← Back
BuildNYC
Elevator apt, fireproof without stores
1169 OCEAN AVENUE
BROOKLYN · BIN 3121396
💬 Discuss this project
1964Year Built
14Stories
D3Building Class
R7AZoning
99,482 sfGross Floor Area
96Units
LL97 CoveredRent Stabilized19 Active Violations 4 likely answered 7 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: As Towers · 11,000 sf lot · 9.04 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSteel chimney liner installation in masonry chimney3p · 4 filings · 16 docs
CellarSteel chimney liner installation in masonry chimney3p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
As Towers103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brad E. Cohen, PE207/12/2022
NB&C111/26/2019
Tectonic Engineering110/22/2019
Green Design105/04/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services303/21/2026
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cityline RestorationScaffold1307/08/2026
Service Tech Mechanicalspecialty_contractor407/08/2026
Service Tech Mechanical & PlumbingPlumbing207/08/2026
Vertical SolutionsGeneral Contractor203/21/2026
Solo Energy & ElectricalElectrical103/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Sba Network ServicesGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Brad E. Cohen, PE434107/12/2022
Burtner Engineering Services5910111/26/2019
Tectonic Engineering106110/22/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/29/2026
Cease use item: door zone restrictor inoperative as per asme A17.1-2013 / NYC appendix k 2.26.1.40.1 and 8.6.4.19. Remedy: correct and email the…
ECB violation · open
08/04/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/01/2026
97-x-17 the elevator in building out of service upon inspection the device is found to be out of service creating a hazardous condition as per…
ECB violation · open
05/06/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2A, 2nd…
HPD violation · closed
222 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offService Tech Mechanical08/10/2023
DOB NOWBoiler EquipmentSigned-offService Tech Mechanical & Plumbing08/08/2023
DOB NOWGeneral ConstructionSigned-offService Tech Mechanical07/18/2022
DOB NOWBoiler EquipmentSigned-offService Tech Mechanical & Plumbing07/15/2022
DOB NOWSidewalk ShedSigned-offCityline Restoration01/26/2022
DOB NOWSidewalk ShedSigned-offCityline Restoration03/16/2021
DOB NOWSidewalk ShedSigned-offCityline Restoration07/28/2020
DOB NOWAntennaPermit IssuedSba Network Services04/10/2020
DOB NOWAntennaPermit IssuedVertical Solutions01/06/2020
DOB NOWSidewalk ShedSigned-offCityline Restoration05/06/2019
DOB NOWSidewalk ShedSigned-offCityline Restoration05/05/2018
BISOTISSUEDCityline Restoration02/11/2020
BISOTISSUEDCityline Restoration02/12/2019
BISOTISSUEDCityline Restoration08/29/2018
BISOTISSUEDUmer Construction05/31/2018
BISOTISSUEDHarry Construction Group10/24/2017
BISEQISSUEDRoyal Khalsa General03/01/2017
BISEQISSUEDRoyal Khalsa General03/07/2016
BISEQISSUEDMetro Contracting NY11/23/2010
BISEQISSUEDKinsor Management08/26/1992
BISOTISSUEDKinsor Management08/26/1992
3 projects · most recent 10/20/2025
General Wiring Boiler Controls
FiledStatusContractorScope
10/20/2025Permit IssuedSolo Energy & ElectricalGeneral Wiring
02/07/2023CompleteLive Wire ElectricalBoiler Controls
05/04/2018Permit Issued4000 Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/05/2022Chimneys and ventsBrad Cohenspecial
07/05/2022FinalBrad Cohenprogress
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account