1165 MADISON AVENUE
MANHATTAN · BIN 1091674
💬 Discuss this project
—Year Built
—Stories
—Building Class
C1-9Zoning
—Gross Floor Area
—Units
0 Open Violations
10,388 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof23p · 6 filings · 20 docs
Bulkhead2p · 1 filing · 15 docs
Floor 141p · 1 filing · 20 docs
Floor 1318p · 7 filings · 20 docs
Floor 1218p · 6 filings · 20 docs
Floor 1115p · 5 filings · 20 docs
Floor 1018p · 6 filings · 20 docs
Floor 914p · 7 filings · 20 docs
Floor 87p · 5 filings · 20 docs
Floor 74p · 3 filings · 20 docs
Floor 63p · 4 filings · 20 docs
Floor 53p · 4 filings · 20 docs
Floor 45p · 3 filings · 20 docs
Floor 37p · 5 filings · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 17p · 6 filings · 20 docs
Cellar8p · 5 filings · 20 docs
Sub-Cellar6p · 4 filings · 20 docs
1 job · most recent 01/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2026Signed-offSMI CONSTRUCTION MANGEMENHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN FXSQ15TAVJU 1,600 BTU · Vrf Indoor ×1
2 jobs · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026Signed-offKG SPRINKLER CORP25 heads
01/15/2026Signed-offKG SPRINKLER CORP23 heads
2 jobs · most recent 04/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2026Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
01/15/2026Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
23 jobs · most recent 03/10/2026
General Wiring Lighting
FiledStatusContractorScope
03/10/2026CompleteOSTRAVA ELECTRIC CORP—
11/17/2025CompleteMACK ELECTRICAL INCGeneral Wiring
11/17/2025CompleteMACK ELECTRICAL INCGeneral Wiring
11/17/2025CompleteMACK ELECTRICAL INCGeneral Wiring
11/17/2025CompleteMACK ELECTRICAL INCGeneral Wiring
10/29/2025CompleteIDEAL ELEC & HVAC CO INCGeneral Wiring
02/21/2025CompleteM.C. ELECTRICAL NY INC—
10/14/2024CompleteMACK ELECTRICAL INCGeneral Wiring
09/25/2024CancelledMACK ELECTRICAL INCGeneral Wiring
09/23/2024CompleteLEBO ELECTRIC LLCGeneral Wiring
09/04/2024CompleteECO ELECTRICAL SERVCS LLCLighting
07/24/2024CompleteKYL ELECTRIC LLCGeneral Wiring
04/21/2024CompleteECO ELECTRICAL SERVCS LLC—
01/06/2024CompleteLEBO ELECTRIC LLCGeneral Wiring
12/08/2023CompleteALBA ELECTRIC CORPGeneral Wiring
Building Lifecycle
All (300)Filed (58)Permit Issued (66)Signed Off (29)Violation (20)Inspection (35)Objection (62)Special Inspection (30)
06/30/2026
Signed off — Alteration
Interior renovation of an existing apartment on the 9th Floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00989296-S1
06/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2026
Signed off — Alteration
Interior renovation of an existing apartment on the 9th Floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00989296-I1
06/05/2026
Signed off — Alteration
Interior renovation of an existing apartment on the 9th Floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00989296-S2
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/14/2026
Signed off — Alteration
PL/SP work for Quadplex apartment
M00842404-S1
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Votto
05/12/2026
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
05/11/2026
Violation issued (HPD, closed)
A
05/05/2026
Permit issued — Plumbing
M00842404-S1-PL
05/05/2026
Permit issued — Sprinklers
M00989296-S1-PL
04/21/2026
Filed — Alteration
Interior renovation of an existing apartment on the 9th Floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00989296-P2
04/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/26/2026
Special inspection requirement — Sprinkler Systems
Delbert Smith
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Delbert Smith
01/15/2026
Filed — Alteration
PL/SP work for Quadplex apartment
M00842404-P8
12/12/2025
Special inspection requirement — Sprinkler Systems
Delbert Smith
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Delbert Smith
11/12/2025
Signed off — Alteration
PL/SP work for Quadplex apartment
M00842404-I1
11/10/2025
Signed off — Alteration
PL/SP work for Quadplex apartment
M00842404-S2
10/01/2025
Permit issued — General Construction
M00989296-I1-GC
09/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2025
Filed — Alteration
PL/SP work for Quadplex apartment
M00842404-P7
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Delbert Smith
07/18/2025
Special inspection requirement — Sprinkler Systems
Delbert Smith
07/16/2025
Signed off — Alteration
Interior renovation - Remove partial non-bearing partition wall and install new lighting. No change in use, egress and occupancy
M01075782-I1
07/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2025
Signed off — Alteration
M01171684-I1
05/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/13/2025
Filed — Alteration
PL/SP work for Quadplex apartment
M00842404-P5
05/07/2025
Special inspection requirement — Sprinkler Systems
Delbert Smith
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Delbert Smith
05/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00942728-I1
04/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2025
Permit issued — General Construction
M00989296-I1-GC
04/21/2025
Permit issued — Sprinklers
M00842404-S1-PL
04/21/2025
Permit issued — Mechanical Systems
M00989296-S2-MS
04/15/2025
Permit issued — Plumbing
M00989296-S1-PL
03/20/2025
Filed — Alteration
Interior renovation of an existing apartment on the 9th Floor. work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00989296-P1
03/09/2025
Permit issued — General Construction
M00842404-I1-GC
03/08/2025
Permit issued — Mechanical Systems
M00842404-S2-MS
02/14/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00647861-I1
02/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/11/2025
Permit issued — General Construction
M01171684-I1-GC
02/06/2025
Filed — Alteration
M01171684-I1
02/04/2025
Signed off — Alteration
INSTALL NEW DIFFUSER TO ACCOMODOATE NEW LAY OUT FO RNEW TENANT "MALIN+GOETZ. AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00945099-I1
02/03/2025
Signed off — Alteration
Install new plumbing fixtures to accommodate new layout for new tenant "MALIN+GOETZ. per attached plans.
M00945105-I1
01/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/24/2025
Special inspection requirement — Final
William Ryan
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAFTALI GROUP7107/08/2026
MANHATTAN CONCRETE507/08/2026
OLIVER COPE ARCHITECT3407/08/2026
DORIA, INC503/22/2026
TITANIUM CONSTRUCTION603/22/2026
C/O NAFTALI GROUP 1165 MA103/22/2026
TITAMIUN CONSTRUCTION SER103/22/2026
1169 MADISON AVE OWNER603/22/2026
ANDREW HORAN ALBA SERVICE203/22/2026
SHAPEL GENERAL CONTRACTING, INC.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2015$40.0M—— → —— not available
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor1907/08/2026
TITANIUM CONSTRUCTION SERGeneral Contractor1803/21/2026
DONATO PLUMBING, INCPlumbing707/08/2026
PLUMBING NYC INCPlumbing607/08/2026
SMI CONSTRUCTION MANGEMENTGeneral Contractor607/08/2026
MANHATTAN CONCRETE LLCGeneral Contractor507/08/2026
NIKOLAOS KALYVASElectrical503/21/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor506/07/2026
KG SPRINKLER CORPFire Protection407/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
MGI DESIGNED INTERIORSGeneral Contractor407/08/2026
SHAPEL GENERAL CONTRACTINGeneral Contractor407/08/2026
SNG BRICK AND STONE INCGeneral Contractor403/21/2026
PLUMBING NYC, INCFire Protection407/08/2026
MACK ELECTRICAL INCElectrical303/22/2026
SUPER POWER CONSTRUCTIONGeneral Contractor303/21/2026
LEBO ELECTRIC LLCElectrical203/22/2026
TOM RECTENWALD CONSTRUCTIGeneral Contractor207/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
DORIA, INCGeneral Contractor203/21/2026
ECO ELECTRICAL SERVCS LLCElectrical103/22/2026
G&B PLUMBING&HEATING CORPPlumbing107/08/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor107/08/2026
ROBIN ELECTRICAL CO., INCElectrical103/22/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTEGRITY CONSULTING SERV666504/21/2026
CES ENGINEERING LLC1277701/15/2026
RYAN SPECIAL ENGINEERING2018102/06/2025
ALAN MARGOLIN & ASSOC423311/25/2024
MW PROFESSIONAL ENGINEERI570107/03/2024
DOMANI INSPECTION SERVICE8431206/24/2024
MEP INSPECTIONS, INC1102104/12/2024
CATALPA SPECIAL INSPECTIO2004604/12/2024
SKYLINE RIGGING7880105/23/2023
WSP USA CORP1848203/23/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/05/2026
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC05/05/2026
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR10/01/2025
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR04/21/2025
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC04/21/2025
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR04/21/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC04/15/2025
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN03/09/2025
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN03/08/2025
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND02/11/2025
DOB NOWPlumbingSigned-offH M SPRINKLER INC01/08/2025
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN12/24/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC10/07/2024
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION07/16/2024
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC06/05/2024
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC04/29/2024
DOB NOWMechanical SystemsSigned-offSHAPEL GENERAL CONTRACTIN04/25/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR04/25/2024
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC04/22/2024
DOB NOWSprinklersSigned-offH M SPRINKLER INC04/19/2024
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR04/19/2024
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR04/17/2024
DOB NOWGeneral ConstructionSigned-offSHAPEL GENERAL CONTRACTIN04/05/2024
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN03/28/2024
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER03/20/2024
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS12/11/2023
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO12/08/2023
DOB NOWMechanical SystemsSigned-offARTUR HOME IMPROVEMENT12/08/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR12/06/2023
DOB NOWGeneral ConstructionSigned-offARTUR HOME IMPROVEMENT12/06/2023
DOB NOWGeneral ConstructionSigned-offMGI DESIGNED INTERIORS11/17/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC10/10/2023
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER09/19/2023
DOB NOWConstruction FenceSigned-offCONSOLIDATED SCAFFOLDING07/10/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/06/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC06/05/2023
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN05/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC05/23/2023
DOB NOWPlumbingSigned-offH M SPRINKLER INC05/15/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC05/09/2023
+ 33 more permits on file
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
06/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
05/12/2026Sprinkler SystemsALEKSANDR LEVINspecial
05/12/2026HVAC-R and service water piping design and insulationPeter Vottoenergy_progress
03/26/2026Fire-Resistant Penetrations and JointsDelbert Smithspecial
03/26/2026Sprinkler SystemsDelbert Smithspecial
12/12/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
12/12/2025Sprinkler SystemsDelbert Smithspecial
07/18/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
07/18/2025Sprinkler SystemsDelbert Smithspecial
05/07/2025Fire-Resistant Penetrations and JointsDelbert Smithspecial
05/07/2025Sprinkler SystemsDelbert Smithspecial
01/30/2025Tenant Protection Plan ComplianceWilliam Ryanspecial
01/30/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/24/2025FinalWilliam Ryanprogress
11/22/2024Post-installed AnchorsYoung Suhspecial
11/22/2024FinalYoung Suhprogress
11/22/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
09/18/2024Fire-Resistant Penetrations and JointsYoung Suhspecial
09/18/2024FinalYoung Suhprogress
09/18/2024Sprayed fire-resistant materialsYoung Suhspecial
09/18/2024Post-installed AnchorsYoung Suhspecial
09/16/2024Mechanical SystemsJAMES SENATROspecial
09/16/2024Fire-Resistant Penetrations and JointsDelbert Smithspecial
09/16/2024FinalJAMES SENATROprogress
09/16/2024Sprinkler SystemsDelbert Smithspecial
06/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
Latest 25 of 89.
▾Documents — 502 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch40
09/04/2026M00480784-P1Contact architect ↗
09/04/2026M00480784-P2Contact architect ↗
09/04/2026M00480784-I1Contact architect ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/01/2026M00346406-P5Contact architect ↗
09/01/2026M00346406-P2Contact architect ↗
08/15/2026M00346406-P3Contact architect ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
09/04/2026M00391459-I1Contact architect ↗
08/14/2026M00390758-P1Contact architect ↗
08/14/2026M00390758-P3Contact architect ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/14/2026M00390758-P1Contact architect ↗
08/14/2026M00390758-P3Contact architect ↗
08/14/2026M00390758-P4Contact architect ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/01/2026M00346399-P2Contact architect ↗
09/01/2026M00346399-P3Contact architect ↗
09/01/2026M00346399-I1Contact architect ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/15/2026M00346356-I1Contact architect ↗
08/14/2026M00346356-P1Contact architect ↗
▸Applications & Permits86
▸BISPLAN / WORK APPROVAL APPLICATION61
01/28/2026121208102Open ↗
04/15/2025121208102Open ↗
04/14/2025121208102Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION22
10/30/2023121208102Open ↗
10/24/2023121208102Open ↗
10/31/2022121208102Open ↗
Showing 3 of 22 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/14/2023121208102Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/09/2026140929967Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING APPEAL1
04/05/2022121208102Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications140
▸DOB NOWDPL-1: Design Professional Seal & Signature58
09/04/2026M00346356-I1Open ↗
09/04/2026M00346356-P1Open ↗
09/03/2026M00553562-P3Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/23/2026M00390758-I1Open ↗
09/19/2026M00842404-P4Open ↗
09/12/2026M00968539-S2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/19/2026M00842404-P4Open ↗
09/12/2026M00968539-S2Open ↗
09/02/2026M00842404-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/22/2023141021132Open ↗
09/03/2021141004641Open ↗
08/31/2021141004543Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
03/22/2023141021132Open ↗
01/18/2022141006989Open ↗
09/03/2021141004641Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/22/2023141021132Open ↗
09/03/2021141004641Open ↗
08/31/2021141004543Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/18/2022141006989Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment11
▸DOB NOWFDNY: Letter of No Objection5
08/13/2026M00842404-P7Open ↗
08/13/2026M00842404-P1Open ↗
08/13/2026M00842404-S1Open ↗
Showing 3 of 5 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/05/2025121208102Open ↗
Showing 1 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/01/2023121208102Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/01/2023121208102Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
03/01/2023121208102Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
04/10/2023121208102Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/24/2025121208102Open ↗
10/13/2022123724309Open ↗
10/13/2022123724292Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR LIGHTING POWER1
03/01/2023121208102Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/17/2023121208102Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/27/2025121208102Open ↗
▸BISINTERIOR LIGHTING POWER1
03/01/2023121208102Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/16/2023121208102Open ↗
▸BISFENESTRATION AREAS1
02/17/2023121208102Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/01/2023121208102Open ↗
▸BISPreliminary Commissioning Report1
10/15/2024121208102Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00346399-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00346399-I1Open ↗
▸Inspections & Test Reports38
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX15
11/17/2021121208102Open ↗
11/17/2021121208102Open ↗
08/02/2021121208102Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY15
01/27/2025141004062Open ↗
11/08/2022141004543Open ↗
11/08/2022141004641Open ↗
Showing 3 of 15 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
02/16/2023121208102Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/17/2023121208102Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/01/2023121208102Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/01/2023121208102Open ↗
▸BISMECHANICAL SYSTEMS1
03/01/2023121208102Open ↗
▸BISMASONRY1
02/16/2023121208102Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/02/2021141004543Open ↗
▸Approvals, Objections & Sign-offs34
▸BISSCHEDULE A - OCCUPANCY / USE16
01/28/2026121208102Open ↗
04/11/2025121208102Open ↗
09/14/2023121208102Open ↗
Showing 3 of 16 on file for this type
▸BISSUPERSEDING LETTER6
10/31/2022121208102Open ↗
10/28/2022121208102Open ↗
01/03/2022121208102Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/27/2025141004062Open ↗
05/08/2024141006989Open ↗
11/09/2022141004543Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL2
10/14/2022123724309Open ↗
10/14/2022123724292Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
03/22/2023141021132Open ↗
Showing 1 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
01/22/2025141021132Open ↗
10/13/2022123724309Open ↗
10/13/2022123724292Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION32
02/09/2026140929967Open ↗
08/02/2023121208102Open ↗
05/24/2023121208102Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET8
06/24/2022123915709Open ↗
06/22/2022123915709Open ↗
Showing 2 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
03/22/2023141021132Open ↗
01/18/2022141006989Open ↗
09/03/2021141004641Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
08/02/2021121208102Open ↗
07/22/2021121208102Open ↗
Showing 2 of 3 on file for this type
▸Other Documents7
▸DOB NOWStructural Peer Review Report2
08/15/2026M00346356-I1Open ↗
08/14/2026M00346356-P1Open ↗
▸BISSHUTOFF DAMPERS1
03/01/2023121208102Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISUNDERPINNING1
10/24/2022121208102Open ↗
▸BISVESTIBULES1
02/17/2023121208102Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
03/01/2023121208102Open ↗