DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
HPD09/25/2023§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY
HPD09/25/2023§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH WALL AT PUBLIC HALL, 2nd STORY
HPD09/25/2023§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AT PUBLIC HALL, 2nd STORY
HPD09/25/2023§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB03/27/2015STOP WORK ORDER ISSUED - ACCESS TO PREMISES TO INSPECT APPROVED WORK UNDER APP #121897732 ATL 2 WITH PERMITS SET TO EXPIRED 5/12/15 REMEDY: STOP ALL WORK UNDER CITE APPLICATION PROVIDE ACCESS TO DEPT PERSONNELL
ECB12/28/2017RUN ELECTRICAL WIRES & INSTALL THREE CEILING FIXTURES AT STORM-ENCLOSURE,W/O A PERMIT. REMEDY: COMPLY W/NOTICE OF VIOLATION.Nothing owed — awaiting certificate of correction