← Back
Two stories - detached, small or mid-size
117-14 228 STREET
QUEENS · Cambria Heights · BIN 4274577
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
1,840 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR102/12/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281102/12/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
02/04/2026
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 30 Panels, 10.95 kW
Q01001591-I1
02/28/2024
Permit issued — Solar
Q01001591-I1-SL
02/12/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 30 Panels, 10.95 kW
Q01001591-I1
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
02/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/06/2024
Special inspection requirement — Final
Mina Makar
02/06/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/21/2002
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR02/28/2024
BISPLISSUEDSAFEPIPE PLUMBING INC05/13/2016
BISPLISSUEDSAFEPIPE PLUMBING INC11/09/2001
BIS—ISSUEDFOUR DECADES CONTRACTING10/12/2001
1 project · most recent 02/12/2024
FiledStatusContractorScope
02/12/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/06/2024Fire-Resistant Penetrations and JointsMina Makarspecial
02/06/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
02/06/2024Energy Code Compliance InspectionsMina Makarprogress
02/06/2024FinalMina Makarprogress
02/06/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q01001591-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026Q01001591-I1Open ↗
08/24/2026Q01001591-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01001591-I1Open ↗
08/24/2026Q01001591-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01001591-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01001591-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/16/2016401305912Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01001591-I1Open ↗