← Back
BuildNYC
Public elementary, junior or senior high
1160 DECATUR STREET
BROOKLYN · BIN 3079714
💬 Discuss this project
1973Year Built
1Stories
W1Building Class
R6Zoning
9,760 sfGross Floor Area
1Units
5 Active Violations 0 unresolved · 5 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 13,330 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority1303/21/2026
NYC Department of Education103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PS&S310/08/2025
Paulus, Sokolowski, & Sartor (PS&S)107/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Charan Electrical Enterp'sElectrical103/22/2026
A & S ElectricElectrical103/21/2026
Building Lifecycle
All (51)Filed (4)Violation (27)Objection (6)Special Inspection (14)
05/06/2026
Reissue:35719728H failure to maintain building in code-compliant manner.illuminated for exits,exit discharges and public corridors emergencylights…
ECB violation · open
04/07/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Special inspection requirement — Deep Foundation Elements
03/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/13/2026
Special inspection requirement — Subgrade Inspections
03/12/2026
Objection resolved — Addressed
10/17/2025
Objection raised — Other
10/08/2025
Filed — Alteration
K842 Subsequent filing of plumbing work type. Removal and replacement of roof, roof area drains and associated piping
B01239299-S4
10/03/2025
Special inspection requirement — Footing and Foundation
10/03/2025
Special inspection requirement — Structural Steel - Details
10/03/2025
Special inspection requirement — Structural Steel - Welding
10/03/2025
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
10/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/03/2025
Special inspection requirement — Final
10/03/2025
Special inspection requirement — Concrete - Cast-In-Place
07/17/2025
Objection raised — Other
07/17/2025
Objection raised — Admin
07/03/2025
Filed — Alteration
K842 Subsequent filing of plumbing work type. Removal and replacement of roof, roof area drains and associated piping
B01239299-S2
07/03/2025
Filed — Alteration
K842 Subsequent filing of plumbing work type. Removal and replacement of roof, roof area drains and associated piping
B01239299-I1
07/03/2025
Filed — Alteration
K842 Subsequent filing of plumbing work type. Removal and replacement of roof, roof area drains and associated piping
B01239299-S3
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
07/02/2025
Special inspection requirement — Masonry
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2025
Special inspection requirement — Insulation placement and R values
05/08/2025
Reissue#35677281H failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors per bc…
ECB violation · open
05/22/2024
Reissued ECB #35672881J. Failure to maintain building in code-compliant manner: at time of inspection observe dexit door 4 and 6 not…
ECB violation · closed
05/22/2024
Reissued ECB #35672886H. Failure to maintain building in code-compliant manner: at time of inspection observed emergency not working properly when…
ECB violation · open
03/16/2023
Failure to maintain building in code-compliant manner.noted:smoke door by exit 4 & 6 not sorking properly.remedy:repair and/or replace.
ECB violation · closed
03/16/2023
Reissue#35643368P noted:at the main entrance to the building by the kitchen entrance by room 108,and inside rooms 102,108,and 111,the emergency…
ECB violation · open
04/28/2022
Failure to maintain bldg in codecompliant manner:illumination for exits,exit discharges&public corridors per BC1006.1;27-381 noted:observed@main…
ECB violation · open
04/28/2022
Failure to maintain bldg in codecompliant manner.noted:observed@EXP1 playgrnd next to EXIT4 large sinkhole 4'X3'&3"-4" deep causing trip hazard…
ECB violation · closed
03/09/2018
Failure to maintain bldg in code complaint manner. Lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1;27-542.…
ECB violation · closed
03/09/2018
Exit door not self closing. Noted: exit door next to gas meter room has defective,the screw hole for the top hinge is loose & the door not close…
ECB violation · closed
03/09/2018
Failure to maintain bldg in code complaint manner. Noted: at gas meter room & electrical room,illegal storage of materials such as table,cleaning…
ECB violation · closed
05/20/2014
Failure to maintain exterior. 2" trip hazard at entry gate to school. Remedy: repair trip hazard.
ECB violation · closed
04/22/2013
Stop cracks in concrete block wall in room 101 near exit doors. Rmdy: repair walls.
ECB violation · closed
04/22/2013
Reissue 34839104J heater in 110 not working. Rmdy: repair or replace heater.
ECB violation · closed
04/12/2012
Concrete block wall has a crack appx 4'ft long located in room 101 btrm rem; repair and/or replace concrete block wall
ECB violation · closed
02/28/2011
Re: 34839104J. Failure to provide adequate heating system for classrooms 108 & 117. Radiator heating units defective, inoperable. Remedy: provide…
ECB violation · closed
03/24/2010
Defective heating system room 110, 108 remedy: make repairs
ECB violation · closed
06/12/2008
Reissue 34569392X vertical crack in the wall located at rooms 101 & 102 adjacent to the bathroom, outside of room 111 next to door frame. Remedy:…
ECB violation · closed
04/19/2007
Vertical crack in the wall located at rooms 101 & 102 adj to the bathroom,outside of room 111 next to the door frame. Remedy:repair cracked wall.
ECB violation · closed
01/25/2006
Re-issue #34474367M. Front of court yard adjacent to kindergarten ROOM101 asphalt pavement is cracking & sinking approx 6 inches at several…
ECB violation · closed
03/29/2005
Reissue #34440493H. Significant displacement, settling and cracking ofaphalt & concrete surfaces of courtyard. At front of school. Remedy:repair…
ECB violation · closed
06/11/2004
Failure to maintain.defect is school yard asphalt surface is crack and uneven.remedy:repair yard
ECB violation · closed
06/12/2003
Failure to maintain. Noted defect: exit doors and associated metal jambs, rotted, corroded, loose, detacled from building allowing elements into…
ECB violation · closed
03/25/2003
Failure to maintain.defects are.bathroom in class rooms #108&109 roof leaks.
ECB violation · closed
03/25/2003
Panic hardware inoperative.note;exits#3 & 6 doors panic hardware are broken & defective
ECB violation · closed
03/25/2003
Failure to maintain;efects are;exit #6 metal door & frame rotten & sagging making door unable to open.
ECB violation · closed
06/03/1999
Failure to maintain building interior. Noted no emergency lighting through out side school, no spinkler head system (fire) cracked beam wallsin…
ECB violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Varsity Plumbing and Heating—
BIS—Manley Construction—
BIS—Varsity Plumbing and Heating—
BIS—Axiom Plumbing & Heating—
BIS—Swing Staging—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01239299-I1Request the plans ↗
08/21/2026B01239299-S4Request the plans ↗
08/21/2026B01239299-S3Request the plans ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B01239299-S4Open ↗
08/13/2026B01239299-S3Open ↗
08/13/2026B01239299-S2Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026B01239299-S3Open ↗
08/13/2026B01239299-S4Open ↗
08/13/2026B01239299-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B01239299-S3Open ↗
08/13/2026B01239299-S2Open ↗
08/13/2026B01239299-S4Open ↗
Showing 3 of 4 on file for this type
▸Other Documents5
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal5
08/21/2026B01239299-I1Open ↗
08/13/2026B01239299-S2Open ↗
08/13/2026B01239299-S3Open ↗
Showing 3 of 5 on file for this type