← Back
One family attached or semi-detached
116-42 VAN WYCK EXPRESSWAY
QUEENS · South Ozone Park · BIN 4252982
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R3-2Zoning
1,156 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,610 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1 filing · 6 docs
Floor 13p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR103/31/2025
TABRIZ GROUP ENTERPRISES205/27/2021
TABRIZ DESIGN GROUP102/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281103/31/2025
TABRIZ GROUP ENTERPRISES3275305/27/2021
TRIANGLE INSPECTION & TES7495102/05/2021
Building Lifecycle
All (29)Filed (4)Permit Issued (3)Signed Off (1)Violation (1)Inspection (4)Special Inspection (16)
04/07/2025
Permit issued — Solar
Q01203459-I1-SL
03/31/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 25 Panels, 10.25 kW
Q01203459-I1
03/31/2025
Special inspection requirement — Final
Mina Makar
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
03/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
03/31/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2022
Signed off — Alteration
DRYWELL INSTALLATION IN CONJUNCTION WITH GARAGE LEGALIZATION
Q00464781-I1
02/09/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/16/2021
Permit issued — Plumbing
Q00464781-I1-PL
07/20/2021
Permit issued — General Construction
Q00483884-I1-GC-CX
06/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
06/04/2021
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
06/04/2021
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
06/04/2021
Special inspection requirement — Final
BAKHTIAR SHAMLOO
05/27/2021
Filed — New Building
Q00483884-P1
05/27/2021
Special inspection requirement — Final
BAKHTIAR SHAMLOO
05/27/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
05/27/2021
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
05/27/2021
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
03/12/2021
Filed — New Building
Q00483884-I1
02/05/2021
Filed — Alteration
DRYWELL INSTALLATION IN CONJUNCTION WITH GARAGE LEGALIZATION
Q00464781-I1
02/03/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/03/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
02/03/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
01/04/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR04/07/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING11/16/2021
DOB NOWGeneral ConstructionPermit IssuedKAIETEUR CONSTRUCTION INC07/20/2021
1 project · most recent 03/31/2025
FiledStatusContractorScope
03/31/2025CompleteISLAND ELECTRIC CORP—
1 project · most recent 03/31/2025
FiledStatusContractorScope
03/31/2025Permit IssuedMOMENTUM SOLAR25 panels, 10.25 kw, 448 roof_area_sqft
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/09/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/07/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/31/2025FinalMina Makarprogress
03/31/2025Fire-Resistant Penetrations and JointsMina Makarspecial
03/31/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
03/31/2025Air barrier - visual inspectionMina Makarenergy_progress
03/31/2025Energy Code Compliance InspectionsMina Makarprogress
06/04/2021Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
06/04/2021Footing and FoundationBAKHTIAR SHAMLOOprogress
06/04/2021MeteringBAKHTIAR SHAMLOOenergy_progress
06/04/2021FinalBAKHTIAR SHAMLOOprogress
05/27/2021FinalBAKHTIAR SHAMLOOprogress
05/27/2021Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
05/27/2021Footing and FoundationBAKHTIAR SHAMLOOprogress
05/27/2021MeteringBAKHTIAR SHAMLOOenergy_progress
02/03/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/03/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/03/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
08/27/2026Q00483884-I1Request digital key ↗
08/27/2026Q00483884-P1Request digital key ↗
08/20/2026Q01203459-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00464781-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION5
04/05/2022421959125Open ↗
07/15/2021421959125Open ↗
04/01/2021421959125Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00483884-I1Open ↗
08/13/2026Q00483884-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00483884-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01203459-I1Open ↗
08/28/2026Q00483884-I1Open ↗
08/27/2026Q00483884-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01203459-I1Open ↗
09/01/2026Q01203459-I1Open ↗
08/28/2026Q00483884-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00464781-I1Open ↗
08/27/2026Q00483884-P1Open ↗
08/27/2026Q00483884-I1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00483884-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00483884-P1Open ↗
08/13/2026Q00483884-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00483884-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01203459-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/08/2021421959125Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00483884-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/08/2021421959125Open ↗
02/08/2021421959125Open ↗
02/08/2021421959125Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/08/2021421959125Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00464781-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00464781-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
04/01/2021421959125Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
04/01/2021421959125Open ↗
▸BISBOROUGH INTAKE FORM1
04/01/2021421959125Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00483884-I1Open ↗
08/13/2026Q00483884-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00483884-I1Open ↗