116 HARTFORD AVENUE
STATEN ISLAND · BIN 5007972
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R2Zoning
1,422 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,452 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Drywell installation3p · 2 filings · 14 docs
Site & exteriorDrywell installation3p · 2 filings · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect208/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Capital Contracting P&HPlumbing107/08/2026
R&M Piping & HeatingPlumbing107/08/2026
Jade Construction & ContractingGeneral Contractor108/27/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738208/13/2021
Building Lifecycle
10/22/2021
Signed off — Alteration
RELOCATE 1-KITCHEN SINK AND 1-GAS STOVE ON THE FIRST FLOOR AND INSTALLATION OF DRYWELLS FOR THE STORM WATER RUN-OFF FOR THE ADDITIONAL ROOF AREA.
S00275819-I1
08/13/2021
Filed — Alteration
RELOCATE 1-KITCHEN SINK AND 1-GAS STOVE ON THE FIRST FLOOR AND INSTALLATION OF DRYWELLS FOR THE STORM WATER RUN-OFF FOR THE ADDITIONAL ROOF AREA.
S00275819-P1
08/13/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
08/13/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
08/13/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCapital Contracting P&H09/14/2020
DOB NOWPlumbingSigned-offR&M Piping & Heating03/03/2020
BISOTISSUEDJade Construction & Contracting08/27/2020
BIS—ISSUEDN/A03/17/2020
1 project · most recent 05/30/2021
General Wiring
FiledStatusContractorScope
05/30/2021CompleteStellmann ElectricalGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/13/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
08/13/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
07/12/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
07/12/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
07/12/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
63 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account