LL97 Covered10 Open Violations 2 unresolved · 8 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 72,500 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
1 job · most recent 01/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
01/09/2026——Storm, Water/Sanitary
6 jobs · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/10/2023CompleteANCO ELECTL CONTCTNG INC—
03/04/2022CompleteSELECTRIC ELECL CONT CO IGeneral Wiring
02/14/2020CompleteCHARAN ELEC'L ENTERP'S IN—
01/31/2019CompleteCHARAN ELEC'L ENTERP'S IN—
06/19/2018CompleteCHARAN ELEC'L ENTERP'S IN—
2 jobs · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026——2 scope_items
01/09/2026——2 scope_items
2 jobs · most recent 08/09/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/09/2026Permit IssuedIBEX CONTRACTING INCScaffold
08/09/2026Permit IssuedIBEX CONTRACTING INCSidewalk Shed
Building Lifecycle
All (110)Filed (12)Permit Issued (5)Signed Off (2)Violation (60)Inspection (1)Objection (18)Special Inspection (12)
09/24/2026
Permit issued — Supported Scaffold
X01436293-I1-SF
09/24/2026
Permit issued — Construction Fence
X01436291-I1-FN
09/24/2026
Permit issued — Sidewalk Shed
X01436299-I1-SH
09/01/2026
Objection resolved — Addressed
08/27/2026
Objection raised — Other
08/19/2026
Filed — Alteration
Excavation in conjunction with X01340483 and X01436291
X01436751-I1
08/18/2026
Objection resolved — Resolved
08/18/2026
Objection resolved — Resolved
08/12/2026
Objection raised — Other
08/12/2026
Objection raised — Other
08/09/2026
Filed — Alteration
Sidewalk shed installation in conjunction with X01340483
X01436299-I1
08/09/2026
Filed — Alteration
X01436291-I1
08/09/2026
Filed — Alteration
PIpe scaffold installation in conjunction with X01340483
X01436293-I1
07/24/2026
Special inspection requirement — Post-installed Anchors
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
04/16/2026
Violation issued (ECB, open)
Construction
03/11/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/25/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
02/25/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
02/06/2026
Objection resolved — Addressed
02/06/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/22/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
01/22/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
01/16/2026
Objection raised — Admin
01/16/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/13/2026
Objection raised — Other
01/13/2026
Objection raised — Other
01/09/2026
Filed — Alteration
Waterproofing.
X01340483-S4
01/07/2026
Filed — Alteration
Waterproofing.
X01340483-S3
01/07/2026
Filed — Alteration
Waterproofing.
X01340483-I1
01/07/2026
Filed — Alteration
Waterproofing.
X01340483-S1
01/07/2026
Filed — Alteration
Waterproofing.
X01340483-S2
01/07/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
12/31/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
12/29/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/29/2025
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
09/30/2024
Violation issued (ECB, closed)
Construction
09/30/2024
Violation issued (ECB, open)
Construction
09/30/2024
Violation issued (ECB, open)
Construction
06/26/2023
Violation issued (ECB, closed)
Construction
08/10/2022
Signed off — Alteration
X00570015-I1
08/04/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 108X AT 1166 NEILL AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00569974-I1
07/20/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
06/27/2022
Violation issued (ECB, closed)
Construction
06/27/2022
Violation issued (ECB, closed)
Construction
10/13/2021
Permit issued — Support of Excavation
X00570015-I1-SE
09/17/2021
Violation issued (ECB, closed)
Construction
09/10/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 108X AT 1166 NEILL AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X00569974-P1
Latest 60 of 110 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
S 108 DEPT. OF EDUCATIO04203/22/2026
D.O.E. PS108 0403/22/2026
DEPARTMENT OF EDUCATION903/22/2026
DOE 040103/22/2026
DOE P.S. 108303/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
D.O.E. PS108 TRANSPORTAB0103/22/2026
DOE PS 108 040103/22/2026
PS.108 DOE503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AME SERVICES INC408/19/2026
SYSTRA101/09/2026
KERI ENGINEERING, P.C.201/07/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS101/07/2026
HARTLAND ENGINEERING, DPC101/07/2026
NYGB309/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES603/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IBEX CONTRACTING INCGeneral Contractor309/25/2026
PERFETTO ENTERPRISES CO IGeneral Contractor307/08/2026
CEDOMIR MARAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106401/09/2026
MP ENGINEERS & ARCHITECTS1438101/07/2026
TWIN PEAKS INC.317108/13/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedIBEX CONTRACTING INC09/24/2026
DOB NOWConstruction FencePermit IssuedIBEX CONTRACTING INC09/24/2026
DOB NOWSidewalk ShedPermit IssuedIBEX CONTRACTING INC09/24/2026
DOB NOWSupport of ExcavationSigned-offPERFETTO ENTERPRISES CO I10/13/2021
DOB NOWConstruction FenceSigned-offPERFETTO ENTERPRISES CO I09/10/2021
BISPLISSUEDEAGLE 1 MECHANICAL, INC09/02/2025
BISPLISSUEDVARSITY PLBG AND HTG INC07/21/2025
BISPLISSUEDEAGLE 1 MECHANICAL, INC07/07/2025
BISOTISSUEDNAVILLUS TILE INC04/08/2025
BISOTISSUEDNAVILLUS TILE INC04/08/2025
BISOTISSUEDNAVILLUS TILE INC04/08/2025
BISMHISSUEDNAVILLUS TILE INC03/31/2025
BISOTISSUEDNAVILLUS TILE INC03/31/2025
BISPLISSUEDEAGLE 1 MECHANICAL, INC09/03/2024
BISPLISSUEDEAGLE 1 MECHANICAL, INC09/03/2024
BISPLISSUEDVARSITY PLBG AND HTG INC07/24/2024
BISPLISSUEDEAGLE 1 MECHANICAL, INC07/09/2024
BISPLISSUEDFRANCO BELLI PLMG&HTG SON06/27/2024
BISPLISSUEDFRANCO BELLI PLMG&HTG SON06/27/2024
BISOTISSUEDNAVILLUS TILE INC06/26/2024
BISOTISSUEDNAVILLUS TILE INC06/26/2024
BISOTISSUEDNAVILLUS TILE INC06/26/2024
BISOTISSUEDNAVILLUS TILE INC06/26/2024
BISMHISSUEDNAVILLUS TILE INC06/26/2024
BISPLISSUEDEAGLE 1 MECHANICAL, INC09/06/2023
BISMHISSUEDR.A.M.S. MECHANICAL INC07/13/2023
BISOTISSUEDNAVILLUS TILE INC07/12/2023
BISOTISSUEDNAVILLUS TILE INC07/12/2023
BISOTISSUEDNAVILLUS TILE INC07/12/2023
BISPLISSUEDEAGLE 1 MECHANICAL, INC07/11/2023
BISPLISSUEDVARSITY PLBG AND HTG INC07/11/2023
BISMHISSUEDNAVILLUS TILE INC05/18/2023
BISOTISSUEDNAVILLUS TILE INC05/18/2023
BISOTISSUEDPERFETTO ENTERPRISES CO I03/24/2023
BISOTISSUEDPERFETTO ENTERPRISES CO I03/24/2023
BISPLISSUEDFRANCO BELLI PLMG&HTG SON03/23/2023
BISPLISSUEDFRANCO BELLI PLMG&HTG SON11/09/2022
BISPLISSUEDFRANCO BELLI PLMG&HTG SON10/13/2022
BISMHISSUEDNAVILLUS TILE INC09/07/2022
BISOTISSUEDNAVILLUS TILE INC09/07/2022
+ 15 more permits on file
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/20/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/24/2026Post-installed Anchors—special
02/25/2026Subgrade InspectionsGEORGE GHEBRYALspecial
02/25/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
01/22/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
01/22/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
01/22/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/07/2026FinalGEORGE GHEBRYALprogress
12/31/2025FinalGEORGE GHEBRYALprogress
12/29/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/29/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/29/2025MasonryGEORGE GHEBRYALspecial
12/29/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/25/2026X00570015-I1Request digital key ↗
08/25/2026X00569974-P1Request digital key ↗
08/20/2026X01436751-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/25/2026X00570015-I1Open ↗
08/25/2026X00569974-I1Open ↗
08/25/2026X00569974-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X01340483-S3Open ↗
09/01/2026X01340483-I1Open ↗
08/23/2026X01340483-S4Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X01340483-S3Open ↗
08/23/2026X01340483-S4Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026X00569974-P1Open ↗
08/13/2026X00569974-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/25/2026X00570015-I1Open ↗
08/25/2026X00569974-P1Open ↗
08/20/2026X01436751-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/20/2026X01436751-I1Open ↗
08/16/2026X01436293-I1Open ↗
08/16/2026X01436299-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026X00569974-I1Open ↗
08/13/2026X00570015-I1Open ↗
▸Other Documents16
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
08/20/2026X01436751-I1Open ↗
08/16/2026X01436293-I1Open ↗
08/16/2026X01436299-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X00569974-I1Open ↗
08/13/2026X00570015-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026X01340483-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00570015-I1Open ↗