← Back
BuildNYC
Over six families without stores
1162 SHERIDAN AVENUE
BRONX · BIN 2002754
💬 Discuss this project
1925Year Built
5Stories
C1Building Class
R7-1Zoning
44,000 sfGross Floor Area
43Units
Rent Stabilized27 Active Violations 22 unresolved · 5 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 1162 Sheridan · 10,000 sf lot · 4.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 5C, Unit 5D, Unit 5E8p · 1 filing · 16 docs
Floor 43p · 1 filing · 16 docs
Floor 311p · 1 filing · 16 docs
Floor 2
Floor 1Unit 1B, Unit 1C4p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DKCK707/08/2026
1162 Sheridan603/22/2026
Sheridan Realty203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2015$5.6M—1162-64 SHERIDAN REALTY, L.L.C. → 1162 SHERIDAN LLC$127/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture202/23/2023
Rise Architecture NJ204/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Palm Tree ConstructionGeneral Contractor307/08/2026
Platinum PWR ElectlElectrical103/21/2026
Hay Mechanical SolutionsPlumbing103/21/2026
Advanced ChimneyGeneral Contractor109/18/2015
Ghotra ConstructionGeneral Contractor106/19/2003
New City BridgingGeneral Contractor105/26/2015
N. Kofsky & SonsGeneral Contractor105/26/2004
N. Kofsky & SonsPlumbing105/26/2004
The Plumbing & Heating SpecialistPlumbing112/22/2014
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312402/23/2023
Sia Inspections7306204/15/2022
Building Lifecycle
11/06/2026
Observed multiple cracks on the parapet wall and bulkhead. As well as damage to stone coping at expo 1 above public side. In the electrical room,…
ECB violation · open
07/27/2026
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF LOCKABLE DOOR KNOB ASSEMBLY INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN…
HPD violation · closed
06/15/2026
§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM EAST AT…
HPD violation · closed
06/15/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO TENANT'S PHONE IN THE ENTIRE APARTMENT…
HPD violation · closed
06/15/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT WEST WALL IN THE KITCHEN LOCATED AT APT 2B, 3rd STORY, 1st…
HPD violation · closed
224 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPalm Tree Construction04/18/2025
DOB NOWGeneral ConstructionPermit IssuedPalm Tree Construction12/09/2021
BISOTISSUEDPalm Tree Construction02/05/2019
BISOTISSUEDAdvanced Chimney09/18/2015
BISEQISSUEDNew City Bridging05/26/2015
BISPLISSUEDHay Mechanical Solutions03/24/2015
BISPLISSUEDThe Plumbing & Heating Specialist12/22/2014
BISFBISSUEDAmbassador Fuel & OB12/22/2014
BISPLISSUEDN. Kofsky & Sons05/26/2004
BISOTISSUEDN. Kofsky & Sons05/26/2004
BISEQISSUEDGhotra Construction06/19/2003
BISEQISSUEDYork Scaffolding Equipment12/04/1995
BISOTISSUEDBlandford Land Clearing07/23/1990
1 project · most recent 02/22/2022
General Wiring
FiledStatusContractorScope
02/22/2022Permit IssuedPlatinum PWR ElectlGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/23/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
02/23/2023Tenant Protection Plan ComplianceJeff Akermanspecial
04/15/2022FinalSHIMON GREENEBAUMprogress
04/15/2022Energy Code Compliance InspectionsJeff Akermanprogress
04/15/2022Fire-Resistance Rated ConstructionJeff Akermanprogress
04/15/2022Lighting in dwelling unitsJeff Akermanenergy_progress
04/15/2022Insulation placement and R valuesJeff Akermanenergy_progress
04/15/2022Fire-Resistant Penetrations and JointsJeff Akermanspecial
04/15/2022Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
04/15/2022Energy Code Compliance InspectionsJeff Akermanprogress
04/15/2022FinalSHIMON GREENEBAUMprogress
04/15/2022Fire-Resistance Rated ConstructionJeff Akermanprogress
04/15/2022Insulation placement and R valuesJeff Akermanenergy_progress
04/15/2022Lighting in dwelling unitsJeff Akermanenergy_progress
04/15/2022Structural Stability – Alterations of existing buildingsSOFIA KAPELYANspecial
04/15/2022Fire-Resistant Penetrations and JointsJeff Akermanspecial
87 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account