ECB11/17/2025AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/05/2024 BY BADGE 2815, WORK WITHOUT A REQUIRED DEMOLITION PERMIT. NOTED : THE ENTIRE GARAGE AT REAR WAS DEMOLISHED WITHOUT THE REQUIRED PERMITS . THERE$25K due
ECB11/17/2025AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/05/2024 BY BADGE 2815 ,FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED , OBSERVED AT REAR OF 6 ANDREASE STREET, THERE ARE SLABS OF CON$12K due
ECB04/24/2025WORK WITHOUT PERMIT . AT TIME OF INSPECTION OF A 2 STORY .I OBSERVED AT FRONT EXPO. 1 A PORTION OF SIDEWALK HAS BEEN CUT APPROX.9FT 4 INCH LONG AND LOWERED ENABLING VEHICLE TO DRIVE ONTO AN ILLEGAL OFF-STREET P$280 due
Two stories - detached, small or mid-size · 5,000 sf lot · 0.34 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.