DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
ECB10/04/200850A,B,C. FULTON VT BOILER,10HP,NB 832271,OIL,1997.50A-NO SECONDARY SCREW TYPE DRAIN VALVE ON THE BLOWDOWN LINE.INSTALL A DRAIN VALVE.50B-INADEQUATE STRUCTURE SUPPORT OF THE LOADED FLUE PIPE SYSTEM.INSTALL ADDITNothing owed — awaiting certificate of correction
ECB04/13/1999INSTALLED AND OPERALED BOILER WITHOUT PERMIT AND EQUIPMENT USE PERMITNothing owed — awaiting certificate of correction