← Back
Two family brick
116 WINDSOR PLACE
BROOKLYN · BIN 3027196
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5BZoning
2,060 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 3,340 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 20 docs
Floor 36p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 1Under Construction14p · 6 filings · 20 docs
CellarUnder Construction8p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZUN PROSPECT 2285007/08/2026
RAGNAROK CONSULTING SERVICES1307/08/2026
LEE COMPANY103/22/2026
RAGNAROK MANAGING AGENCY, LLC.203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP1705/27/2025
PROSPECT ENGINEERING P.C101/06/2023
KHUSAIBI DESIGN SOLUTIONS411/29/2022
LUCID BUILDING ENGINEERING P.C.111/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAGNAROK CONSULTANTS803/21/2026
M-DIS DESIGN GROUP1803/21/2026
BMB BUILDING CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEE & COMPANY OF NY, INCGeneral Contractor507/08/2026
PETER PLUMBING ASSOC. INC.Plumbing407/08/2026
CEDARS CONSTRUCTION CORPGeneral Contractor407/08/2026
SEUNG YOEL SEOGeneral Contractor303/21/2026
UNITECH DESIGN INCGeneral Contractor203/21/2026
ARCO PLBG AND HTG INCPlumbing106/27/2026
KATAN P & H INCPlumbing106/28/2026
ASKO ELEC CONST & MAIN INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC26651705/27/2025
PROSPECT ENGINEERING P.C.2775101/06/2023
DOYUN KIM; RA7415107/25/2021
Building Lifecycle
All (121)Filed (23)Permit Issued (14)Signed Off (10)Violation (3)Inspection (15)Objection (26)Special Inspection (30)
05/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2026
Permit issued — Plumbing
B00563372-I1-PL
04/17/2026
Signed off — Alteration
B00542606-I1
12/30/2025
Permit issued — General Construction
B01206992-I1-GC
12/08/2025
Objection resolved — Addressed
09/29/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Scope
09/16/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Zoning
06/06/2025
Objection raised — Zoning
05/27/2025
Filed — Alteration CO
APPLICATION FILING TO OBTAIN NEW CERTIFICATE OF OCCUPANCY (C OF O) FOR 3-STORY MIXED-USE BUILDING AS PLANS SHOWN
B01206992-I1
04/10/2025
Special inspection requirement — Permanent certificate
INHWAN CHANG
04/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
08/10/2023
Signed off — Alteration
HEREWITH FILE TO INSTALL A TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM THE PROPERTY LINE) FOR GROCERY STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08040276-I1
07/05/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-I1
07/03/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/29/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-S3
06/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/28/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-S2
06/28/2023
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-S1
06/14/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2023
Signed off — Alteration
HEREWITH FILE TO INSTALL A TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM THE PROPERTY LINE) FOR GROCERY STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08040276-S1
06/05/2023
Signed off — Alteration
HEREWITH FILE TO INSTALL A TEMPORARY CONSTRUCTION FENCE (WITHIN 3'-0" FROM THE PROPERTY LINE) FOR GROCERY STORE STORE-FRONT MODIFICATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08040276-S2
06/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
06/01/2023
Special inspection requirement — Heating Systems
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
06/01/2023
Special inspection requirement — Heating Systems
INHWAN CHANG
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
06/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/30/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-P6
05/30/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-P7
05/30/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/30/2023
Special inspection requirement — Heating Systems
INHWAN CHANG
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/30/2023
Special inspection requirement — Heating Systems
INHWAN CHANG
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
05/22/2023
Permit issued — Boiler Equipment
B08046636-S3-BE
05/19/2023
Permit issued — Construction Fence
B08040276-S2-FN
05/15/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-S3
05/15/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3 FLOOR. WORK INCLUDES INSTALLATION OF COMBI. CONDENSING H.W. BOILER WITH ASSOCIATED PIPING, AND FIRE-STOPPING IS PROVIDED. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B08046636-P5
05/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
05/04/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
05/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARCO PLBG AND HTG INC04/21/2026
DOB NOWGeneral ConstructionPermit IssuedLEE & COMPANY OF NY, INC12/30/2025
DOB NOWBoiler EquipmentSigned-offPETER PLUMBING ASSOC. INC.05/22/2023
DOB NOWConstruction FenceSigned-offLEE & COMPANY OF NY, INC05/19/2023
DOB NOWPlumbingSigned-offPETER PLUMBING ASSOC. INC.03/07/2023
DOB NOWBoiler EquipmentSigned-offPETER PLUMBING ASSOC. INC.03/07/2023
DOB NOWStructuralSigned-offSEUNG YOEL SEO03/06/2023
DOB NOWGeneral ConstructionSigned-offUNITECH DESIGN INC01/20/2023
DOB NOWGeneral ConstructionSigned-offLEE & COMPANY OF NY, INC01/04/2023
DOB NOWPlumbingSigned-offPETER PLUMBING ASSOC. INC.12/28/2022
DOB NOWGeneral ConstructionSigned-offLEE & COMPANY OF NY, INC11/15/2022
DOB NOWMechanical SystemsPermit IssuedCEDARS CONSTRUCTION GROUP08/09/2022
DOB NOWPlumbingPermit IssuedKATAN P & H INC05/04/2022
DOB NOWGeneral ConstructionSigned-offCEDARS CONSTRUCTION GROUP12/02/2021
BIS—ISSUEDLEE & COMPANY OF NY, INC04/21/2023
BISOTISSUEDLEE & COMPANY OF NY, INC04/17/2023
BISOTISSUEDLEE & COMPANY OF NY, INC04/17/2023
BIS—RE-ISSUEDLEE & COMPANY OF NY, INC04/17/2023
BISOTISSUEDLEE & COMPANY OF NY, INC04/03/2023
BISOTISSUEDMOT NEW YORK INC03/19/2019
BISOTISSUEDKORMAN DESIGN & BUILD09/23/2015
BISEQISSUEDKORMAN DESIGN & BUILD09/16/2015
BIS—ISSUEDBERGER SIGN FABRICATION INC.02/27/1992
BISOTISSUEDJEREZ CONSTRUCTION INC.09/13/1991
BISMHISSUEDJEREZ CONSTRUCTION INC.07/31/1991
1 project · most recent 07/25/2021
Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/25/2021Permit IssuedCEDARS CONSTRUCTION CORPOthers, Ventilation Systems
Ventilation
Captiveaire 5424 ND-2D-PSP-F 1,850 CFM · Kitchen Exhaust ×2
A1-E-362-15d 1,575 CFM · Makeup Air ×1
Other
Captiveaire DU85HFA 1,820 CFM · Exhaust Fan ×1
1 project · most recent 11/29/2022
Water/Sanitary
FiledStatusContractorScope
11/29/2022Permit IssuedAPPROVED PLUMBING AND FIRWater/Sanitary
5 projects · most recent 06/09/2023
General Wiring Lighting
FiledStatusContractorScope
06/09/2023CompleteASKO ELEC CONST & MAIN INGeneral Wiring
06/01/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
12/19/2022CompleteY.S ELECTRICGeneral Wiring, Lighting
05/06/2022CompleteBDS ELECTRIC CORP.General Wiring, Lighting
03/21/2019CompleteDELTA POWER ELECTRICALGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/14/2023Fail-Final General Construction Non-Directive 14FailView ↗
06/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/04/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/10/2025Permanent certificateINHWAN CHANGenergy_progress
04/10/2025Tenant Protection Plan ComplianceINHWAN CHANGspecial
04/07/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
04/07/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
06/01/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/01/2023Heating SystemsINHWAN CHANGspecial
06/01/2023HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
06/01/2023HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
06/01/2023HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
06/01/2023Heating SystemsINHWAN CHANGspecial
06/01/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/01/2023HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
06/01/2023HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
06/01/2023HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
05/30/2023HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
05/30/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/30/2023Heating SystemsINHWAN CHANGspecial
05/30/2023HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
05/30/2023HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
05/30/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/30/2023Heating SystemsINHWAN CHANGspecial
05/30/2023HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
05/30/2023HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
05/30/2023HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
05/09/2023Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
Latest 25 of 48.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/01/2026B00542606-I1Request digital key ↗
09/01/2026B00563281-I1Request digital key ↗
08/28/2026B08033739-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION17
07/11/2023300113865Open ↗
07/06/2023321152783Open ↗
07/06/2023321935251Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION8
04/24/2023300150798Open ↗
04/24/2023300113865Open ↗
04/24/2023321152783Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
11/19/2019321935251Open ↗
11/19/2019321935251Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01206992-I1Open ↗
08/13/2026B01206992-P1Open ↗
▸Seals & Professional Certifications78
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/01/2026B00542606-I1Open ↗
08/28/2026B08033739-I1Open ↗
08/28/2026B08046636-P7Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026B08046636-S2Open ↗
09/23/2026B08046636-S2Open ↗
09/23/2026B08046636-S3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/23/2026B08046636-S3Open ↗
09/23/2026B08046636-S3Open ↗
09/23/2026B08046636-S2Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/20/2019321935251Open ↗
09/18/2015321152783Open ↗
09/18/2015321152783Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/20/2019321935251Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/20/2019321935251Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/26/2015321152783Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B01206992-P1Open ↗
08/13/2026B01206992-I1Open ↗
▸BISTenant Protection Plan and Notes1
03/20/2019321935251Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/01/2026B00542606-I1Open ↗
08/28/2026B08033739-I1Open ↗
08/28/2026B08046636-P7Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2015321152783Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/20/2019321935251Open ↗
09/18/2015321152783Open ↗
09/18/2015321152783Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00542606-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/05/2023300119636Open ↗
01/05/2023300119636Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/06/2023300119636Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSUPERSEDING LETTER8
04/24/2023300150798Open ↗
04/24/2023300150798Open ↗
04/24/2023300113865Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/23/2023300119636Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/26/2015321152783Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/20/2019321935251Open ↗
06/26/2015321152783Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/21/2019321935251Open ↗
06/26/2015321152783Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/21/2026B01206992-P1Open ↗
08/21/2026B01206992-I1Open ↗