| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/03/2026 | Permit Issued | A. TOBIN INTERIORS INC | Heating and Air Conditioning Systems | Heat / Cool |
| 04/10/2026 | Permit Issued | HOME AIR INC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×1 Trane TPVFYP012AM141A 12,000 BTU · Vrf Indoor ×1 |
| 03/24/2026 | Signed-off | JS REALTY DEVELOPMENT LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric n/a 24,000 BTU · Fan Coil Indoor ×94 N/A 18,000 BTU · Fan Coil Indoor ×2 PUZ-A24NHA7 775 CFM · Ductwork ×2 TUHYE0963AN41AN 24,000 BTU · Vrf Outdoor ×2 Heat / Cool Mitsubishi Electric NTXMSM48A182BA 48,000 BTU · Condensing Unit ×12 MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×8 MXZ-SM36NAM 36,000 BTU · Condensing Unit ×4 TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×2 TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×2 Ventilation Mitsubishi Electric n/a 440 CFM ×8 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2026 | Signed-off | E.M.P. FIRE SPRINKLER LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | CROSSFIELD PLBG.&HTG | Water/Sanitary |
| 03/24/2026 | Signed-off | ZAPAS CONSTRUCTION CORP | Gas, Storm, Water/Sanitary |
| 01/15/2020 | Permit Issued | ADVANCED P,MECH & SPR COR | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/19/2026 | Complete | BLUE SEAGULL ELECTRICAL | General Wiring |
| 05/19/2026 | Complete | ETECH ELECTRICAL LLC | General Wiring |
| 03/12/2026 | Permit Issued | INTELOGIC ELECTRIC, INC. | General Wiring |
| 10/28/2025 | Complete | ETECH ELECTRICAL LLC | General Wiring |
| 10/21/2025 | Complete | BLUE SEAGULL ELECTRICAL | General Wiring |
| 04/02/2024 | Complete | KJK ELECTRIC INC | — |
| 09/14/2023 | Permit Issued | SHELBY ELECTRICAL CORP | General Wiring |
| 03/10/2023 | Permit Issued | ILLUMINOUS ELECTRIC CORP. | General Wiring |
| 01/30/2023 | Complete | SHELBY ELECTRICAL CORP | — |
| 09/07/2022 | Cancelled | RGF ELECTRIC CORP | — |
| 05/17/2018 | Complete | ANTHONY G FERRY INC | Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | CROSSFIELD PLBG.&HTG | 1 scope_items |
| 03/24/2026 | Permit Issued | JS REALTY DEVELOPMENT LLC | Steel, Concrete |
| 03/17/2022 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Permit Issued | CROSSFIELD PLBG.&HTG | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/17/2025 | Permit Issued | SAFECORE DEVELOPERS LLC | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| SD BUILDERS CONSTRUCTION | 138 | 09/22/2026 |
| PLATINUM SERVICES NY | 17 | 08/11/2026 |
| STRUCTURAL PRESERVATION SYSTEM | 8 | 07/08/2026 |
| SASCO CONSTRUCTION SVC | 18 | 07/08/2026 |
| SAFECORE DEVELOPERS | 8 | 04/09/2026 |
| 118 WEST 13TH STREET OWNER LLC | 3 | 03/22/2026 |
| ECA DEVELOPERS | 6 | 03/22/2026 |
| QUEST CONTRACTING | 1 | 03/22/2026 |
| NEW SCHOOL UNIVERSITY | 18 | 03/22/2026 |
| OWNER OF 118 W 13 ST | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/09/2021 | $22.9M | — | — → — | $801/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| ALL HANDS ARCHITECTURE PLLC | 7 | 07/10/2026 |
| DESIMONE CONSULTING ENGINEERING | 1 | 07/07/2026 |
| 1+1 DESIGN STUDIO LLC | 1 | 04/10/2026 |
| BKSK ARCHITECTS, LLP | 9 | 03/24/2026 |
| EP ENGINEERING LLC | 8 | 01/09/2026 |
| PRISE CONSTRUCTION MANAGEMENT | 2 | 11/17/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 01/24/2025 |
| THE H ARCHITECTS LLC | 2 | 12/05/2024 |
| ASR ENGINEERING PC | 4 | 05/30/2024 |
| THORNTON TOMASETTI | 5 | 09/28/2023 |
| ASHRAF CORP | 3 | 06/29/2023 |
| H & O ENGINEERING, DPC | 2 | 02/14/2023 |
| KPFF CONSULTING ENGINEERS | 1 | 03/28/2022 |
| POLISE CONSULTING ENGINEERS DPC | 4 | 01/15/2020 |
| JOEL PHAGOO P.E. PLLC | 1 | 05/21/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| BMB BUILDING CONSULTING | 10 | 03/21/2026 |
| PRISTINE GUTTERS | 4 | 03/21/2026 |
| ADVANCED BUILDERS SERVICES | 4 | 03/21/2026 |
| JM ZONING, LLC. | 56 | 03/21/2026 |
| PLATINUM SERVICES NY | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| THE ORGANIC GARDENER NYC* | General Contractor | 50 | 07/08/2026 |
| ECA DEVELOPERS LLC | General Contractor | 21 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 12 | 08/11/2026 |
| SASCO CONSTRUCTION SVCE L | General Contractor | 10 | 09/22/2026 |
| TRI CONTRACTING INC | General Contractor | 7 | 07/08/2026 |
| E.M.P. FIRE SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| PACIFIC PLBG. & HTG. CORP | Fire Protection | 2 | 07/08/2026 |
| JS REALTY DEVELOPMENT LLC | General Contractor | 2 | 04/09/2026 |
| A. TOBIN INTERIORS INC | General Contractor | 2 | 07/09/2026 |
| ROCKLEDGE SCAFFOLD CORP | General Contractor | 2 | 03/21/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 2 | 07/08/2026 |
| DYNATEC CONTRACTING INC | General Contractor | 2 | 03/21/2026 |
| ZAPAS CONSTRUCTION CORP | Plumbing | 2 | 07/08/2026 |
| GARDEN STATE CONSTRUCTION | General Contractor | 1 | 04/09/2026 |
| THEODOROS MAPPAS | Electrical | 1 | 03/21/2026 |
| VALERY TSIRULNIK | Electrical | 1 | 03/21/2026 |
| AUROUS CONSTRUCTION COLL* | General Contractor | 1 | 04/09/2026 |
| E M P FIRE SPRINKLER | General Contractor | 1 | 04/09/2026 |
| JEONG YUNG | Electrical | 1 | 03/21/2026 |
| HOME AIR INC | General Contractor | 1 | 07/08/2026 |
| ADVANCED PLUMBING MECH | Plumbing | 1 | 07/08/2026 |
| CROSSFIELD PLBG.&HTG | Plumbing | 1 | 06/28/2026 |
| P.S.I. MECHANICAL | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| GEIGER ENGINEERING. PC | 689 | 1 | 07/07/2026 |
| 1+1 DESIGN STUDIO LLC | 1039 | 1 | 04/10/2026 |
| BIG APPLE GROUP NY A RMA | 9168 | 22 | 03/24/2026 |
| WKC ENGINEERING, P.C. | 9718 | 3 | 02/11/2026 |
| CTHREE ARCHITECTURE + DES | 1124 | 3 | 02/11/2026 |
| WELLDONE INSPECTION INC. | 8628 | 1 | 02/11/2026 |
| PRISE CONSTRUCTION MANAGE | 9248 | 2 | 11/17/2025 |
| NAPACH ARCHITECTU | 2945 | 1 | 01/15/2020 |
| KLINE ENGINEERING, PC | 1007 | 2 | 01/10/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | SASCO CONSTRUCTION SVCE L | 09/21/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 08/10/2026 |
| DOB NOW | General Construction | Permit Issued | A. TOBIN INTERIORS INC | 07/07/2026 |
| DOB NOW | Structural | Permit Issued | A. TOBIN INTERIORS INC | 06/29/2026 |
| DOB NOW | Plumbing | Permit Issued | P.S.I. MECHANICAL | 05/28/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 05/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HOME AIR INC | 04/23/2026 |
| DOB NOW | Plumbing | Permit Issued | CROSSFIELD PLBG.&HTG | 03/13/2026 |
| DOB NOW | General Construction | Permit Issued | AUROUS CONSTRUCTION COLL* | 03/06/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 02/18/2026 |
| DOB NOW | Construction Fence | Signed-off | JS REALTY DEVELOPMENT LLC | 01/09/2026 |
| DOB NOW | General Construction | Permit Issued | JS REALTY DEVELOPMENT LLC | 01/09/2026 |
| DOB NOW | Standpipe | Signed-off | E.M.P. FIRE SPRINKLER LLC | 12/04/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SAFECORE DEVELOPERS LLC | 10/16/2025 |
| DOB NOW | General Construction | Permit Issued | THE ORGANIC GARDENER NYC* | 09/11/2025 |
| DOB NOW | General Construction | Permit Issued | THE ORGANIC GARDENER NYC* | 07/01/2025 |
| DOB NOW | Construction Fence | Signed-off | THE ORGANIC GARDENER NYC* | 07/01/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SAFECORE DEVELOPERS LLC | 04/30/2025 |
| DOB NOW | Construction Fence | Signed-off | THE ORGANIC GARDENER NYC* | 03/27/2025 |
| DOB NOW | General Construction | Permit Issued | THE ORGANIC GARDENER NYC* | 03/27/2025 |
| DOB NOW | Structural | Signed-off | THE ORGANIC GARDENER NYC* | 03/27/2025 |
| DOB NOW | Supported Scaffold | Signed-off | SASCO CONSTRUCTION SVCE L | 03/26/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 02/18/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | PHOENIX SUTTON STR, INC | 01/31/2025 |
| DOB NOW | General Construction | Signed-off | THE ORGANIC GARDENER NYC* | 11/06/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SASCO CONSTRUCTION SVCE L | 10/08/2024 |
| DOB NOW | Standpipe | Signed-off | ZAPAS CONSTRUCTION CORP | 10/03/2024 |
| DOB NOW | Plumbing | Signed-off | E.M.P. FIRE SPRINKLER LLC | 08/29/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | CONSTRUCTED CORP | 08/28/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | CONSTRUCTED CORP | 08/15/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SASCO CONSTRUCTION SVCE L | 07/15/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SASCO CONSTRUCTION SVCE L | 07/15/2024 |
| DOB NOW | Structural | Signed-off | THE ORGANIC GARDENER NYC* | 05/29/2024 |
| DOB NOW | General Construction | Permit Issued | THE ORGANIC GARDENER NYC* | 05/29/2024 |
| DOB NOW | Construction Fence | Signed-off | THE ORGANIC GARDENER NYC* | 05/29/2024 |
| DOB NOW | Construction Fence | Signed-off | THE ORGANIC GARDENER NYC* | 05/28/2024 |
| DOB NOW | Structural | Signed-off | THE ORGANIC GARDENER NYC* | 05/28/2024 |
| DOB NOW | General Construction | Permit Issued | THE ORGANIC GARDENER NYC* | 04/23/2024 |
| DOB NOW | Standpipe | Signed-off | PACIFIC PLBG. & HTG. CORP | 03/20/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | PLATINUM SERVICES NY LLC | 03/07/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/10/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/08/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/17/2025 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 03/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/07/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 03/07/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 02/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/31/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 01/09/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 05/24/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 10/19/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/19/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/24/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/17/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/17/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/23/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 06/23/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Final | Benjamin Carr | progress |
| 07/07/2026 | Masonry | FADY HABEEL | special |
| 07/06/2026 | Final | FADY HABEEL | progress |
| 05/22/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/22/2026 | Post-installed Anchors | — | special |
| 05/22/2026 | Final | — | progress |
| 05/22/2026 | Mechanical Systems | — | special |
| 05/22/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/22/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/22/2026 | Maintenance information | — | energy_progress |
| 05/22/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 04/01/2026 | Post-installed Anchors | Hung Pui Ho | special |
| 04/01/2026 | Fire-Resistant Penetrations and Joints | Hung Pui Ho | special |
| 03/31/2026 | Fire-Resistance Rated Construction | Soorjbally Harilall | progress |
| 03/31/2026 | Sprayed fire-resistant materials | SOORJBALLY HARILALL | special |
| 03/31/2026 | Wall Panels, Curtain Walls, and Veneers | SOORJBALLY HARILALL | special |
| 03/31/2026 | Mastic and Intumescent Fire-resistant Coatings | SOORJBALLY HARILALL | special |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | SOORJBALLY HARILALL | special |
| 03/31/2026 | Masonry | SOORJBALLY HARILALL | special |
| 03/24/2026 | Wall Panels, Curtain Walls, and Veneers | SOORJBALLY HARILALL | special |
| 03/24/2026 | Fire-Resistant Penetrations and Joints | SOORJBALLY HARILALL | special |
| 03/24/2026 | Masonry | SOORJBALLY HARILALL | special |
| 03/24/2026 | Mastic and Intumescent Fire-resistant Coatings | SOORJBALLY HARILALL | special |
| 03/24/2026 | Sprayed fire-resistant materials | SOORJBALLY HARILALL | special |
| 03/24/2026 | Fire-Resistance Rated Construction | Soorjbally Harilall | progress |