← Back
One story - permanent living quarter
117-29 195 STREET
QUEENS · BIN 4271640
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R3AZoning
1,125 sfGross Floor Area
1Units
One story - permanent living quarter · 5,000 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 19 docs
Cellar1p · 1 filing · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2021$650K—Private party → Private party$578/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.404/16/2026
MEI ARCHITECT PLLC109/30/2025
NTA DESIGN GROUP, LLC102/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TAG TEAM GROUP203/21/2026
ALPHA HOME DESIGN LLC403/21/2026
Building Lifecycle
All (58)Filed (6)Objection (22)Special Inspection (30)
04/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF FOUNDATION AND SOE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01263207-S3
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
04/14/2026
Special inspection requirement — Sprinkler Systems
MEHDI GHAZI
04/14/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
04/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
03/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF FOUNDATION AND SOE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01263207-S1
03/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF FOUNDATION AND SOE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01263207-S2
03/20/2026
Special inspection requirement — Subgrade Inspections
03/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/20/2026
Special inspection requirement — Concrete - Cast-In-Place
03/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/05/2026
Special inspection requirement — Final
02/05/2026
Special inspection requirement — Footing and Foundation
12/16/2025
Filed — Alteration
Q01294909-I1
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
11/17/2025
Objection resolved — Addressed
10/27/2025
Objection raised — Admin
10/27/2025
Objection raised — Energy
10/27/2025
Objection raised — Structural
10/27/2025
Objection raised — Structural
10/27/2025
Objection raised — Admin
10/27/2025
Objection raised — Inspections
09/30/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF FOUNDATION AND SOE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01263207-I1
08/08/2025
Special inspection requirement — Metering
08/08/2025
Special inspection requirement — Ventilation and air distribution system
08/08/2025
Special inspection requirement — Protection of exposed foundation insulation
08/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
08/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
08/08/2025
Special inspection requirement — Air barrier - visual inspection
08/08/2025
Special inspection requirement — Fenestration air leakage
08/08/2025
Special inspection requirement — Maintenance information
08/08/2025
Special inspection requirement — Heating Systems
08/08/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
08/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/08/2025
Special inspection requirement — Fenestration areas
08/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/08/2025
Special inspection requirement — Insulation placement and R values
02/23/2024
Objection raised — Structural
02/23/2024
Objection raised — Zoning
02/23/2024
Objection raised — Zoning
02/23/2024
Objection raised — Scope
02/23/2024
Objection raised — Energy
02/23/2024
Objection raised — Inspections
02/23/2024
Objection raised — Inspections
02/23/2024
Objection raised — Zoning
02/23/2024
Objection raised — Zoning
02/23/2024
Objection raised — Zoning
02/14/2024
Filed — New Building
APPLICATION FILED FOR NEW TWO CAR GARAGE ACCESSORY TO DWELLING AS PER PLANS
Q01001357-I1
Nothing on file for this building.
1 project · most recent 04/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2026——Heating and Air Conditioning Systems
Heat / Cool
Lg KUMXB361A 32,800 BTU · Vrf Outdoor ×4
KUMXB241A 24,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 04/16/2026
Sprinkler System
FiledStatusContractorScope
04/16/2026——Sprinkler System
1 project · most recent 04/16/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
04/16/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 05/10/2022
FiledStatusContractorScope
05/10/2022Permit IssuedTRIPLE T ELECTRIC INC1 meters, 1 new_meters
1 project · most recent 04/16/2026
FiledStatusContractorScope
04/16/2026——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/16/2026Fire-Resistant Penetrations and Joints—special
04/14/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
04/14/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
04/14/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
04/14/2026Sprinkler SystemsMEHDI GHAZIspecial
04/14/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
04/14/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
04/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
03/20/2026Subgrade Inspections—special
03/20/2026Subsurface Investigations (Borings/Test Pits)—special
03/20/2026Concrete - Cast-In-Place—special
03/20/2026Excavations - Sheeting, Shoring, and Bracing—special
02/05/2026Structural Stability – Alterations of existing buildings—special
02/05/2026Final—progress
02/05/2026Footing and Foundation—progress
08/08/2025Metering—energy_progress
08/08/2025Ventilation and air distribution system—energy_progress
08/08/2025Protection of exposed foundation insulation—energy_progress
08/08/2025Fenestration and door U-factor and product ratings—energy_progress
08/08/2025Duct leakage testing, insulation and design—energy_progress
08/08/2025Air barrier - visual inspection—energy_progress
08/08/2025Fenestration air leakage—energy_progress
08/08/2025Maintenance information—energy_progress
08/08/2025Heating Systems—special
08/08/2025Subsurface Investigations (Borings/Test Pits)—special
Latest 25 of 44.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026Q01001357-I1Request digital key ↗
08/18/2026Q01294909-I1Request digital key ↗
08/17/2026Q01263207-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01263207-I1Open ↗
08/13/2026Q01001357-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01263207-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01263207-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026Q01294909-I1Open ↗
08/17/2026Q01263207-S2Open ↗
08/17/2026Q01263207-S1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01263207-S2Open ↗
08/17/2026Q01263207-S1Open ↗
08/17/2026Q01263207-S3Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/17/2026Q01263207-S1Open ↗
08/13/2026Q01263207-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/13/2026Q01263207-I1Open ↗
08/13/2026Q01001357-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01263207-I1Open ↗
08/13/2026Q01001357-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01263207-I1Open ↗