← Back
BuildNYC
Walk-up apt, over six families with stores
First Avenue Estate
1168 1ST AVENUE · BIN 1083901
💬 Discuss this project
1903Year Built
6Stories
C7Building Class
R8BZoning
206,701 sfGross Floor Area
335Units
LL97 CoveredRent Stabilized4 Active Violations ▸FISP: SAFE
Walk-up apt, over six families with stores · Owner of record: Stahl York Ave Co · 42,777 sf lot · 4.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Unit 2E, Unit 2FUnder Construction1p · 1 filing · 9 docs
Floor 1Apple Bank5p · 2 filings · 20 docs
CellarApple Bank7p · 4 filings · 20 docs
Site & exteriorApple Bank6p · 9 filings · 20 docs
Filed — no permit issued1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Stahl York Avenue Co1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CKL Engineering105/18/2026
Paknia Engineering306/03/2021
Leonard J. Strandberg & Assocaites103/25/2021
Shaaban Engineering807/07/2020
George Boyle103/17/2020
The Eipel Engineering Group112/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting803/21/2026
Efg Consulting403/21/2026
Kazam Consultants1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
National MaintenanceSign hanger807/08/2026
National MaintenanceElectrical403/21/2026
Taurino ManagementGeneral Contractor303/21/2026
Metrocity GroupPlumbing307/08/2026
Taurino ManagementScaffold107/08/2026
V. Vass ElectricElectrical103/21/2026
PCF Flooring & ContractorGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605105/18/2026
Paknia Engineering1462306/03/2021
The Eipel Engineering Group2714112/05/2019
Building Lifecycle
All (93)Filed (15)Permit Issued (14)Signed Off (11)Facade (FISP) (3)Violation (19)Objection (8)Special Inspection (23)
05/27/2026
Permit issued — General Construction
M01397083-I1-GC
05/18/2026
Filed — Alteration
MINOR INTERIOR RENOVATION TO EXISTING RESIDENTIAL UNITS AT APT 2E/2F TO COMBINE INTO ONE APT. NO CHNAG EIN USE EGRESS OR OCCUPANCY
M01397083-I1
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
05/04/2026
Special inspection requirement — Final
Cloud Lee
05/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES CHUN
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2021
Signed off — Alteration
FILING HEREWITH PLUMBING MODIFICATION AS INDICATED ON THE DRAWINGS. PLAN FILED IN CONJUNCTION WITH DOB JOB NUMBER: 123745876. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00239484-I1
09/18/2021
Cycle 9 facade report submitted
09/18/2021
Cycle 9 facade report signed — SAFE
09/08/2021
Cycle 9 facade inspection completed
07/23/2021
Violation issued (ECB, closed)
Local Law
06/30/2021
Signed off — Alteration
INSTALLATION OF AN A/C SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00239031-I1
06/03/2021
Filed — Alteration
INSTALLATION OF AN A/C SYSTEM AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
M00239031-P1
04/26/2021
Signed off — Alteration
M00332330-I1
04/01/2021
Violation issued (HPD, closed)
A
03/25/2021
Filed — Alteration
M00461480-I1
01/08/2021
Permit issued — Plumbing
M00239484-I1-PL
12/11/2020
Special inspection requirement — HVAC insulation and sealing
Edouard Paknia
12/11/2020
Special inspection requirement — Maintenance information
Edouard Paknia
12/11/2020
Special inspection requirement — Permanent certificate
Edouard Paknia
12/11/2020
Special inspection requirement — Shutoff dampers
Edouard Paknia
12/11/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edouard Paknia
12/11/2020
Special inspection requirement — Mechanical Systems
Edouard Paknia
12/11/2020
Special inspection requirement — Energy Code Compliance Inspections
Edouard Paknia
12/11/2020
Special inspection requirement — Final
Edouard Paknia
12/11/2020
Special inspection requirement — HVAC and service water heating system controls
Edouard Paknia
12/11/2020
Special inspection requirement — Electrical motors
Edouard Paknia
12/11/2020
Special inspection requirement — HVAC and service water heating equipment
Edouard Paknia
10/13/2020
Signed off — Alteration
M00350894-I1
10/13/2020
Signed off — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350893-I1
10/13/2020
Signed off — Alteration
Erect in-direct illuminated accessory business wall sign reading "AppleBank.com"
M00350891-I1
10/13/2020
Signed off — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank with Logo"
M00350888-I1
10/13/2020
Signed off — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank with Logo"
M00350889-I1
10/13/2020
Signed off — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350896-I1
10/13/2020
Signed off — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank"
M00350886-I1
10/13/2020
Signed off — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350892-I1
07/08/2020
Permit issued — Sign
M00350889-I1-SG
07/08/2020
Permit issued — Sign
M00350886-I1-SG
07/08/2020
Permit issued — Sign
M00350888-I1-SG
07/07/2020
Filed — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350893-I1
07/07/2020
Permit issued — Sign
M00350893-I1-SG
06/22/2020
Filed — Alteration
M00350894-I1
06/22/2020
Filed — Alteration
Erect in-direct illuminated accessory business wall sign reading "AppleBank.com"
M00350891-I1
06/22/2020
Filed — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank with Logo"
M00350888-I1
06/22/2020
Filed — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank with Logo"
M00350889-I1
06/22/2020
Filed — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350896-I1
06/22/2020
Filed — Alteration
Erect in-direct illuminated accessory business wall sign reading "Apple Bank"
M00350886-I1
06/22/2020
Filed — Alteration
Erect non-illuminated accessory business awning with .70 s.f. copy reading "Apple Bank with Logo"
M00350892-I1
06/22/2020
Permit issued — Sign
M00350892-I1-SG
06/22/2020
Permit issued — Sign
M00350891-I1-SG
06/22/2020
Permit issued — Sign
M00350894-I1-SG
06/22/2020
Permit issued — Sign
M00350896-I1-SG
06/09/2020
Permit issued — Mechanical Systems
M00239031-I1-MS
06/02/2020
Permit issued — Plumbing
M19310575-I1-PL
06/01/2020
Special inspection requirement — Final
AHMED SHAABAN
06/01/2020
Special inspection requirement — Final
AHMED SHAABAN
06/01/2020
Special inspection requirement — Final
AHMED SHAABAN
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPCF Flooring & Contractor05/27/2026
DOB NOWPlumbingSigned-offMetrocity Group01/08/2021
DOB NOWSignSigned-offNational Maintenance07/08/2020
DOB NOWSignSigned-offNational Maintenance07/08/2020
DOB NOWSignSigned-offNational Maintenance07/08/2020
DOB NOWSignSigned-offNational Maintenance07/07/2020
DOB NOWSignSigned-offNational Maintenance06/22/2020
DOB NOWSignSigned-offNational Maintenance06/22/2020
DOB NOWSignSigned-offNational Maintenance06/22/2020
DOB NOWSignSigned-offNational Maintenance06/22/2020
DOB NOWMechanical SystemsSigned-offTaurino Management06/09/2020
DOB NOWPlumbingSigned-offMetrocity Group06/02/2020
DOB NOWConstruction FenceSigned-offTaurino Management05/19/2020
DOB NOWPlumbingSigned-offMetrocity Group01/10/2020
BISOTISSUEDTaurino Management01/21/2020
BISOTISSUEDTaurino Management01/07/2020
BISOTISSUEDPoler Contracting04/29/2019
BISOTISSUED3 J'S Restoration03/04/2019
BISOTISSUED3 J'S Restoration04/13/2018
BISOTISSUED3 J'S Restoration03/10/2017
BISEQISSUEDRepublic Scaffold & Hoist10/24/2016
BISEQISSUEDRepublic Scaffold & Hoist10/19/2016
BISOTISSUED3 J'S Restoration03/10/2016
BISEQISSUED3 J'S Restoration02/23/2016
BISOTISSUED3 J'S Restoration11/23/2015
BISEQISSUEDRepublic Scaffold & Hoist10/22/2015
BISEQISSUEDRepublic Scaffold & Hoist10/22/2015
BISEQISSUEDPerimeter Bridge Scaff01/20/2004
7 projects · most recent 11/16/2020
General Wiring
FiledStatusContractorScope
11/16/2020Permit IssuedNational Maintenance—
11/16/2020Permit IssuedNational Maintenance—
11/16/2020Permit IssuedNational Maintenance—
11/16/2020Permit IssuedNational Maintenance—
10/01/2020CompleteA.S.K. ElectricalGeneral Wiring
01/09/2020CompleteA.S.K. Electrical—
04/21/2019Permit IssuedGoldman ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/05/2026Energy Code Compliance InspectionsJAMES CHUNprogress
05/05/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
05/05/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
05/04/2026FinalCloud Leeprogress
05/04/2026Tenant Protection Plan ComplianceJAMES CHUNspecial
12/11/2020HVAC insulation and sealing Edouard Pakniaenergy_progress
12/11/2020Maintenance informationEdouard Pakniaenergy_progress
12/11/2020Permanent certificateEdouard Pakniaenergy_progress
12/11/2020Shutoff dampersEdouard Pakniaenergy_progress
12/11/2020Fire-Resistant Penetrations and JointsEdouard Pakniaspecial
12/11/2020Mechanical SystemsEdouard Pakniaspecial
12/11/2020Energy Code Compliance InspectionsEdouard Pakniaprogress
12/11/2020FinalEdouard Pakniaprogress
12/11/2020HVAC and service water heating system controls Edouard Pakniaenergy_progress
12/11/2020Electrical motorsEdouard Pakniaenergy_progress
12/11/2020HVAC and service water heating equipment Edouard Pakniaenergy_progress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
06/01/2020FinalAHMED SHAABANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Apple BankBank / Financial branchCellar, Floor 1
Project M00350892 Alteration · LOC Issued · 06/22/2020
Project M00350896 Alteration · LOC Issued · 06/22/2020
Project M00227677 Alteration · Approved · 12/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 189 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Sign8
09/04/2026M00350886-I1Request digital key ↗
09/04/2026M00350889-I1Request digital key ↗
09/04/2026M00350896-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00239031-I1Request digital key ↗
08/15/2026M00239031-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00461480-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00239484-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00332330-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/17/2026M01397083-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00227677-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION14
11/18/2019123745876Open ↗
10/08/2019123745876Open ↗
02/12/2019140416271Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit14
09/04/2026M00350886-I1Open ↗
08/17/2026M01397083-I1Open ↗
08/13/2026M00350891-I1Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION13
01/22/2020123745876Open ↗
01/07/2020123745876Open ↗
04/29/2019123560565Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature19
09/12/2026M00350896-I1Open ↗
09/02/2026M00239031-P1Open ↗
09/02/2026M00239031-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00227677-I1Open ↗
09/05/2026M00332330-I1Open ↗
09/04/2026M00350886-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/08/2019123745876Open ↗
10/08/2019123745876Open ↗
10/08/2019123745876Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/22/2016140458877Open ↗
11/20/2015122544434Open ↗
11/20/2015122559908Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00239031-P1Open ↗
09/02/2026M00239031-P1Open ↗
09/01/2026M01397083-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/20/2015122544434Open ↗
11/20/2015122559908Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/22/2016140458877Open ↗
11/16/2015140416271Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/22/2016140458877Open ↗
11/16/2015140416271Open ↗
▸Safety & Tenant Protection16
▸DOB NOWTenant Protection Plan12
09/04/2026M00350886-I1Open ↗
08/13/2026M00239031-P1Open ↗
08/13/2026M00350891-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTenant Protection Plan and Notes3
10/08/2019123745876Open ↗
12/11/2018123560565Open ↗
02/22/2016140458877Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/11/2018123560565Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/05/2026M00227677-I1Open ↗
09/04/2026M00350886-I1Open ↗
09/03/2026M00239031-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/08/2019123745876Open ↗
12/11/2018123560565Open ↗
11/16/2015140416271Open ↗
▸Energy Compliance10
▸BISENERGY CODE 1ST REVIEW COMPLETE2
10/08/2019123745876Open ↗
01/31/2019123560565Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/23/2015140416271Open ↗
11/16/2015140416271Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00239031-I1Open ↗
08/13/2026M00239484-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/11/2019140416271Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/16/2015140416271Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2019140416271Open ↗
▸BISNYCECC ANALYSIS1
11/16/2015140416271Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/22/2016140458877Open ↗
11/23/2015140416271Open ↗
11/16/2015140416271Open ↗
▸Approvals, Objections & Sign-offs10
▸BISLANDMARKS APPROVAL5
01/06/2020123745876Open ↗
03/11/2019140416271Open ↗
01/31/2019123560565Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/11/2019140416271Open ↗
10/20/2017122559908Open ↗
10/20/2017122544434Open ↗
▸BISSHED LETTER2
11/07/2016122559908Open ↗
11/23/2015140416271Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/08/2019123745876Open ↗
03/11/2019140416271Open ↗
12/11/2018123560565Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms15
▸BISBOROUGH INTAKE FORM6
03/11/2019140416271Open ↗
02/11/2019140416271Open ↗
01/22/2019140416271Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
10/08/2019123745876Open ↗
12/11/2018123560565Open ↗
11/20/2015122544434Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
02/12/2019140416271Open ↗
04/25/2017122544434Open ↗
04/20/2017122544434Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/22/2016140458877Open ↗
11/16/2015140416271Open ↗
▸Other Documents3
▸DOB NOWDHCR Document2
08/13/2026M00332330-I1Open ↗
08/13/2026M00227677-I1Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
11/16/2015140416271Open ↗