The Rivercrest Condominium
1184 RIVER AVENUE · BIN 2130367
💬 Discuss this project
—Year Built
—Stories
—Building Class
R7-1Zoning
—Gross Floor Area
—Units
7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
2,579 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof11p · 4 filings · 20 docs
Bulkhead1p · 2 filings · 20 docs
Floor 81p · 2 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction35p · 4 filings · 20 docs
Floor 1Under Construction35p · 5 filings · 20 docs
CellarUnder Construction38p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JOY CONSTRUCTION5007/08/2026
YYY 62ND STREET6607/08/2026
ROCK GROUP NY507/08/2026
PARSONS CONSTRUCTION1007/08/2026
MADDD EQUITIES2507/08/2026
GDI CONSTRUCTION1107/08/2026
HPDC2 HOUSING DEVELOPMENT303/22/2026
HPD HOUSING DEVELOPMENT F103/22/2026
J EQUITIES II1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J PROFESSIONAL EXPEDITING4003/21/2026
HM LOKE CONSULTING ENGINEERING PC803/21/2026
GREEN STUDIO203/21/2026
SIGNS CAD603/21/2026
A1 EXPEDITING SERVICE203/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WOODHAVEN MASON LLCGeneral Contractor1007/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor907/08/2026
4 BROTHERS & SONS FENCEGeneral Contractor807/08/2026
JOY CONSTRUCTION CORPGeneral Contractor607/08/2026
RO-SAL PLUMBING & HTG INC INC.Plumbing607/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
SIGNS CADScaffold307/08/2026
ROCK GROUP NY CORPGeneral Contractor207/08/2026
RO-SAL PLBG HTG INCFire Protection207/08/2026
COUNTY ELECL CONTRACTOR IElectrical203/22/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
SHLOIME SPIRAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT68641306/24/2024
Building Lifecycle
All (210)Filed (36)Permit Issued (38)Signed Off (14)Violation (60)Inspection (18)Objection (20)Special Inspection (24)
08/12/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, closed)
C
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
B
06/26/2026
Violation issued (HPD, open)
B
06/22/2026
Signed off — Alteration
Interior renovation for fit-out of Tenant Space in Cellar, 1st and 2nd Floor. No change in egress, use, or occupancy.
X00855076-I1
06/19/2026
Filed — Alteration
Installation of Plumbing system in conjunction with fit-out of Tenant Space. No change in egress use or occupancy.
X00870939-P3
06/16/2026
Permit issued — Plumbing
X00870939-I1-PL
06/10/2026
Signed off — Alteration
Installation of Emergency Generator on the third floor in conjunction with NB # 210178127. No change in egress use or occupancy.
X00502297-I1
05/22/2026
Signed off — Alteration
Installation of Fuel Oil Tank with a capacity of 330 gallons on roof level to service Emergency Generator. No change in egress use or occupancy.
X00502335-I1
05/22/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/20/2026
Signed off — Alteration
New and Relocated Sprinkler for the fit-out of cellar, 1st and 2nd Floor Tenant Space. No change in egress use or occupancy.
X00870976-I1
05/16/2026
Violation issued (HPD, closed)
C
05/13/2026
Permit issued — Curb Cut
X00059647-I1-CC
03/28/2026
Violation issued (HPD, closed)
A
03/28/2026
Violation issued (HPD, closed)
A
03/28/2026
Violation issued (HPD, closed)
C
03/28/2026
Violation issued (HPD, closed)
A
03/27/2026
Violation issued (HPD, open)
A
03/27/2026
Violation issued (HPD, open)
A
03/19/2026
Violation issued (ECB, closed)
Elevators
03/19/2026
Violation issued (ECB, closed)
Elevators
03/19/2026
Violation issued (ECB, closed)
Elevators
03/19/2026
Violation issued (ECB, closed)
Elevators
03/19/2026
Violation issued (ECB, closed)
Elevators
03/19/2026
Violation issued (ECB, closed)
Elevators
03/05/2026
Violation issued (HPD, closed)
A
02/03/2026
Violation issued (ECB, open)
Elevators
02/02/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/11/2026
Violation issued (HPD, closed)
C
01/11/2026
Violation issued (HPD, closed)
C
12/18/2025
Signed off — Alteration
X00749338-I1
12/18/2025
Signed off — Alteration
X00749349-I1
12/09/2025
Violation issued (FDNY_ORDER, closed)
11/21/2025
Violation issued (HPD, closed)
B
07/31/2025
Violation issued (HPD, closed)
B
07/24/2025
Signed off — Alteration
INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYCBUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00415867-I1
07/24/2025
Signed off — Alteration
INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED. SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
X00635339-I1
06/13/2025
Violation issued (HPD, closed)
A
05/15/2025
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
05/09/2025
Violation issued (FDNY_ORDER, closed)
04/09/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/29/2025
Violation issued (HPD, closed)
C
01/29/2025
Violation issued (HPD, closed)
A
01/29/2025
Violation issued (HPD, closed)
A
01/29/2025
Violation issued (HPD, closed)
A
11/12/2024
Signed off — Alteration
X01128098-I1
10/29/2024
Violation issued (HPD, closed)
A
10/29/2024
Violation issued (HPD, closed)
A
10/29/2024
Violation issued (HPD, closed)
A
10/29/2024
Violation issued (HPD, closed)
A
10/25/2024
Filed — Alteration
X01128098-I1
10/25/2024
Permit issued — Sign
X01128098-I1-SG
10/25/2024
Violation issued (HPD, closed)
A
10/25/2024
Violation issued (HPD, closed)
A
10/25/2024
Violation issued (HPD, closed)
A
10/25/2024
Violation issued (HPD, closed)
A
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY PROJECTING BANNER TOTAL OF (6) BANNERS NON-FLASHING, NON-ADVERTISING SIGN, NO CHANGE TO USE, EGRESS, OR OCUPATION.
X01065119-I1
09/10/2024
Signed off — Alteration
ERECT ACCESSORY ILLUMINATED SIGN NO CHANGE TO USE, EGRESS, OR OCCUPATION.
X01065074-I1
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRO-SAL PLUMBING & HTG INC INC.06/16/2026
DOB NOWCurb CutSigned-offJOY CONSTRUCTION CORP05/13/2026
DOB NOWSignSigned-offSIGNS CAD CORP10/25/2024
DOB NOWSignSigned-offSIGNS CAD CORP07/17/2024
DOB NOWSignSigned-offSIGNS CAD CORP07/17/2024
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC05/29/2024
DOB NOWPlumbingPermit IssuedRO-SAL PLUMBING & HTG INC05/29/2024
DOB NOWGeneral ConstructionSigned-offJOY CONSTRUCTION CORP03/19/2024
DOB NOWGeneral ConstructionSigned-offJOY CONSTRUCTION CORP06/07/2023
DOB NOWPlumbingPermit IssuedRO-SAL PLUMBING & HTG INC06/05/2023
DOB NOWSprinklersSigned-offRO-SAL PLBG HTG INC06/05/2023
DOB NOWMechanical SystemsSigned-offJOY CONSTRUCTION CORP05/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC03/27/2023
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/30/2023
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP01/30/2023
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/03/2023
DOB NOWBoiler EquipmentSigned-offRO-SAL PLUMBING & HTG INC11/21/2022
DOB NOWBoiler EquipmentSigned-offRO-SAL PLUMBING & HTG INC08/24/2022
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC08/17/2022
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC08/17/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP05/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC04/07/2022
DOB NOWBoiler EquipmentPermit IssuedRO-SAL PLUMBING & HTG INC03/18/2022
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC01/31/2022
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/06/2022
DOB NOWProtection and Mechanical MethodsSigned-offEVEREST SCAFFOLDING INC12/08/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC11/23/2021
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC10/20/2021
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC06/15/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC05/19/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC05/13/2021
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/12/2021
DOB NOWSupported ScaffoldSigned-offWOODHAVEN MASON LLC10/22/2020
DOB NOWSidewalk ShedSigned-offPARSONS CONSTRUCTION INC06/11/2020
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE01/23/2020
DOB NOWSidewalk ShedPermit IssuedROCK GROUP NY CORP10/11/2019
DOB NOWSidewalk ShedPermit IssuedROCK GROUP NY CORP09/04/2019
DOB NOWConstruction FenceSigned-off4 BROTHERS SONS FENCE08/20/2019
BISSPISSUEDRO-SAL PLBG HTG INC10/04/2023
BIS—ISSUEDJOY CONSTRUCTION CORP09/18/2023
+ 33 more permits on file
2 projects · most recent 06/01/2023
Heating and Air Conditioning Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
06/01/2023——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM241BTE5 20 tons · Vrf Outdoor ×14
LSU243HLV3 2 tons · Heat Pump Outdoor ×3
LSU363HLV3 3 tons · Heat Pump Outdoor ×2
Ventilation
Systemair FR3800-208-3-CAV 3,000 CFM · Erv ×2
Lg LG ARVU63ZEA2 600 CFM · Vrf Indoor ×1
04/26/2021Signed-offJOY CONSTRUCTION CORPGenerators
Generators
Generac SD600 600 kW · Generator ×1
1 project · most recent 04/29/2024
FiledStatusContractorScope
04/29/2024Signed-offRO-SAL PLBG HTG INC500 heads
1 project · most recent 06/19/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/19/2026Permit IssuedRO-SAL PLUMBING & HEATINGGas, Water/Sanitary
14 projects · most recent 11/14/2025
General Wiring
FiledStatusContractorScope
11/14/2025Permit IssuedFORSURE ELECTRIC NY INCGeneral Wiring
11/04/2024CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
07/17/2024CompleteSIGNS CAD CORP—
07/17/2024CompleteCOUNTY ELECL CONTRACTOR IGeneral Wiring
04/26/2024CompleteTUXEDO ELEC'L CONTR'G INC—
06/02/2023CompleteTUXEDO ELEC'L CONTR'G INC—
06/02/2023CompleteTUXEDO ELEC'L CONTR'G INC—
03/09/2022CompleteTOP SHELF ELECTRIC CORP504 meters, 504 new_meters
07/13/2021CompleteTUXEDO ELEC'L CONTR'G INC—
10/26/2020CompleteTOP SHELF ELECTRIC CORP—
10/07/2020CompleteBOROWIDE ELECT'L CONTR'S—
09/02/2020CompleteIZZO ELECTRIC INC.1 meters, 1 new_meters
06/10/2020CompleteGREEN POWER ELECTRIC CORP—
08/27/2019Permit IssuedILLUMINOUS ELECTRIC CORP.—
1 project · most recent 09/03/2019
Sidewalk Shed
FiledStatusContractorScope
09/03/2019Permit IssuedROCK GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
05/22/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
02/02/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/15/2025Fail-Final Boiler Equipment InspectionFailView ↗
04/09/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/22/2022No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
07/15/2024FinalJames King IIIprogress
05/06/2024Sprinkler SystemsJUAN GOMEZspecial
04/29/2024Public Assembly Emergency LightingJUAN GOMEZprogress
04/29/2024Public Assembly Emergency LightingJUAN GOMEZprogress
04/25/2024Sprinkler SystemsJUAN GOMEZspecial
01/30/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJUAN GOMEZspecial
01/25/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJUAN GOMEZspecial
11/01/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsJUAN GOMEZspecial
06/23/2022Heating SystemsJUAN GOMEZspecial
06/23/2022Maintenance informationJUAN GOMEZenergy_progress
06/23/2022HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
06/23/2022HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
06/23/2022HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
06/21/2022Heating SystemsJUAN GOMEZspecial
06/21/2022Maintenance informationJUAN GOMEZenergy_progress
06/21/2022HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
06/21/2022HVAC-R and service water heating equipmentJUAN GOMEZenergy_progress
06/21/2022HVAC-R and service water heating system controlsJUAN GOMEZenergy_progress
08/05/2020Shutoff dampersJUAN GOMEZenergy_progress
08/05/2020Maintenance informationJUAN GOMEZenergy_progress
08/05/2020HVAC and service water heating equipment JUAN GOMEZenergy_progress
08/05/2020Heating SystemsJUAN GOMEZspecial
08/05/2020Electrical motorsJUAN GOMEZenergy_progress
08/05/2020HVAC and service water heating system controls JUAN GOMEZenergy_progress
▾Documents — 460 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch24
08/26/2026X00059647-I1Request digital key ↗
08/25/2026X00636182-I1Request digital key ↗
08/24/2026X00749349-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold6
08/25/2026X00415867-I1Request digital key ↗
08/25/2026X00415867-P3Request digital key ↗
08/25/2026X00415867-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/21/2026X01043202-I1Request digital key ↗
08/21/2026X01043213-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00217569-I1Request digital key ↗
08/26/2026X00356945-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/14/2026X00381136-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00212315-I1Request digital key ↗
▸Applications & Permits85
▸BISPlan Work Approval Application53
10/30/2025210178127Open ↗
10/15/2025210178127Open ↗
10/08/2025210178127Open ↗
Showing 3 of 53 on file for this type
▸BISWork Permit Application31
02/29/2024210178127Open ↗
08/18/2023210178127Open ↗
01/31/2022210178127Open ↗
Showing 3 of 31 on file for this type
▸BISHPD PERMIT NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM4
08/11/2025210178127Open ↗
04/20/2023210178127Open ↗
Showing 2 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/26/2026X00217569-I1Open ↗
08/26/2026X00356945-I1Open ↗
08/25/2026X00415867-P3Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026X00749338-I1Open ↗
09/23/2026X00749349-I1Open ↗
09/23/2026X00749349-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026X00749338-I1Open ↗
09/23/2026X00749349-I1Open ↗
09/23/2026X00502335-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/21/2020240273672Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/21/2020240273672Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/21/2020240273672Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING7
08/11/2023220689663Open ↗
03/07/2023220689663Open ↗
12/21/2022220689663Open ↗
Showing 3 of 7 on file for this type
▸BISSTANDPIPE SYSTEMS2
11/30/2023220681037Open ↗
04/13/2023220689663Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
12/16/2023240223520Open ↗
Showing 1 of 2 on file for this type
▸BISExcavation Or Demolition 5 Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed22
08/13/2026X00502335-P2Open ↗
08/13/2026X00356945-I1Open ↗
08/13/2026X00415867-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/23/2026X00502335-I1Open ↗
08/21/2026X00870939-I1Open ↗
08/15/2026X00502297-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION4
09/23/2025240259858Open ↗
09/15/2025220681037Open ↗
09/15/2025220689663Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
05/12/2022240223520Open ↗
05/21/2020240273672Open ↗
Showing 2 of 3 on file for this type
▸BISOer Notice To Proceed Segment B1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/14/2020220689663Open ↗
11/30/2022210178127Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00749349-I1Open ↗
08/13/2026X00749338-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00749349-I1Open ↗
08/13/2026X00749338-I1Open ↗
▸BISAir Sealing And Insulation Testing1
01/11/2023210178127Open ↗
▸BISLighting In Dwelling Units1
04/13/2023210178127Open ↗
▸BISHvac Insulation And Sealing1
04/13/2023210178127Open ↗
▸BISExterior Lighting Power1
04/13/2023210178127Open ↗
▸BISInterior Lighting Power1
04/13/2023210178127Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/08/2022240273672Open ↗
10/22/2020220689663Open ↗
10/14/2020220689663Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTechnical Report Responsibility Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
09/19/2022210178127Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/31/2023210178127Open ↗
▸BISCONCRETE - PRECAST1
09/19/2022210178127Open ↗
▸BISStructural Steel Welding1
09/19/2022210178127Open ↗
▸BISMasonry1
09/19/2022210178127Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/19/2022210178127Open ↗
▸BISMechanical Systems1
04/10/2023210178127Open ↗
▸Approvals, Objections & Sign-offs47
▸BISSchedule A Occupancy Use22
10/30/2025210178127Open ↗
10/15/2025210178127Open ↗
10/08/2025210178127Open ↗
Showing 3 of 22 on file for this type
▸BISSuperseding Letter10
02/29/2024210178127Open ↗
08/18/2023210178127Open ↗
01/31/2022210178127Open ↗
Showing 3 of 10 on file for this type
▸BISCertificate Of Occupancy Loc Request9
03/31/2023210178127Open ↗
03/01/2023210178127Open ↗
02/22/2023210178127Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProject Specific Gl Insurance3
02/29/2024210178127Open ↗
08/18/2023210178127Open ↗
Showing 2 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/23/2025240259858Open ↗
09/15/2025220681037Open ↗
09/15/2025220689663Open ↗
▸Filing & Intake Forms51
▸BISADDITIONAL INFORMATION38
08/11/2025210178127Open ↗
03/06/2025210178127Open ↗
03/19/2024210178127Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
05/21/2020240273672Open ↗
Showing 1 of 3 on file for this type
▸Other Documents15
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
09/26/2025240259858Open ↗
09/22/2025220681037Open ↗
01/09/2024240223520Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
04/20/2023210178127Open ↗
Showing 1 of 2 on file for this type
▸BISShutoff Dampers1
04/13/2023210178127Open ↗
▸BISHPD INCOME RESTRICTED HSG UNIT LTR1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISExterior Insulation And Finish Systems Eifs1
11/30/2022210178127Open ↗
▸BISOn Site Storm Water Drain Disp Detent Install Drywell1
11/30/2022210178127Open ↗
▸BISEmergency Standby Power Systems Generators1
04/17/2023210178127Open ↗
▸BISFire Resistive Rated Construction1
11/30/2022210178127Open ↗
▸BISHpd Completion Notice1
01/16/2026210178127Open ↗