BuildNYC
Office with commercial, 7-19 stories
116 EAST 27TH STREET
MANHATTAN · Gramercy · BIN 1018157
💬 Discuss this project
1915Year Built
12Stories
O6Building Class
C4-5AZoning
70,217 sfGross Floor Area
14Units
LL97 Covered2 Active Violations 1 unresolved · 1 paperwork only 3 likely answered 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: 116 Associates/440 Realty Co · 6,584 sf lot · 10.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCamber, Garcia's New YorkUnder Construction13p · 3 filings · 20 docs
Floor 11Samco Properties1p · 1 filing · 3 docs
Floor 10CamberUnder Construction22p · 2 filings · 20 docs
Floor 9Samco Properties44p · 1 filing · 20 docs
Floor 8
Floor 7
Floor 6
Floor 5Bleecker Street Media2p · 1 filing · 3 docs
Floor 4Samco Properties46p · 4 filings · 20 docs
Floor 3
Floor 2
Floor 1Garcia's New YorkUnder Construction41p · 1 filing · 20 docs
MezzanineGarcia's New YorkUnder Construction34p · 1 filing · 20 docs
CellarGarcia's New YorkUnder Construction44p · 1 filing · 20 docs
Site & exteriorProposed temporary pipe scaffold installationUnder Construction1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Samco Properties5909/13/2026
116 Associate3403/21/2026
432 Park South Realty Co303/21/2026
Park Avenue Plaza Owner203/21/2026
116 Associates/440 Realty103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates603/21/2026
Codegreen1503/21/2026
Municipal Building Consultants103/21/2026
Myles Architecture P C403/21/2026
Skyline Access103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arista Electricspecialty_contractor1107/08/2026
Triple Crown Plumbing & HeatingPlumbing607/08/2026
Skyland DevelopmentGeneral Contractor204/09/2026
Delta Power ElectricalElectrical103/21/2026
Ariana ContractingFire Protection106/02/2026
Ariana ContractingPlumbing106/02/2026
Bypass MechanicalPlumbing107/08/2026
Phoenix Sutton STRScaffold109/17/2026
Abco Drywall and Ceilingsspecialty_contractor104/09/2026
Empire EcsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD Engineering9859206/03/2026
Milrose Consultants20031004/27/2026
Myles Architecture2938304/21/2026
Simon Schwartz, P.E2598204/09/2026
Building Lifecycle
All (172)Filed (30)Permit Issued (23)Signed Off (7)Facade (FISP) (14)Violation (60)Inspection (6)Objection (2)Special Inspection (30)
09/16/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01460133-I1
09/16/2026
Permit issued — Supported Scaffold
M01460133-I1-SF
07/14/2026
Signed off — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-S4
06/08/2026
Special inspection requirement — Sprinkler Systems
Zhao Deng
06/08/2026
Special inspection requirement — Maintenance information
Zhao Deng
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
06/08/2026
Special inspection requirement — Permanent certificate
Zhao Deng
06/03/2026
Filed — Alteration
SUBSEQUENT FILING OF PL AND SP. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01019646-P5
05/04/2026
Special inspection requirement — Sprinkler Systems
Zhao Deng
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Zhao Deng
05/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Zhao Deng
05/04/2026
Special inspection requirement — Maintenance information
Zhao Deng
05/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Zhao Deng
05/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Zhao Deng
05/04/2026
Special inspection requirement — Permanent certificate
Zhao Deng
04/30/2026
Filed — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-P1
04/29/2026
Permit issued — Structural
M01330320-S4-ST
04/27/2026
Filed — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-S4
04/22/2026
Special inspection requirement — Lighting controls
Kyu Ho Lee
04/22/2026
Special inspection requirement — Exterior lighting power
Kyu Ho Lee
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kyu Ho Lee
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Kyu Ho Lee
04/22/2026
Special inspection requirement — Interior lighting power
Kyu Ho Lee
04/21/2026
Filed — Alteration
SUBSEQUENT FILING OF PL AND SP. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01019646-P3
04/16/2026
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
04/16/2026
Special inspection requirement — Final
Christopher Drutjons
04/16/2026
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
04/16/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Christopher Drutjons
04/09/2026
Filed — Alteration
SUBSEQUENT FILING OF PL AND SP. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01019646-P4
03/31/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
03/25/2026
Permit issued — General Construction
M01019646-I1-GC
03/20/2026
Special inspection requirement — Permanent certificate
Simon Schwartz
03/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Simon Schwartz
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Simon Schwartz
03/20/2026
Special inspection requirement — Sprinkler Systems
Simon Schwartz
03/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
Simon Schwartz
03/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Simon Schwartz
03/20/2026
Special inspection requirement — Maintenance information
Simon Schwartz
03/09/2026
Permit issued — Plumbing
M01330320-S2-PL
03/06/2026
Permit issued — General Construction
M01330320-I1-GC
03/06/2026
Permit issued — Mechanical Systems
M01330320-S1-MS
02/10/2026
Permit issued — Sprinklers
M01019646-S2-PL
02/10/2026
Permit issued — Plumbing
M01019646-S2-EW-SP
01/27/2026
Objection resolved — Addressed
01/25/2026
Objection raised — Scope
01/12/2026
Filed — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-S2
01/12/2026
Filed — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-I1
01/12/2026
Filed — Alteration
INSTALLATION OF SPLIT AIR SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01330320-S1
12/29/2025
Signed off — Alteration
M01280431-I1
11/21/2025
Permit issued — General Construction
M01280431-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/30/2025
Permit issued — General Construction
M01289157-I1-GC
10/22/2025
Filed — Alteration
GENERAL CONSTRUCTION MODIFICATIONS FOR INTERIOR DEMOLITION ON THE 10TH FLOOR, AS PERPLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M01289157-S1
10/22/2025
Filed — Alteration
GENERAL CONSTRUCTION MODIFICATIONS FOR INTERIOR DEMOLITION ON THE 10TH FLOOR, AS PERPLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M01289157-I1
10/03/2025
Filed — Alteration
M01280431-I1
03/26/2025
Permit issued — General Construction
M01019646-I1-GC
02/26/2025
Permit issued — Suspended Scaffold
M01185779-I1-SC
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedPhoenix Sutton STR09/16/2026
DOB NOWStructuralSigned-offArista Electric04/29/2026
DOB NOWGeneral ConstructionPermit IssuedMidcity03/25/2026
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating03/09/2026
DOB NOWGeneral ConstructionPermit IssuedArista Electric03/06/2026
DOB NOWMechanical SystemsPermit IssuedArista Electric03/06/2026
DOB NOWPlumbingPermit IssuedAriana Contracting02/10/2026
DOB NOWSprinklersPermit IssuedAriana Contracting02/10/2026
DOB NOWGeneral ConstructionSigned-offAbco Drywall Ceilings11/21/2025
DOB NOWGeneral ConstructionSigned-offArista Electric10/30/2025
DOB NOWGeneral ConstructionPermit IssuedMidcity03/26/2025
DOB NOWSuspended ScaffoldPermit IssuedSkyline Restoration02/26/2025
DOB NOWGeneral ConstructionPermit IssuedEmpire Ecs07/24/2024
DOB NOWPlumbingPermit IssuedTriple Crown Plumbing & Heating03/26/2024
DOB NOWPlumbingPermit IssuedTriple Crown Plumbing & Heating02/07/2024
DOB NOWPlumbingPermit IssuedBypass Mechanical11/29/2023
DOB NOWMechanical SystemsSigned-offArista Electric02/07/2023
DOB NOWGeneral ConstructionPermit IssuedArista Electric02/07/2023
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating11/14/2022
DOB NOWMechanical SystemsSigned-offArista Electric11/11/2022
DOB NOWGeneral ConstructionSigned-offArista Electric10/06/2022
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating09/28/2022
DOB NOWPlumbingSigned-offTriple Crown Plumbing & Heating08/28/2020
BIS—ISSUEDSkyland Development07/07/2025
BISOTISSUEDArista Electric08/13/2020
BISOTISSUEDC C Controlled Combustion12/21/2018
BISFSISSUEDC C Controlled Combustion07/18/2018
BISPLISSUEDCC Controlled Plumbing Co07/12/2018
BISOTISSUEDC C Controlled Combustion07/12/2018
BISPLISSUEDTriple Crown Plumbing & Heating11/21/2016
BISOTISSUEDArista Electric11/15/2016
BISMHISSUEDArista Electric11/15/2016
BISMHISSUEDArista Electric09/19/2016
BISOTISSUEDArista Electric09/19/2016
BISEQISSUEDArista Electric09/19/2016
BISOTISSUEDA.rodriguez Cons06/10/2016
BISOTISSUEDA.rodriguez Cons04/18/2016
BISOTISSUEDA.rodriguez Cons12/16/2015
BISEQISSUEDEverest Scaffolding11/23/2015
BISPLISSUEDTriple Crown Plumbing & Heating10/20/2015
+ 33 more permits on file
2 projects · most recent 06/03/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Permit IssuedSkyland DevelopmentHeating and Air Conditioning Systems, Ventilation Systems
Ventilation
04/30/2026Signed-offArista ElectricAir Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P48NMAU-E4 1,306 CFM · Vrf Indoor ×3
PEFY-P48NMHU-E2 1,342 CFM · Vrf Indoor ×1
PUHY-EP192TSNU-A1 (MODULE #1 - PUHY-EP96TNU-A1, MODULE #2 - PUHY-EP96TNU-A1) 192,000 BTU · Vrf Outdoor ×1
PVFY-P48NAMU-E1 1,400 CFM · Vrf Indoor ×1
1 project · most recent 06/03/2026
Sprinkler System
FiledStatusContractorScope
06/03/2026Permit IssuedAriana ContractingSprinkler System
3 projects · most recent 06/03/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/03/2026Permit IssuedAriana ContractingGas, Water/Sanitary
04/30/2026Signed-offTriple Crown Plumbing & HeatingWater/Sanitary
02/22/2024Permit IssuedTriple Crown Plumbing & HeatingWater/Sanitary
3 projects · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026Permit IssuedDelta Power ElectricalGeneral Wiring
12/04/2024Permit IssuedDelta Power Electrical—
07/26/2024Permit IssuedDuro Electrical Contng—
1 project · most recent 04/30/2026
Steel
FiledStatusContractorScope
04/30/2026Signed-offArista ElectricSteel
1 project · most recent 09/16/2026
Scaffold
FiledStatusContractorScope
09/16/2026Permit IssuedPhoenix Sutton STRScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
06/08/2026Permanent certificateZhao Dengenergy_progress
06/08/2026HVAC-R and service water heating equipmentZhao Dengenergy_progress
06/08/2026Sprinkler SystemsZhao Dengspecial
06/08/2026Energy Code Compliance InspectionsZhao Dengprogress
06/08/2026HVAC-R and service water piping design and insulationZhao Dengenergy_progress
06/08/2026Maintenance informationZhao Dengenergy_progress
06/08/2026HVAC-R and service water heating system controlsZhao Dengenergy_progress
05/04/2026Sprinkler SystemsZhao Dengspecial
05/04/2026Maintenance informationZhao Dengenergy_progress
05/04/2026Permanent certificateZhao Dengenergy_progress
05/04/2026HVAC-R and service water piping design and insulationZhao Dengenergy_progress
05/04/2026HVAC-R and service water heating equipmentZhao Dengenergy_progress
05/04/2026HVAC-R and service water heating system controlsZhao Dengenergy_progress
05/04/2026Energy Code Compliance InspectionsZhao Dengprogress
04/22/2026Fire-Resistance Rated ConstructionKyu Ho Leeprogress
04/22/2026Exterior lighting powerKyu Ho Leeenergy_progress
04/22/2026Interior lighting powerKyu Ho Leeenergy_progress
04/22/2026Lighting controlsKyu Ho Leeenergy_progress
04/22/2026Fire-Resistant Penetrations and JointsKyu Ho Leespecial
04/16/2026FinalChristopher Drutjonsprogress
04/16/2026Structural Steel - WeldingChristopher Drutjonsspecial
04/16/2026Structural Steel - High Strength BoltingChristopher Drutjonsspecial
04/16/2026Structural Steel - DetailsChristopher Drutjonsspecial
03/20/2026Permanent certificateSimon Schwartzenergy_progress
03/20/2026Maintenance informationSimon Schwartzenergy_progress
Latest 25 of 111.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CamberOfficeFloor 10, Roof
Project M01330320 Alteration · Permit Entire · 01/12/2026
Bleecker Street MediaOfficeFloor 5
Project M01280431 Alteration · LOC Issued · 10/03/2025
Garcia's New YorkRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project M01019646 Alteration · Permit Entire · 05/07/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 500 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch31
10/13/2026M01460133-I1Request digital key ↗
09/02/2026M00770650-I1Request digital key ↗
09/01/2026M00796131-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00383631-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION38
01/23/2025101430836Open ↗
04/23/2024101430836Open ↗
04/19/2024101430836Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION35
07/08/2025101430836Open ↗
08/13/2020140937798Open ↗
12/21/2018140823081Open ↗
Showing 3 of 35 on file for this type
▸Seals & Professional Certifications171
▸DOB NOWProgress Inspector Seal & Signature38
10/03/2026M01019646-P4Open ↗
10/03/2026M01019646-P4Open ↗
09/29/2026M01019646-P3Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
08/28/2019123475907Open ↗
07/12/2018123475907Open ↗
05/09/2018122875326Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/18/2026M01460133-I1Open ↗
09/02/2026M00770650-I1Open ↗
09/01/2026M00796131-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
10/03/2026M01019646-P4Open ↗
09/29/2026M01019646-P3Open ↗
09/23/2026M01330320-S1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
07/12/2018123475907Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
07/12/2018123475907Open ↗
11/18/2016122923710Open ↗
09/29/2016122875326Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
06/08/2016140504247Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
06/08/2016140504247Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment26
▸BISEQUIPMENT USE PERMITS10
05/10/2018122875326Open ↗
10/11/2017122923710Open ↗
10/06/2017122923710Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
05/10/2018122875326Open ↗
10/06/2017122923710Open ↗
09/22/2017122512192Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
07/12/2019101430836Open ↗
06/13/2019123472508Open ↗
01/24/2018103193401Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/12/2018123475907Open ↗
11/18/2016122923710Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/12/2018123475907Open ↗
Showing 1 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
12/21/2015122512192Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/02/2026M00770650-I1Open ↗
09/01/2026M00796131-I1Open ↗
09/01/2026M00770642-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
08/08/2018123472508Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
08/28/2019123475907Open ↗
07/12/2018123475907Open ↗
05/09/2018122875326Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/30/2021140937798Open ↗
08/28/2019123475907Open ↗
05/09/2018122875326Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
06/08/2016140504247Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/18/2018140823081Open ↗
06/08/2016140504247Open ↗
12/15/2015140441038Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
07/30/2021140937798Open ↗
08/13/2020140937798Open ↗
08/12/2020140937798Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
07/30/2021140937798Open ↗
08/28/2019123475907Open ↗
06/13/2019123472508Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
04/23/2024101430836Open ↗
07/12/2019101430836Open ↗
05/03/2019101430836Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/08/2025101430836Open ↗
08/28/2019123475907Open ↗
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/24/2026M01185779-I1Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT36
07/30/2021140937798Open ↗
08/12/2020140937798Open ↗
08/28/2019123475907Open ↗
Showing 3 of 36 on file for this type
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET14
08/08/2018123472508Open ↗
07/12/2018123475907Open ↗
02/28/2017123034322Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM12
08/28/2019123475907Open ↗
07/12/2019101430836Open ↗
06/21/2019101430836Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION8
03/19/2025101430836Open ↗
08/22/2019123475907Open ↗
07/26/2019101430836Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
08/12/2020140937798Open ↗
12/18/2018140823081Open ↗
06/08/2016140504247Open ↗
Showing 3 of 7 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
10/11/2017122923710Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01185779-I1Open ↗