ECB05/13/2026ATOI, OBSERVED WORK WITHOUT A PERMIT AT A 2-STORY BUILDING WHERE A VERTICAL EXTENSION CONSISTING OF TWO ADDITIONAL FLOORS HAD BEEN ADDED. DEPARTMENT RECORDS INDICATE NO STRUCTURAL OR CONSTRUCTION PERMITS ON FIL$3K due
ECB01/22/2026WORK WITHOUT PERMIT. ATOI, OBSERVED ACTIVE JOB # B01273180-S1-GC AT A 4-STORY BUILDING PERMITTED FOR EXTERIOR BRICK VENEER REPLACEMENT WITH NEW STUCCO FINISH. NOTED DEMOLITION WORK PERFORMED WITHOUT PERMIT: ENT$2K due
ECB01/22/2026PLUMBING WORK WITHOUT PERMIT, AT TIME OF INSPECTION, OBSERVED 4 STORY BUILDING CELLAR THOROUGH-OUT-OUT-OUT 4TH FLOOR NEW WASTE/WATER LINES, ROUGH IN KITCHEN SINKS, 3 PIECE BATHROOM, STAND UP SHOWER, WASHER AND$2K due
ECB01/22/2026FAILURE TO SAFEGUARD AT TIME OF INSPECTION, OBSERVED ACTIVE JOB # B01273180-S1-GC AT A 4-STORY BUILDING WHERE STAIRS THROUGHOUT THE CELLAR THROUGH THE 4TH FLOOR ARE MISSING REQUIRED HANDRAILS AND GUARDRAILS, ST$10K due
ECB01/22/2026. UNSAFE CONDITION. ATOI, OBSERVED 4 STORY BUILDING, ACTIVE JOB # B01273180-S1-GC TEMPORARY CONSTRUCTION SCAFFOLD ERECTED AT THE SITE WITH MISSING REQUIRED TOE BOARDS AND WOOD PLANKS NOT PROPERLY SECURED. THE C$5K due
ECB01/22/202601. WORK DOES NOT CONFORM TO APPROVED PLANS. ATOI, OBSERVED UNDER JOB # B01273180-GC, CELLAR, 1ST, AND 2ND FLOOR INTERIOR WORK THROUGHOUT, INCLUDING NEW PARTITION WALLS, NEWLY INSTALLED STEEL STAIRS, 1ST-FLOOR$5K due
ECB01/22/2026WORK WITHOUT PERMIT. AT TIME OF INSPECTION, OBSERVED ACTIVE JOB # B01273180-S1-GC AT A 2-STORY BUILDING WHERE VERTICAL EXTENSION, TWO ADDITIONAL FLOORS HAVE BEEN ADDED. NO STRUCTURAL/CONSTRUCTION PERMIT ON FILE$2K due
ECB01/22/2026. WORK WITHOUT PERMIT, AT TIME OF INSPECTION, OBSERVED 4 STORY BUILDING CELLAR THOROUGH-OUT 4TH FLOOR NEW ELECTRICAL WIRING, PANELS, LIGHT SWITCHES, WALL PLUGS, EXHAUST FANS. NO ELECTRICAL PERMIT ON FILE FOR SC$2K due
ECB06/23/2026AT TIME OF INSPECTION, OBSERVED WORK PERFORMED WHILE A FULL STOP WORK ORDER DATED 01/23/2026 WAS IN EFFECT. SPECIFICALLY, THE TEMPORARY 300PSF SIDEWALK SHED AT EXPOSURE 1 FRONT DEMOLISHED AND FULLY REMOVED WITHHearing held — result not yet published$10K proposed
ECB06/23/2026AT TIME OF INSPECTION, OBSERVED WORK PERFORMED WHILE A FULL STOP WORK ORDER DATED 01/23/2026 WAS IN EFFECT. SPECIFICALLY, THE PIPE SCAFFOLDING ERECTED EXPOSURE 1,FRONT 3, REAR &,4 RIGHT SIDE DEMOLISHED AND FULLHearing held — result not yet published$10K proposed
ECB06/23/2026AT TIME OF INSPECTION, OBSERVED WORK PERFORMED WHILE A FULL STOP WORK ORDER DATED 01/23/2026 WAS IN EFFECT. SPECIFICALLY, THE TEMPORARY CONSTRUCTION FENCE AT EXPOSURE 1 FRONT DEMOLISHED AND FULLY REMOVED WITHOUHearing held — result not yet published$10K proposed
ECB06/23/2026TAMPERED WITH REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED A POSTED STOP WORK ORDER PREVIOUSLY ISSUED ON 01/23/2026, PER DOB RECORDS, HAD BEEN REMOVED FROM THE CONSTRUCTIHearing held — result not yet published$5K proposed