← Back
BuildNYC
Two family converted from one family
1161 OCEAN PARKWAY
BROOKLYN · BIN 3171362
💬 Discuss this project
1950Year Built
1Stories
B3Building Class
R6AZoning
5,943 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family converted from one family · 6,000 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
Civil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
63-53 Fresh Pond RD703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Munyc Architecture212/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. General ContractorsGeneral Contractor203/21/2026
R S Plumbing & HeatingPlumbing103/21/2026
Building Lifecycle
03/12/2025
Elevator Category 1 inspection report filed
12/28/2022
Signed off — Alteration
REMOVE EXISTING CURB-CUT AND SPLAYS AND REPLACE WITH NEW SMALLER CURB-CUT AND CURBS. REPAIR ANY DAMAGED ASPHALT STREET PAVING
B00669446-I1
12/13/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/12/2022
Objection resolved — Addressed
12/05/2022
Objection raised — Other
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMNC General Contracting06/22/2022
BIS—ISSUEDM.N.C. General Contractors10/21/2021
BIS—ISSUEDM.N.C. General Contractors05/11/2021
BIS—ISSUEDM.N.C. General Contractors10/30/2020
BIS—ISSUEDM.N.C. General Contractors10/25/2020
BIS—RE-ISSUEDM.N.C. General Contractors10/15/2019
BIS—ISSUEDM.N.C. General Contractors07/25/2019
BISPLISSUEDR & S Plumbing & Heating04/09/2019
BIS—ISSUEDM.N.C. General Contractors07/31/2018
BISEQISSUEDM.N.C. General Contractors07/19/2018
BIS—ISSUEDM.N.C. General Contractors07/19/2018
2 projects · most recent 08/19/2021
General Wiring
FiledStatusContractorScope
08/19/2021CompleteDB ElectricGeneral Wiring
12/11/2019CompleteR.C.M. Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/13/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/21/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
137 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account