Zoning
05/24/1997
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI12/06/2021
DOB NOWGeneral ConstructionPermit IssuedS.GOOLCHARAN CONSTRUCTION12/03/2021
1 project · most recent 04/18/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/18/2022Permit IssuedS.GOOLCHARAN CONSTRUCTIONAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-18MSPH230VO 36,000 BTU · Condensing Unit ×6
Heating
Cooper & Hunter CH-18MSPH230VO 36,000 BTU · Heat Pump Outdoor ×6
Ventilation
Delta Breeze SMT150 150 CFM · Exhaust Fan ×4
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×4
1 project · most recent 04/18/2022
Gas Water/Sanitary
FiledStatusContractorScope
04/18/2022Signed-offSUPERIOR PLUMBING & HEATIGas, Water/Sanitary
1 project · most recent 11/30/2021
General Wiring
FiledStatusContractorScope
11/30/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/10/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2022Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/23/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/10/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
04/29/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/29/2022Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
04/29/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
04/29/2022Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/29/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/29/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/29/2022Heating SystemsCHRISTIAN LOZADAspecial
04/29/2022Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
04/29/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/29/2022Mechanical SystemsCHRISTIAN LOZADAspecial
04/29/2022FinalCHRISTIAN LOZADAprogress
04/29/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
04/29/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/29/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
04/29/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/29/2022Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
04/29/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/29/2022MeteringCHRISTIAN LOZADAenergy_progress
04/29/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/29/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/29/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
04/14/2022Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
04/14/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/14/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/14/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
Latest 25 of 54.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00566451-P2Request digital key ↗
08/26/2026Q00566451-P1Request digital key ↗
08/26/2026Q00566451-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00566451-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026Q00566451-P2Open ↗
08/31/2026Q00566451-P2Open ↗
08/30/2026Q00566451-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q00566451-P2Open ↗
08/30/2026Q00566451-I1Open ↗
08/28/2026Q00566451-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00566451-I1Open ↗
08/26/2026Q00566451-P2Open ↗
08/26/2026Q00566451-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00566451-P2Open ↗
08/13/2026Q00566451-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00566451-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00566451-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00566451-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00566451-P2Open ↗
08/26/2026Q00566451-P1Open ↗
08/26/2026Q00566451-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00566451-S1Open ↗
08/13/2026Q00566451-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/26/2026Q00566451-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00566451-I1Open ↗