← Back
Walk-up apt, over six families with stores
1164 1 AVENUE
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C1-9Zoning
—Gross Floor Area
18Units
59 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: 1164 FIRST AVENUE CORP. · 3.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1164 FIRST AVENUE CORP.303/22/2026
OWNER OF 1164 1 AVE103/22/2026
1164 1ST A303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT109/17/2026
Building Lifecycle
All (67)Filed (1)Violation (60)Special Inspection (6)
09/17/2026
Filed — Alteration
FILE BOILER EQUIPMENT FOR MIXED-USE BUILDING TO REGISTER 1 BOILERS AT CELLAR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
M01450588-I1
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
03/07/2023
Violation issued (HPD, open)
B
03/07/2023
Violation issued (HPD, open)
A
03/07/2023
Violation issued (HPD, open)
B
03/07/2023
Violation issued (HPD, closed)
C
03/07/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, closed)
I
09/21/2022
Violation issued (HPD, open)
A
09/21/2022
Violation issued (HPD, open)
A
09/21/2022
Violation issued (HPD, open)
B
09/21/2022
Violation issued (HPD, open)
B
09/21/2022
Violation issued (HPD, open)
A
09/21/2022
Violation issued (HPD, open)
A
09/21/2022
Violation issued (HPD, open)
B
09/21/2022
Violation issued (HPD, open)
A
06/07/2022
Violation issued (HPD, open)
B
04/19/2022
Violation issued (HPD, open)
A
04/19/2022
Violation issued (HPD, open)
A
04/19/2022
Violation issued (HPD, open)
C
04/19/2022
Violation issued (HPD, open)
B
04/19/2022
Violation issued (HPD, open)
A
04/19/2022
Violation issued (HPD, open)
A
02/15/2022
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
I
11/17/2019
Violation issued (HPD, open)
A
11/17/2019
Violation issued (HPD, open)
A
11/17/2019
Violation issued (HPD, open)
A
11/17/2019
Violation issued (HPD, open)
A
11/17/2019
Violation issued (HPD, open)
A
11/17/2019
Violation issued (HPD, open)
A
10/25/2019
Violation issued (HPD, closed)
I
01/07/2019
Violation issued (HPD, open)
B
01/07/2019
Violation issued (HPD, open)
A
01/07/2019
Violation issued (HPD, open)
A
01/07/2019
Violation issued (HPD, open)
A
01/07/2019
Violation issued (HPD, open)
C
01/07/2019
Violation issued (HPD, open)
C
01/07/2019
Violation issued (HPD, open)
A
01/07/2019
Violation issued (HPD, open)
A
01/07/2019
Violation issued (HPD, open)
A
10/05/2018
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
10/24/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
02/26/2012
Violation issued (HPD, open)
B
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDADVANCED PLUMB HEAT. SPRINK03/17/2005
BISPLISSUEDWASOFF PLBG & UTILITY CO10/26/2004
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM09/16/2004
BISEQISSUEDCHENG FU CORP09/13/2004
BIS—ISSUEDCHENG FU CORP09/13/2004
BISPLISSUEDMAINLAND PLBG & HTGINC01/29/2001
BISOTISSUEDJ&K CONSTRUCTION CONSULTANT, INC01/22/2001
BISPLISSUEDADVANCED PLUMBING MECH04/26/2000
BISOTISSUEDGOOD JOB GENERAL CONSTRUCTION04/18/2000
BISOTISSUEDRONG YIP CONSTRUCTION CO.,INC.07/02/1997
BISPLISSUEDMAGOR PLUMBING HEATING05/03/1995
BISFPISSUEDIDEAL FIRE CONTROL04/17/1995
BISPLISSUEDMAGOR PLUMBING HEATING02/24/1995
BISMHISSUEDNEW HOUSES CPNSTRU CPR¢02/06/1995
1 project · most recent 09/17/2026
Gas
FiledStatusContractorScope
09/17/2026——Gas
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/26/2026Fire-Resistant Penetrations and Joints—special
08/26/2026Tenant Protection Plan Compliance—special
08/26/2026Energy Code Compliance Inspections—progress
08/26/2026HVAC-R and service water heating equipment—energy_progress
08/26/2026HVAC-R and service water piping design and insulation—energy_progress
08/26/2026HVAC-R and service water heating system controls—energy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/22/2026M01450588-I1Request digital key ↗
09/22/2026M01450588-S1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/22/2026M01450588-S1Open ↗
09/22/2026M01450588-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/22/2026M01450588-S1Open ↗
09/22/2026M01450588-I1Open ↗