← Back
Two family frame
117-28 VAN WYCK EXPRESSWAY
QUEENS · South Ozone Park · BIN 4253170
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3-2Zoning
—Gross Floor Area
2Units
Two family frame · 0.81 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1p · 1 filing · 9 docs
Floor 11p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/07/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
12/31/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01267313-I1
08/14/2025
Permit issued — Solar
Q01267313-I1-SL
08/07/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01267313-I1
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/06/2025
Special inspection requirement — Final
Walid Abdulla
08/06/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/14/2025
BISOTISSUEDTRINITY SOLAR LLC02/15/2018
2 projects · most recent 08/07/2025
FiledStatusContractorScope
08/07/2025CompleteSUNRUN SOLAR ELECTL CORP—
03/17/2018CompleteREDLINE ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/06/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/06/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/06/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/06/2025FinalWalid Abdullaprogress
08/06/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01267313-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/13/2018440459512Open ↗
▸BISWORK PERMIT APPLICATION1
02/13/2018440459512Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026Q01267313-I1Open ↗
08/28/2026Q01267313-I1Open ↗
08/28/2026Q01267313-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01267313-I1Open ↗
08/28/2026Q01267313-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/13/2018440459512Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/13/2018440459512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/13/2018440459512Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01267313-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/13/2018440459512Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/13/2018440459512Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01267313-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/11/2019440459512Open ↗
02/13/2018440459512Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/13/2018440459512Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/11/2019440459512Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
05/06/2019440459512Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/13/2018440459512Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/13/2018440459512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/13/2018440459512Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/11/2019440459512Open ↗
04/11/2019440459512Open ↗
02/13/2018440459512Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
02/13/2018440459512Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/13/2018440459512Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/13/2018440459512Open ↗
▸Approvals, Objections & Sign-offs5
▸BISUtility Company PV System Interconnection Acknowledgement Letter3
05/30/2019440459512Open ↗
05/06/2019440459512Open ↗
04/11/2019440459512Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/11/2019440459512Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01267313-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/11/2019440459512Open ↗
02/13/2018440459512Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/30/2018440459512Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/13/2018440459512Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/11/2019440459512Open ↗