← Back
Two stories - detached, small or mid-size
117-28 200 STREET
QUEENS · St. Albans · BIN 4271793
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4AZoning
1,780 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,100 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
CUNNINGHAM ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/14/2023
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
04/12/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00973466-I1
01/03/2024
Permit issued — Solar
Q00973466-I1-SL
12/14/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00973466-I1
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/07/2023
Special inspection requirement — Final
Walid Abdulla
12/07/2023
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/02/2008
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/03/2024
2 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023CompleteSUNRUN SOLAR ELECTL CORP—
12/08/2023CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/07/2023Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/07/2023Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/07/2023Energy Code Compliance InspectionsWalid Abdullaprogress
12/07/2023FinalWalid Abdullaprogress
12/07/2023Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026Q00973466-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00973466-I1Open ↗
09/01/2026Q00973466-I1Open ↗
09/01/2026Q00973466-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00973466-I1Open ↗
09/01/2026Q00973466-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00973466-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00973466-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00973466-I1Open ↗