← Back
Office with commercial, 7-19 stories
1162 BROADWAY
MANHATTAN · BIN 1090657
💬 Discuss this project
2021Year Built
13Stories
O6Building Class
M1-8A/R12Zoning
26,993 sfGross Floor Area
13Units
LL97 Covered0 Open Violations
Office with commercial, 7-19 stories · Owner of record: 1162 BROADWAY LLC C/O · 2,475 sf lot · 10.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Roof5p · 3 filings · 15 docs
Bulkhead1p · 1 filing · 4 docs
Floor 121p · 1 filing · 10 docs
Floor 112p · 2 filings · 7 docs
Floor 101p · 1 filing · 10 docs
Floor 93p · 4 filings · 20 docs
Floor 82p · 2 filings · 20 docs
Floor 72p · 3 filings · 17 docs
Floor 6
Floor 53p · 4 filings · 19 docs
Floor 41p · 1 filing · 10 docs
Floor 32p · 3 filings · 17 docs
Floor 2
Floor 16p · 1 filing · 11 docs
Cellar4p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP3007/08/2026
JAY GROUP2607/08/2026
DORIA607/08/2026
1162 BROADWAY2403/22/2026
ON STAR MANAGEMENT1503/22/2026
ALBA SERVICES103/22/2026
1178 BROSDWAY HOLDINGS403/21/2026
1178 BROADWAY HOLDING403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2203/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
EXPEDITING 4 U203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor3907/08/2026
ON STAR MANAGEMENT LLCGeneral Contractor1007/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
BEST MECHANICAL SVCS INCPlumbing207/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
TFK ELECTRIC CORPElectrical103/22/2026
DORIA, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168402/13/2024
SKYLINE RIGGING7880205/31/2023
LEO Y LEE ASSOCIATES2481208/29/2022
AR-TECH ENGINEERING, P.C.6659203/29/2022
Building Lifecycle
All (141)Filed (21)Permit Issued (28)Signed Off (10)Violation (43)Inspection (1)Objection (18)Special Inspection (20)
09/25/2024
Signed off — Alteration
Proposed construction fence. No change to use, egress or occupancy under this application.
M00135311-I1
04/11/2024
Signed off — Alteration
INSTALLATION OF NEW EMERGENCY GENERATOR AND FUEL OIL STORGAE IN CONJUNCTION WITH NB #122013908.
M08021414-I1
03/20/2024
Filed — Alteration
Structural work type hereby filed subsequent to the Alt. GC application M01014181-I1
M01014181-S2
03/13/2024
Special inspection requirement — Final
03/13/2024
Special inspection requirement — Post-installed Anchors
03/13/2024
Special inspection requirement — Structural Steel - High Strength Bolting
03/13/2024
Special inspection requirement — Structural Steel - Welding
03/13/2024
Special inspection requirement — Structural Steel - Details
03/11/2024
Filed — Alteration
Structural work type hereby filed subsequent to the Alt. GC application M01014181-I1
M01014181-I1
03/04/2024
Permit issued — Boiler Equipment
M08021414-I1-BE
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/29/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SOORJBALLY HARILALL
02/26/2024
Objection resolved — Addressed
02/26/2024
Objection resolved — Addressed
02/22/2024
Objection raised — Inspections
02/22/2024
Objection raised — Admin
02/20/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PRESSURIZED STANDPIPE ALARM SYSTEM IN CONJUNCTION WITH NB# 122013908.
M00258406-I1
02/13/2024
Filed — Alteration
INSTALLATION OF NEW EMERGENCY GENERATOR AND FUEL OIL STORGAE IN CONJUNCTION WITH NB #122013908.
M08021414-P1
02/13/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
SOORJBALLY HARILALL
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/09/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/16/2024
Permit issued — Standpipe
M00258406-I1-EW-SD
01/10/2024
Signed off — Alteration
M00489055-I1
01/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00489049-I1
01/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00489046-I1
01/10/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00489043-I1
01/10/2024
Signed off — Alteration
M00489059-I1
09/29/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M00876972-I1
08/03/2023
Signed off — Alteration
M00504098-I1
06/28/2023
Permit issued — Protection and Mechanical Methods
M00504098-I1-PM
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2023
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
05/31/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M00876972-P1
05/31/2023
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
05/18/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLDS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION.
M00876972-I1
05/18/2023
Permit issued — Protection and Mechanical Methods
M00876972-I1-PMM
04/17/2023
Violation issued (ECB, closed)
Construction
03/21/2023
Permit issued — Construction Fence
M00135311-I1-FN
03/20/2023
Permit issued — Sidewalk Shed
M00489043-I1-SH
03/14/2023
Permit issued — Protection and Mechanical Methods
M00489055-I1-PM
03/14/2023
Permit issued — Supported Scaffold
M00489046-I1-SF
03/14/2023
Permit issued — Protection and Mechanical Methods
M00489059-I1-PM
01/05/2023
Permit issued — Standpipe
M00258406-I1-EW-SD
11/03/2022
Permit issued — Boiler Equipment
M08021414-I1-BE
10/26/2022
Objection raised — Scope
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Fire_Protection
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Energy
10/26/2022
Objection resolved — Addressed
10/20/2022
Filed — Alteration
INSTALLATION OF NEW EMERGENCY GENERATOR AND FUEL OIL STORGAE IN CONJUNCTION WITH NB #122013908.
M08021414-I1
09/23/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00489046-P2
08/31/2022
Objection resolved — Addressed
08/31/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
08/31/2022
Special inspection requirement — Post-installed Anchors
Leo Lee
08/31/2022
Special inspection requirement — Structural Steel - Details
Leo Lee
08/30/2022
Objection raised — Scope
08/29/2022
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00489049-P3
08/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC03/04/2024
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC01/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC05/18/2023
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC03/21/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/20/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/14/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/14/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC01/05/2023
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC11/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/22/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/28/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/21/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/18/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/18/2022
DOB NOWStandpipeSigned-offA M B MECHANICAL INC12/16/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/22/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/23/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/22/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/22/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/19/2021
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC02/18/2021
DOB NOWStandpipeSigned-offA M B MECHANICAL INC12/03/2020
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC02/26/2020
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC03/04/2019
BIS—ISSUEDON STAR MANAGEMENT LLC01/19/2024
BISPLISSUEDBEST MECHANICAL SVCS INC12/20/2023
BIS—ISSUEDON STAR MANAGEMENT LLC12/20/2023
BIS—ISSUEDON STAR MANAGEMENT LLC09/05/2023
BIS—ISSUEDON STAR MANAGEMENT LLC03/28/2023
BIS—ISSUEDON STAR MANAGEMENT LLC01/13/2023
BIS—ISSUEDON STAR MANAGEMENT LLC12/13/2022
BIS—ISSUEDON STAR MANAGEMENT LLC05/11/2022
BISEQISSUEDON STAR MANAGEMENT LLC02/21/2022
BIS—ISSUEDON STAR MANAGEMENT LLC08/17/2021
BIS—ISSUEDON STAR MANAGEMENT LLC08/17/2021
BISPLRE-ISSUEDMPI PLUMBING CORP07/14/2021
+ 5 more permits on file
1 project · most recent 03/20/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/20/2024——Heating and Air Conditioning Systems
Heat / Cool
8 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025Permit IssuedTFK ELECTRIC CORP14 meters, 14 new_meters
12/05/2022Permit IssuedTFK ELECTRIC CORP—
03/10/2022Permit IssuedSTAR ELEC'L CONTRACTORS C—
03/01/2022Permit IssuedTFK ELECTRIC CORPGeneral Wiring
11/08/2021Permit IssuedTFK ELECTRIC CORP—
06/24/2021CompleteV. VASS ELECTRIC CORP—
03/21/2021CompleteV. VASS ELECTRIC CORP—
01/29/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 03/20/2024
Steel
FiledStatusContractorScope
03/20/2024——Steel
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/09/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/13/2024Final—progress
03/13/2024Post-installed Anchors—special
03/13/2024Structural Steel - High Strength Bolting—special
03/13/2024Structural Steel - Welding—special
03/13/2024Structural Steel - Details—special
02/29/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/29/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsSOORJBALLY HARILALLspecial
02/13/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsSOORJBALLY HARILALLspecial
02/13/2024Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/01/2023Post-installed AnchorsZELJKO STEVANOVICspecial
05/31/2023Post-installed AnchorsZELJKO STEVANOVICspecial
08/31/2022Structural Stability – Alterations of existing buildingsLeo Leespecial
08/31/2022Post-installed AnchorsLeo Leespecial
08/31/2022Structural Steel - DetailsLeo Leespecial
08/24/2022Post-installed AnchorsLeo Leespecial
08/24/2022Structural Stability – Alterations of existing buildingsLeo Leespecial
08/24/2022Structural Steel - DetailsLeo Leespecial
10/20/2020Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
11/13/2019Fuel-Oil Storage and Fuel-Oil Piping SystemsSOORJBALLY HARILALLspecial
11/04/2019Standpipe SystemsSOORJBALLY HARILALLspecial
▾Documents — 324 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
09/04/2026M00489043-P1Request digital key ↗
09/04/2026M00489043-I1Request digital key ↗
09/04/2026M00489055-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/04/2026M00135311-I1Request digital key ↗
08/15/2026M00135311-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00258406-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026M00264188-I1Request digital key ↗
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION61
06/18/2024122906695Open ↗
05/15/2024122013908Open ↗
03/08/2024122013908Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION21
12/20/2023122013908Open ↗
12/20/2023122013908Open ↗
12/20/2023122013908Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWLPC Approval/Permit5
08/27/2026M01014181-S1Open ↗
08/13/2026M01014181-S2Open ↗
08/13/2026M08021414-P1Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
11/27/2020122013908Open ↗
Showing 1 of 2 on file for this type
▸BISVERIFY TAX LOT1
09/18/2023122013908Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/19/2025122013908Open ↗
▸BISZoning Diagram (ZD1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/04/2026M00135311-P1Open ↗
09/04/2026M00135311-I1Open ↗
09/04/2026M00489043-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026M00876972-I1Open ↗
09/23/2026M00258406-I1Open ↗
09/23/2026M08021414-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026M01014181-S3Open ↗
08/24/2026M01014181-S3Open ↗
08/24/2026M01014181-S3Open ↗
▸Trade Schedules & Equipment31
▸BISSCHEDULE B - PLUMBING13
02/01/2024122013908Open ↗
02/01/2024122013908Open ↗
01/31/2024122013908Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
01/23/2024122013908Open ↗
01/02/2020122013908Open ↗
01/02/2020122013908Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
02/21/2025122013908Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
04/19/2024122013908Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
04/09/2024122013908Open ↗
▸BISSPRINKLER SYSTEMS1
02/14/2024122013908Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/11/2023122013908Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/08/2024122013908Open ↗
▸BISSTANDPIPE SYSTEMS1
02/14/2024122013908Open ↗
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
12/11/2020122013908Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/11/2020122013908Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
01/08/2024122013908Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/06/2024122013908Open ↗
02/20/2024122013908Open ↗
12/11/2020122013908Open ↗
▸BISELECTRIC MOTORS2
04/09/2024122013908Open ↗
04/09/2024122013908Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/19/2024122013908Open ↗
▸BISFENESTRATION AREAS1
04/19/2024122013908Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/19/2024122013908Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/02/2024122013908Open ↗
▸BISLIGHTING CONTROLS1
04/19/2024122013908Open ↗
▸BIS* HVAC INSULATION AND SEALING1
04/09/2024122013908Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/02/2024122013908Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/09/2024122013908Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/19/2024122013908Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
10/29/2024122013908Open ↗
12/13/2023122013908Open ↗
12/13/2023122013908Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/06/2024122013908Open ↗
04/19/2024122013908Open ↗
02/20/2024122013908Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/07/2023122013908Open ↗
12/11/2020122013908Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
12/14/2020122013908Open ↗
12/14/2020122013908Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/09/2024122013908Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/19/2024122013908Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/09/2024122013908Open ↗
▸BISMASONRY1
04/09/2024122013908Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
04/19/2024122013908Open ↗
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY / USE20
05/15/2024122013908Open ↗
02/20/2024122013908Open ↗
11/29/2023122013908Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/13/2023122013908Open ↗
01/19/2023122013908Open ↗
12/14/2022122013908Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER7
12/20/2023122013908Open ↗
12/20/2023122013908Open ↗
12/20/2023122013908Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL2
11/27/2020122013908Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership5
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
12/20/2023122013908Open ↗
12/11/2020122013908Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
12/11/2020122013908Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION19
02/28/2024122013908Open ↗
02/28/2024122013908Open ↗
02/01/2024122013908Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUNDERPINNING (2014)1
04/09/2024122013908Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
04/19/2024122013908Open ↗
▸BISMAINTENANCE INFORMATION1
04/09/2024122013908Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
04/09/2024122013908Open ↗
▸BISSITE CONNECTION:DEP1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type