← Back
Public elementary, junior or senior high
Evergreen Middle School for Urban Exploration
116 ELDERT STREET · BIN 3079027
💬 Discuss this project
1960Year Built
3Stories
W1Building Class
R6Zoning
166,626 sfGross Floor Area
0Units
LL97 Covered24 Open Violations 13 unresolved · 11 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 120,000 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof21p · 1 filing · 20 docs
Floor 39p · 1 filing · 20 docs
Floor 237p · 2 filings · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar17p · 1 filing · 20 docs
2 jobs · most recent 10/17/2025
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/17/2025——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin CAH006GDGC 2,000 CFM ×2
DAHA11A 2,000 CFM ×2
CAH021GDAM 10,000 CFM · Ahu ×1
CAH032GDCM 12,000 CFM ×1
CAH050GDCC 19,000 CFM ×1
DAHA09A 1,500 CFM · Erv ×1
DAHA19A 3,000 CFM ×1
FCVS104 266 CFM · Fan Coil Indoor ×35
Jetson ACCM030FDD21 1,786,100 BTU · Chiller ×3
Airedale UVV050BBMECBNN266 750 CFM · Fan Coil Indoor ×97
UVV060BBMECBNN266 1,000 CFM · Fan Coil Indoor ×60
UVV030BBMECBNN266 500 CFM · Fan Coil Indoor ×15
UVV040BBMECBNN266 600 CFM · Fan Coil Indoor ×4
Ventilation
Greenheck GB-098 350 CFM · Exhaust Fan ×5
GB-097 100 CFM · Exhaust Fan ×4
GB-220 4,000 CFM · Kitchen Exhaust ×3
GB-160 1,370 CFM · Exhaust Fan ×2
CUBE-200 3,600 CFM · Kitchen Exhaust ×1
GB-100 620 CFM · Exhaust Fan ×1
SQ-70-VG 50 CFM · Exhaust Fan ×1
USF-12-F3 1,900 CFM · Exhaust Fan ×1
USF-30-A1 9,000 CFM · Exhaust Fan ×1
USF-30-B4 11,000 CFM · Exhaust Fan ×1
USF-36-B4 13,800 CFM · Exhaust Fan ×1
Cooling
Daikin FTKF09AXVJU 11,200 BTU · Fan Coil Indoor ×3
FTXV36AVJU9 34,400 BTU · Fan Coil Indoor ×3
RKF09AXVJU 11,200 BTU · Condensing Unit ×3
RXV36AVJU9 34,400 BTU · Condensing Unit ×3
FTKF24AXVJU 26,400 BTU · Fan Coil Indoor ×2
RKF24AXVJU 2 tons · Condensing Unit ×2
FTXV18AVJU9 22 BTU · Fan Coil Indoor ×1
RXT18AVJU9 21,600 BTU · Vrf Outdoor ×1
03/01/2024Permit IssuedGRIDSPAN CORPORATIONAir Conditioning Systems, Ventilation Systems
Cooling
Fujitsu (2) x FUJITSU AOU60RLAVM (10) x FUJITSU ASUB18TLAV1 10 tons · Vrf Outdoor ×30
Ventilation
Greenheck BDF-80 300 CFM · Exhaust Fan ×6
2 jobs · most recent 10/17/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/17/2025——Gas, Storm, Water/Sanitary
03/01/2024Permit IssuedDH EAGLE PLBG & HTG INCWater/Sanitary
13 jobs · most recent 12/30/2025
General Wiring
FiledStatusContractorScope
12/30/2025Permit IssuedA.T.J. ELECTRICAL CO.INC.General Wiring
08/19/2024CompleteCHARAN ELEC'L ENTERP'S IN—
08/16/2024CompleteMETROPOLIS ELECTRIC CORPGeneral Wiring
10/04/2023CompleteACE ELEC'L CONSTRUCTIONGeneral Wiring
07/19/2023Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
03/01/2023CompleteGEMINI ELECTRIC CO., INC.—
03/31/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/24/2021CompleteCHARAN ELEC'L ENTERP'S IN—
06/08/2021CompleteINLIGHT ELECTRICAL CORPGeneral Wiring
03/20/2020CompleteCHARAN ELEC'L ENTERP'S IN—
04/30/2019CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
04/15/2019CompleteMK ELECTRIC CONTR'S, INCGeneral Wiring
10/11/2018Permit IssuedELECTRIC FIXX INCGeneral Wiring
1 job · most recent 10/17/2025
Steel Concrete
FiledStatusContractorScope
10/17/2025——Steel, Concrete
Building Lifecycle
All (146)Filed (19)Permit Issued (9)Signed Off (3)Violation (60)Inspection (3)Objection (22)Special Inspection (30)
07/13/2026
Objection resolved — Open
07/13/2026
Objection resolved — Open
07/13/2026
Objection resolved — Open
07/13/2026
Objection resolved — Open
07/13/2026
Objection resolved — Open
07/13/2026
Objection resolved — Open
07/09/2026
Objection resolved — Resolved
04/23/2026
Objection resolved — Addressed
03/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
11/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Objection raised — Other
10/27/2025
Objection raised — Other
10/27/2025
Objection raised — Other
10/27/2025
Objection raised — Other
10/17/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S4
10/17/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S5
10/15/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S7
10/15/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S6
10/15/2025
Special inspection requirement — Post-installed Anchors
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/25/2025
Violation issued (FDNY_ORDER, closed)
09/24/2025
Objection raised — Other
09/24/2025
Objection raised — Other
09/24/2025
Objection raised — Other
09/24/2025
Objection raised — Other
09/08/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S1
09/08/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-I1
09/08/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S2
09/08/2025
Filed — Alteration
Installation of concrete pit and epoxy floor patching in building cellar. Installation of roof dunnage for mechanical equipment. Provide new openings in roof slab. Rebuilding of parapet with new guardrail. Window lintels. Excavation for transformer vault.
B01272557-S3
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/05/2025
Special inspection requirement — Post-installed Anchors
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/05/2025
Special inspection requirement — Masonry
08/28/2025
Violation issued (FDNY_ORDER, closed)
08/28/2025
Violation issued (FDNY_ORDER, closed)
08/28/2025
Violation issued (FDNY_ORDER, closed)
08/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/24/2025
Special inspection requirement — Post-installed Anchors
08/18/2025
Special inspection requirement — Mechanical Systems
08/18/2025
Special inspection requirement — Final
08/18/2025
Special inspection requirement — Final
08/18/2025
Special inspection requirement — Structural Steel - Welding
08/18/2025
Special inspection requirement — Post-installed Anchors
08/18/2025
Special inspection requirement — Structural Steel - Details
08/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/18/2025
Special inspection requirement — Sprayed fire-resistant materials
08/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
06/05/2025
Violation issued (ECB, open)
Construction
05/08/2025
Violation issued (ECB, open)
Construction
05/08/2025
Violation issued (ECB, open)
Construction
05/08/2025
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 146 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY2207/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DOE IS 296 040303/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
DOE I.S. 296503/22/2026
NYC DOE 0103/22/2026
D.O.E. I.S. 296 0103/22/2026
JHS 296 DOE103/22/2026
DEPT OF EDUCATION IS 296103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREENMAN-PEDERSEN, INC.710/17/2025
SUSAN G. DOBAN109/08/2025
EME CONSULTING ENGINEERING GROUP803/01/2024
DSENY ENGINEERING SERVICES, PC102/04/2022
ARUP206/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRIDSPAN CORPORATIONGeneral Contractor1203/21/2026
FRANCIS RICHARDSElectrical603/21/2026
J-TRACK, LLCGeneral Contractor603/21/2026
SPIRO SINANISElectrical503/21/2026
METROPOLIS ELECTRIC CORP 003482General Contractor403/22/2026
WMP PLUMBING LLCPlumbing207/08/2026
JEFFREY SOCOLElectrical203/21/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
MAGRIPLES JAMESElectrical103/21/2026
REMIGIUSZ ZUBERElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
ACE ELECL CONSTRUCTION 003978General Contractor103/22/2026
DH EAGLE PLBG & HTG INCPlumbing107/08/2026
LUPINSKI, MAREKElectrical103/21/2026
ANDREW DRAZICElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
C.FALCO ELETL CONT CORPElectrical103/22/2026
CHAYUT, ALLENElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
JAMES MAGRIPLESElectrical103/21/2026
ACE ELEC'L CONSTRUCTIONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351803/01/2024
UNIVERSAL TESTING AND INS400206/14/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGRIDSPAN CORPORATION01/10/2024
DOB NOWGeneral ConstructionPermit IssuedGRIDSPAN CORPORATION01/10/2024
DOB NOWPlumbingPermit IssuedL.SPINA PLUMB & HTG INC08/30/2023
DOB NOWGeneral ConstructionPermit IssuedGRIDSPAN CORPORATION05/17/2023
DOB NOWMechanical SystemsPermit IssuedGRIDSPAN CORPORATION05/17/2023
DOB NOWConstruction FenceSigned-offJ-TRACK, LLC02/14/2022
DOB NOWPlumbingSigned-offWMP PLUMBING LLC12/30/2021
DOB NOWPlumbingSigned-offWMP PLUMBING LLC11/10/2021
DOB NOWGeneral ConstructionSigned-offJ-TRACK, LLC10/29/2021
BISOTISSUEDLIU ELECTRIC LLC12/08/2017
BISOTISSUEDLIU ELECTRIC LLC03/17/2017
BISOTISSUEDKG CONSTRUCTION SERVICES05/10/2013
BISOTISSUEDKG CONSTRUCTION SERVICES05/10/2013
BISOTISSUEDR.A.M.S. MECHANICAL INC03/13/2013
BISMHISSUEDR.A.M.S. MECHANICAL INC03/13/2013
BISOTISSUEDR.A.M.S. MECHANICAL INC02/07/2013
BISMHISSUEDR.A.M.S. MECHANICAL INC02/07/2013
BISPLISSUEDMAR-SAL PLBG & HTG, INC09/04/2012
BISOTISSUEDKG CONSTRUCTION SERVICES08/14/2012
BISOTISSUEDKG CONSTRUCTION SERVICES08/14/2012
BISOTISSUEDR.A.M.S. MECHANICAL INC03/20/2012
BISMHISSUEDR.A.M.S. MECHANICAL INC03/20/2012
BISOTISSUEDR.A.M.S. MECHANICAL INC03/05/2012
BISMHISSUEDR.A.M.S. MECHANICAL INC03/05/2012
BISOTISSUEDR.A.M.S. MECHANICAL INC09/22/2011
BISMHISSUEDR.A.M.S. MECHANICAL INC09/22/2011
BISPLISSUEDLAFATA CORALLO P & H INC09/22/2011
BISOTISSUEDEDISON ELECTRICAL CORPORATION11/15/2007
BISEQISSUEDEDISON ELECTRICAL CONTRACTORS11/14/2007
BISOTISSUEDVOLMAR SERVICES08/15/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP05/01/2001
BISOTISSUEDDECENT ENTERPRISES08/02/2000
BISEQISSUEDSAFWAY STEEL PRODUCTS INC07/03/2000
BISOTISSUEDDECENT ENTERPRISES06/23/2000
BISEQISSUEDSAFWAY STEEL PRODUCTS06/06/2000
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/24/1998
BISEQISSUEDM&S MASONRY CONTRACTORS01/16/1998
BISPLISSUEDFRANCO BELLI PLUMBING AND HEATIN08/20/1997
BISEQISSUEDSHERIDAN INTERNATIONAL ENTERPRIS04/05/1994
BISOTISSUEDSHERIDAN INTERNATIONAL ENTERPRIS11/12/1993
+ 1 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/08/2022Pass-Final Fence Non-Directive 14PassView ↗
07/29/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/28/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
03/26/2026Subsurface Conditions – Fill Placement & In-Place Density—special
11/18/2025Fire-Resistance Rated Construction—progress
10/15/2025Post-installed Anchors—special
10/15/2025Fire-Resistant Penetrations and Joints—special
09/05/2025Fire-Resistant Penetrations and Joints—special
09/05/2025Structural Stability – Alterations of existing buildings—special
09/05/2025Masonry—special
09/05/2025Post-installed Anchors—special
08/24/2025Post-installed Anchors—special
08/24/2025Fire-Resistant Penetrations and Joints—special
08/18/2025Structural Stability – Alterations of existing buildings—special
08/18/2025Structural Steel - High Strength Bolting—special
08/18/2025Final—progress
08/18/2025Sprayed fire-resistant materials—special
08/18/2025Final—progress
08/18/2025Mechanical Systems—special
08/18/2025Structural Steel - Welding—special
08/18/2025Post-installed Anchors—special
08/18/2025Structural Steel - Details—special
04/18/2024Post-installed AnchorsAsma Hashmispecial
04/18/2024Energy Code Compliance InspectionsAsma Hashmiprogress
04/18/2024FinalAsma Hashmiprogress
04/18/2024Fire-Resistance Rated ConstructionAsma Hashmiprogress
04/18/2024Post-installed AnchorsAsma Hashmispecial
04/18/2024Mechanical SystemsAsma Hashmispecial
Latest 25 of 67.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026B00520703-I1Request digital key ↗
09/01/2026B00520611-I1Request digital key ↗
08/31/2026B00595919-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature30
09/02/2026B08031763-S1Open ↗
09/01/2026B08031763-I1Open ↗
09/01/2026B08031763-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026B00595919-I1Open ↗
08/27/2026B08031763-S1Open ↗
08/27/2026B08031763-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026B08031763-S1Open ↗
09/02/2026B08031763-S1Open ↗
09/01/2026B08031763-I1Open ↗
Showing 3 of 18 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B08031763-P1Open ↗
08/27/2026B08031763-P4Open ↗
08/27/2026B08031763-P3Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs42
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/31/2026B00595919-I1Open ↗
08/27/2026B08031763-P1Open ↗
08/27/2026B08031763-P4Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/27/2026B08031763-P1Open ↗
08/27/2026B08031763-P4Open ↗
08/27/2026B08031763-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/13/2026B01272557-S3Open ↗
08/13/2026B01272557-S1Open ↗
08/13/2026B01272557-S2Open ↗
Showing 3 of 7 on file for this type
▸Other Documents18
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal17
08/27/2026B08031763-P2Open ↗
08/27/2026B08031763-P1Open ↗
08/27/2026B08031763-P4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026B01272557-I1Open ↗